The resource group configuration for a four node cluster is shown below:Which resource groups will be acquired by node N2 if it joins the cluster first?()
- A、rgC、rgE
- B、rgC、rgD
- C、rgE、rgB、rgD
- D、rgC、rgD、rgE
参考答案
更多 “The resource group configuration for a four node cluster is shown below:Which resource groups will be acquired by node N2 if it joins the cluster first?()A、rgC、rgEB、rgC、rgDC、rgE、rgB、rgDD、rgC、rgD、rgE” 相关考题
考题
Resource leveling _____.A.Allocates resources to activities to find shortest schedule within fixed resource limits.B.Smoothes out resource requirements by rescheduling activities within their float time.C.Smooths out resource requirements by substituting activities with unassigned resources.D.Attempts to reduce resource requirements within a constraint on project durationE.B or D
考题
171 Resource leveling _____.A. Allocates resources to activities to find shortest schedule within fixed resource limits.B. Smoothes out resource requirements by rescheduling activities within their float time.C. Smooths out resource requirements by substituting activities with unassigned resources.D. Attempts to reduce resource requirements within a constraint on project durationE. B or D
考题
The process of()schedule activity durations uses information on schedule activityscope of work, required resource types, estimated resource quantities, and resource calendarswith resource availabilities.A.estimatingB.definingC.planningD.sequencing
考题
The process of()schedule activity durations uses information on schedule activity scope of work, required resource types, estimated resource quantities, and resource calendars with resource availabilities.A.estimatingB.definingC.planningD.sequencing
考题
● Resource leveling _____.A Allocates resources to activities to find shortest schedule within fixed resource limits.B Smoothes out resource requirements by rescheduling activities within their float time.C Smooths out resource requirements by substituting activities with unassigned resources.D Attempts to reduce resource requirements within a constraint on project durationE B or D
考题
Estimating activity durations uses information on activity scope of(74) , required resource types, estimated resource quantities, and resource calendars.A.milestoneB.baselineC.qualityD.work
考题
● Estimating activity durations uses information on activity scope of (74),required resource types, estimated resource quantities, and resource calendars.(74)A. milestoneB. baselineC. qualityD. work
考题
X2AP的Resource Status Reporting Initiation过程通过那条消息发起?A.RESOURCE STATUS UPDATEB.RESOURCE STATUS REQUESTC.RESOURCE STATUS RESPONSED.ENB CONFIGURATION UPDATE
考题
The process of(72)schedule activity durations uses information on schedule activity scope of work,required resource types,estimated resource quantities,and resource calendars with resource availabilities.A.estimatingB.definingC.planningD.sequencing
考题
WhichoftheserepresentthemaincomponentsofDatabaseResourceManager?()
A.ResourceconsumergroupsB.ResourceplansC.Resource-plangroupsD.Resource-plandirectivesE.Alloftheabove
考题
TD-LTE最小的时频资源单位是()。
A.Resource ELementB.Resource Element groupC.Control Channel ElementD.Resource Block
考题
TD-LTE最小的时频资源单位是()。A、Resource ELementB、Resource Element groupC、Control Channel ElementD、Resource Block
考题
X2AP的ResourceStatusReportingInitiation过程通过那条消息发起A、RESOURCE STATUS UPDATEB、RESOURCE STATUS REQUESTC、RESOURCE STATUS RESPONSED、ENB CONFIGURATION UPDATE
考题
An administrator uses C-SPOC to change the user password for all nodes that belong to a Resource group. The administrator must perform this operation on a node that is:() A、 included in the resource group.B、 currently managing the resource group.C、 not part of an application resource group.D、 included in a cluster_admin resource group.
考题
To load the base operating system on a machine using NIM, what are the minimum NIM resources that must be defined for the installation to succeed()A、A mksysb resource, a SPOT resource, and an lpp_source resourceB、A SPOT resource, an lpp_source resource, and a machine definitionC、An lpp_source resource, a mksysb resource, and a machine definitionD、A SPOT resource, an lpp_source resource, a bosinst_data resource, and a machine definition
考题
When an emulated error notification method is complete, an administrator can view the error log By typing the errpt command to be sure the emulation took place. To verify that the error log entry is the result of the emulated event,the log entry resource name is set to EMULATOR,or which of the following?() A、 A user defined Resource NameB、 A cluster defined Resource NameC、 An error daemon specific Resource NameD、 A Resource Name generated by Automatic Error Notification
考题
To load a base operating system on a machine using NIM, what are the minimum NIM resources that must be defined for the installation to succeed?()A、A mksysb resource, a SPOT resource, and an lpp_source resourceB、A SPOT resource, an lpp_source resource, and a machine definitionC、An lpp_source resource, a mksysb resource, and a machine definitionD、A SPOT resource, an lpp_source resource, a machine definition, and a bootable CD
考题
Which of these represent the main components of Database Resource Manager?()A、 Resource consumer groupsB、 Resource plansC、 Resource-plan groupsD、 Resource-plan directivesE、 All of the above
考题
You are creating the simple resource plan using the DBMS_RESOURCE_MANAGER.CREATE_SIMPLE_PLAN procedure. Which resource allocation policy will be used for the resource plan?() A、 RATIOB、 EMPHASISC、 ACTIVE_SESS_POOL_MTHD、 RESOURCE_DEGREE_LIMIT_ABSOLUTE
考题
An HACMP setting timer may used to allow:() A、 The setting or fallback of a cluster custom resource groupB、 The cluster time to stabilize before starting a custom resource groupC、 A priority node time to acquire custom resource group at cluster startD、 A fallover node time to process custom resource states to be monitored
考题
单选题You are creating the simple resource plan using the DBMS_RESOURCE_MANAGER.CREATE_SIMPLE_PLAN procedure. Which resource allocation policy will be used for the resource plan?()A
RATIOB
EMPHASISC
ACTIVE_SESS_POOL_MTHD
RESOURCE_DEGREE_LIMIT_ABSOLUTE
考题
单选题To load a base operating system on a machine using NIM, what are the minimum NIM resources that must be defined for the installation to succeed?()A
A mksysb resource, a SPOT resource, and an lpp_source resourceB
A SPOT resource, an lpp_source resource, and a machine definitionC
An lpp_source resource, a mksysb resource, and a machine definitionD
A SPOT resource, an lpp_source resource, a machine definition, and a bootable CD
考题
单选题An HACMP setting timer may used to allow:()A
The setting or fallback of a cluster custom resource groupB
The cluster time to stabilize before starting a custom resource groupC
A priority node time to acquire custom resource group at cluster startD
A fallover node time to process custom resource states to be monitored
考题
单选题You create two resource plans, one for data warehouse loading jobs at night and the other for application jobs at day time. You want the resource plans to activate automatically so that the resource allocation is optimum as desired by the activity.How would you achieve this?()A
Implement job classesB
Implement Scheduler windowsC
Implement the mapping rule for the consumer groupsD
Set the SWITCH_TIME resource plan directive for both the resource plans
考题
单选题You have created a resource plan, DB_PLAN, using DBMS_RESOURCE_MANAGER.CREATE_SIMPLE_PLAN and you want to impose a restriction on utilization of resources by the database users. Which step must be performed before you can start using the resource plan?()A
assign users to consumer groupsB
set the resource plan for the instanceC
configure a simple resource plan and specify plan directivesD
configure a complex resource plan and specify plan directives
考题
单选题You create two resource plans,one for data warehouse loading jobs at night and the other for application jobs at day time. You want the resource plans to activate automatically so that the resource allocation is optimum as desired by the activity. How would you achieve this?()A
Implement job classesB
Implement Scheduler windowsC
Implement the mapping rule for the consumer groupsD
Set the SWITCH_TIME resource plan directive for both the resource plans
考题
单选题To load the base operating system on a machine using NIM, what are the minimum NIM resources that must be defined for the installation to succeed()A
A mksysb resource, a SPOT resource, and an lpp_source resourceB
A SPOT resource, an lpp_source resource, and a machine definitionC
An lpp_source resource, a mksysb resource, and a machine definitionD
A SPOT resource, an lpp_source resource, a bosinst_data resource, and a machine definition
考题
单选题You have created a resource plan, DB_PLAN, using DBMS_RESOURCE_MANAGER.CREATE_SIMPLE_PLAN and you want to impose a restriction on utilization of resources by the database users. Which step must be performed before you can start using the resource plan?()A
assign users to consumer groupsB
set the resource plan for the instanceC
configure a simple resource plan and specify plan directivesD
configure a complex resource plan and specify plan directives