网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A customer has been receiving warning alerts on their storage units. All data is protected nightlyby a backup and has been tested without any issues. What should the customer do prior tocontacting IBM Support?()
A

collect all support data

B

implement a current backup

C

update all firmware levels

D

shut down the storage system


参考答案

参考解析
解析: 暂无解析
更多 “单选题A customer has been receiving warning alerts on their storage units. All data is protected nightlyby a backup and has been tested without any issues. What should the customer do prior tocontacting IBM Support?()A collect all support dataB implement a current backupC update all firmware levelsD shut down the storage system” 相关考题
考题 听力原文:If a customer informs his bank that a draft which has been issued to him has been lost, the drawee bank should be noticed immediately.(8)A.The customer should first notify the drawee bank of the loss of his draft.B.The customer should first notify the drawer bank of the loss of his draft.C.The customer should first notify the remitting bank of the loss of his draft.D.The customer should first notify the collecting bank of the loss of his draft.

考题 One of the two systems established by GMDSS for the transmission and automatic receipt of Maritime Safety Information is______.A.Initial Distress Alerts serviceB.Navigational Warning serviceC.INMARSAT Safety Net serviceD.Meteorological Warning service

考题 The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?() A. capacity above 500 TBB. first in customer locationC. a new model has been releasedD. sold without implementation service

考题 According to the manager of ABB Corp., this new service _______ very positively by customers who get the service details and cost information quicker.A.has received B.has been received C.have received D. has been receiving

考题 The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()A、capacity above 500 TBB、first in customer locationC、a new model has been releasedD、sold without implementation service

考题 While setting up the threshold for tablespace space usage metrics for one of your tablespaces, you define the critical threshold as 60% and warning threshold as 75%. What would be the result of this setting?()A、 It would result in an error because the warning threshold cannot be more than the critical threshold.B、 The warning threshold is ignored and alerts would be generated when space usage exceeds the critical threshold.C、 The critical threshold is ignored and alerts would be generated when space usage exceeds the warning threshold.D、 Both threshold values are used and alerts are generated when space usage exceeds the respective threshold values.

考题 You have specified the warning and critical threshold values of an application tablespace to be 60% and 70% respectively. From the tablespace space usage metrics, you find that the actual space usage has reached the specified warning threshold value, but no alerts have been generated. What could be the reason for this?()A、 The EVENT parameter was not setB、 The SQL_TRACE parameter is set to FALSEC、 The Enterprise Manager Grid Control is not usedD、 The STATISTICS_LEVEL parameter is set to BASICE、 The TIMED_STATISTICS parameter is set to FALSE

考题 When creating a list of vendors, which of the following information should be included?()A、Vendor customer satisfaction ratingsB、OEM contact informationC、Time vendor has been in businessD、Annual spending budget with the vendor

考题 A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()A、Ensure Director Agent is installed on the new servers.B、Ensure a DHCP Sever is installed and configured in the environment.C、Ensure Server Plus Pack option has been installed and configured.D、Ensure Software Distribution has been installed on the IBM Director Server and an image has been created.E、Ensure Remote Deployment Manager has been installed on the IBM Director Server and an image has been created.

考题 A solution provider has proposed a pSeries solution to a new customer.  The solution is complex with a number of technologies that are new to the customer. They have a tight timeline for implementation.  The solution provider has not been able to get a clear understanding as to how the customer will backup the system.  What would be the most appropriate action to address the risks with this solution?()A、Sell SysbackB、Conduct a SARC、Sell SupportlineD、Provide a project timeline

考题 A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()A、A solution sizing questionnaireB、Verify the customer has the proper racksC、A Technical Delivery AssessmentD、Verify the customer has enough cooling in the computer room

考题 A customer has been quoted a DS8800. Which part of the TDA process would ensure that there isenough power in the customer location to operate the system?()A、 Pre-sale B、 Post-sale C、 Pre-install D、 Post-install

考题 An opportunity has been successfully won by a Business Partner in collaboration with IBM. Whohas responsibility for conducting the TDA process?()A、the customer alone B、the Business Partner C、IBM and the customer D、the Business Partner and IBM jointly

考题 You work as a database administrator for Certkiller .com. Users complain that their query is taking a long time to complete. You suspect the database buffer cache size to be the reason, and you define an alert to be generated when the buffer cache hit metric goes below 85%. When you observe the dynamic performance views, you find that the buffer cache hit ratio is 81% but no alerts are being generated.  What could be the reason for this problem?()A、The advisory memory has been turned off.B、The DB_CACHE_ADVICE parameter has been set to OFF in the parameter file.C、The STATISTICS_LEVEL parameter has been set to BASIC in the parameter file.D、The TIMED_STATISTICS parameter has been set to FALSE in the parameter file.E、The STATISTICS_LEVEL parameter has been set to TYPICAL in the parameter file.

考题 View the Exhibit to examine the output of the DBA_OUTSTANDING_ALERTS view. After 30 minutes, you executed the following command:  SQL SELECT reason,metric_value FROM dba_outstanding_alerts; REASON         METRIC_VALUE  ------------------------------------------------------------  ------------  Tablespace [TEST] is [28 percent]full  28.125  What could be the reason for the elimination of the other rows in the output()A、An Automatic Workload Repository snapshot has been taken recently.B、The non-threshold-based alerts are transferred to DBA_ALERT_HISTORY.C、The threshold alerts conditions are cleared and the alerts are transferred to DBA_ALERT_HISTORY.D、The threshold alerts related to database metrics are permanently stored in DBA_ALERT_HISTORY but not the threshold alerts related to instance metrics.

考题 You define an alert to be raised when the USERS tablespace usage has reached 80% of the total space. Which area would you refer to, in order to confirm that the alert has been raised due the event?()A、the alert.log fileB、the DBA_ALERTS viewC、the Database Control Home pageD、the Database Control performance pageE、the Database Control Maintenance page

考题 单选题An opportunity has been successfully won by a Business Partner in collaboration with IBM. Whohas responsibility for conducting the TDA process?()A the customer alone B the Business Partner C IBM and the customer D the Business Partner and IBM jointly

考题 单选题A customer has been quoted a DS8800. Which part of the TDA process would ensure that there isenough power in the customer location to operate the system?()A  Pre-sale B  Post-sale C  Pre-install D  Post-install

考题 单选题While performing monitoring and tuning the database, you want to view the summarized information about the warning level alerts and critical level alerts. Which section of the Oracle Enterprise manager displays the summarized information about the warning and critical level alerts?()A GeneralB  High AvailabilityC  Space UsageD  Diagnostic Summary

考题 单选题The customer is considering an IBM System Storage DS8000. Which of the following indicates a requirement for the Business Partner to perform a TDA?()A capacity above 500 TBB first in customer locationC a new model has been releasedD sold without implementation service

考题 单选题You have specified the warning and critical threshold values of an application tablespace to be 60% and 70%, respectively. From the tablespace space usage metrics, you find that the actual space usage has reached the specified warning threshold value, but no alerts have been generated.  What could be the reason for this?()A The EVENT parameter was not set.B The SQL_TRACE parameter is set to FALSEC The Enterprise Manager Grid Control is not used.D The STATISTICS_LEVEL parameter is set to BASICE The TIMED_STATISTICS parameter is set to FALSE

考题 单选题You have specified the warning and critical threshold values of an application tablespace to be 60% and 70% respectively. From the tablespace space usage metrics, you find that the actual space usage has reached the specified warning threshold value, but no alerts have been generated. What could be the reason for this?()A  The EVENT parameter was not setB  The SQL_TRACE parameter is set to FALSEC  The Enterprise Manager Grid Control is not usedD  The STATISTICS_LEVEL parameter is set to BASICE  The TIMED_STATISTICS parameter is set to FALSE

考题 单选题Upon announcement,the specific details surrounding the Virtual I/O Server requirements and performance are still being defined.  The customer has engaged IBM to provide a server consolidation solution and would like to take advantage of the VIO Server benefits. How should the pSeries technical specialist best address this?()A Design the solution and present it confidently so the customer does not question it.B Design the solution and ensure the customer understands the unknowns with the new technology.C Explain to the customer that the VIO Server does not benefit them when doing server consolidation so it has not been configured.D Explain to the customer that the details surrounding the VIO Server have not been clearly defined so designing a solution is premature.

考题 单选题While setting up the thresholds for tablespace space usage metrics for one of your tablespaces, you define the critical threshold as 60% and warning threshold as 75%. What would be the result of this setting?()A It would result in an error because the warning threshold cannot be more than the critical threshold.B The warning threshold is ignored and alerts would be generated when space usage exceeds the critical threshold.C The critical threshold is ignored and alerts would be generated when space usage exceeds the warning threshold.D Both threshold values are used and alerts are generated when space usage exceeds the respective threshold values.

考题 单选题You work as a database administrator for Supportcenter.cn. Users complain that their query is taking a long time to complete. You suspect the database buffer cache size to be the reason, and you define an alert to be generated when the buffer cache hit metric goes below 85%. When you observe the dynamic performance views, you find that the buffer cache hit ratio is 81% but no alerts are being generated.  What could be the reason for this problem?()A The advisory memory has been turned off.B The DB_CACHE_ADVICE parameter has been set to OFF in the parameter file.C The STATISTICS_LEVEL parameter has been set to BASIC in the parameter file.D The TIMED_STATISTICS parameter has been set to FALSE in the parameter file.E The STATISTICS_LEVEL parameter has been set to TYPICAL in the parameter file.

考题 单选题View the Exhibit to examine the output of the DBA_OUTSTANDING_ALERTS view. After 30 minutes, you executed the following command:  SQL SELECT reason,metric_value FROM dba_outstanding_alerts; REASON         METRIC_VALUE  ------------------------------------------------------------  ------------  Tablespace [TEST] is [28 percent]full  28.125  What could be the reason for the elimination of the other rows in the output()A An Automatic Workload Repository snapshot has been taken recently.B The non-threshold-based alerts are transferred to DBA_ALERT_HISTORY.C The threshold alerts conditions are cleared and the alerts are transferred to DBA_ALERT_HISTORY.D The threshold alerts related to database metrics are permanently stored in DBA_ALERT_HISTORY but not the threshold alerts related to instance metrics.

考题 单选题A customer has been working with your company to purchase an iDataPlex cluster. They have a configuration from IBM and are getting ready to place an order. Which should be done of the following?()A A solution sizing questionnaireB Verify the customer has the proper racksC A Technical Delivery AssessmentD Verify the customer has enough cooling in the computer room