A p5-570 8-way 32GB system has been proposed to a customer as a new test system with four LPARs. The current applications are certified on AIX 5.2 but not yet on AIX 5.3. The customer wants to understand the advantages and disadvantages of this solution versus a pair of 4-way p5-550s with 16GB each in testing their current applications. Which of the following points should the pSeries technical specialist highlight?()
- A、The p5-570 would save rack space over a pair of p5-550 servers.
- B、The p5-570 allows for more CPU and memory resources to be dynamically allocated to any LPAR for performance testing.
- C、The p5-570 can only be upgraded to 64GB of RAM without replacing memory.
- D、The p5-570 supports advanced features such as Micro-Partitioning and Virtual I/O allowing more LPARs of the customer’s applications with fewer processors and fewer I/O adapters.
参考答案
更多 “A p5-570 8-way 32GB system has been proposed to a customer as a new test system with four LPARs. The current applications are certified on AIX 5.2 but not yet on AIX 5.3. The customer wants to understand the advantages and disadvantages of this solution versus a pair of 4-way p5-550s with 16GB each in testing their current applications. Which of the following points should the pSeries technical specialist highlight?()A、The p5-570 would save rack space over a pair of p5-550 servers.B、The p5-570 allows for more CPU and memory resources to be dynamically allocated to any LPAR for performance testing.C、The p5-570 can only be upgraded to 64GB of RAM without replacing memory.D、The p5-570 supports advanced features such as Micro-Partitioning and Virtual I/O allowing more LPARs of the customer’s applications with fewer processors and fewer I/O adapters.” 相关考题
考题
A customer wants to run eight production partitions each with the following: ? 0.7 CPU 1.65-GHz ? 4GB of RAM ? 2 Ethernet adapters They do not have room for many RIO drawers since rack space is currently scarce in their data center. They have significant unused SAN attached disk. In addition to the Advanced POWER Virtualization feature, which of the following is the minimum recommended configuration needed to meet the customer’s requirements?()A、p5-570 6-way 1.65-GHz, 32GBB、p5-570 8-way 1.65-GHz, 32GBC、p5-570 6-way 1.65-GHz, 48GBD、p5-570 8-way 1.65-GHz, 48GB
考题
A company wants to replace an existing UNIX database server with a new application running on Microsoft SQL Server. Sizing analysis shows that a system with at least eight Xeon MP processors and 24GB RAM will be required for the central database server. Which of the following will meet the requirements at the lowest cost?()A、8-way x445 with Microsoft Windows Server 2003 Standard EditionB、8-way x445 with Microsoft Windows Server 2003 Datacenter EditionC、8-way x445 with Microsoft Windows Server 2003 Enterprise EditionD、16-way x445 with VMWare ESX with SMP and Windows Server 2003 Standard Edition VMs
考题
A researcher needs to regularly analyze large quantities of data. They are interested in putting together a cluster of 16 UDB EEE partitions of four processors each for their data mining environment. Each UDB partition needs to be approximately 15 rPerf. Which of the following solutions would best fit their performance needs?()A、p655 4-way nodesB、p655 8-way nodesC、p5-570 4-way nodesD、p5-570 8-way nodes
考题
A customer is considering multiple options for a particular set of workloads on AIX v5.2. They need to run ten identical LPARS, each containing four fibre cards, two 2-port Ethernet cards, and one SCSI card as well as two internal boot disks. They want the LPARS to be split across two physical systems for redundancy purposes; cost is an issue. They need a total of approximately 40 rPerf for all ten workloads. Which of the following solutions best fits these needs?()A、2 x p655 1.7ghz 8-way servers (21.87 rPerf each)B、2 x p670 1.5ghz 8-way servers (24.18 rPerf each)C、2 x p690 1.7ghz 8-way servers (27.11 rPerf each)D、2 x p650 1.45ghz 8-way servers (18.67 rPerf each)
考题
A customer has an 8-way p5-570 with eight internal disk drives and AIX 5.2. Which of the following must be added, if anything, to the configuration to support four LPARs, assuming each LPAR requires twodisk drives?()A、7311-D20 drawer with four disksB、Upgrade to AIX 5.3C、Fiber adapters to attach to SAND、Nothing
考题
Companycom has purchased a p5 590 with 16 CPUs. To run Simultaneous Multi-Threading (SMT) with a 4-way virtual processor partition with 2.0 processing units of entitlement, how many logical CPUs will be allocated?()A、8-way logical CPU partition, where each logical CPU has the power of 25% of a logical processor B、4-way logical CPU partition, where each logical CPU has the power of 50% of a physical processor C、8-way logical CPU partition, where each logical CPU has the power of 25% of a physical processor D、16-way logical CPU partition, where each logical CPU has the power of 25% of a physical processor
考题
Company.com has ordered an 8-way p5-570 and plans to deploy four AIX 5L v5.3 LPARs. The pre-installation system design has all eight processors being placed in the shared processor pool, and four Micro-Partitions being assigned resources from the pool. Prior to the implementation of the system, the customer informs the technical specialist that one of the applications is only supported on AIX 5L 5.2. Which of the following changes to the system design should the technical specialist make to accommodate this change?()A、Create all the partitions as AIX 5.2, each having two dedicated processors.B、Purchase a system with two additional processors that can be assigned to the AIX 5.2 Partition.C、Specify an AIX 5.2 partition using dedicated processors, reducing the number of processors in the shared pool.D、Use the virtual I/O server to manage the disks and network connections removing the need for different levels of device drivers.
考题
A customer had been given a proposal for a p5-570 6-way 32GB system running in Full Partition mode. After review, the customer asked that the configuration be modified to enhance the reliability and availability of the solution. However, the customer does not want to pay for HACMP or additional machines. What change would be most likely to improve the reliability of the solution?()A、Add CUoD memory.B、Provide CUoD processors.C、Provide redundant disks on separate SCSI buses.D、Add redundant power supplies in the p5-570 CEC (Central Electronics Complex).
考题
A customer is planning to migrate a financial application to a 12-way p5-570 system with 96GB of memory. The application data is stored on an ESS Model 800 attached to a p670 server with AIX 5.2. They will have a short outage window to perform the data migration. What is the quickest way to move all the data stored on the attached ESS from the p670 to the new p5-570?()A、Use rsync to synchronize the data across servers.B、Use exportvg and importvg to move the data to the target system.C、Use NFS to copy the data from the source system to the target system.D、Backup the data from the source system and restore to the target system.
考题
A customer requires an 8-way 16GB AIX system. They are evaluating the following three systems: ? p5-570 ? p5-570 Express ? p650 The pSeries technical specialist has been asked to explain the pros and cons of the three solutions. What information will help the customer decide on the best solution for their environment?()A、The p5-570 Express can support DDR2 memory.B、The p650 and p5-570 Express provide faster processors.C、The p5-570 Express is limited to eight 1.5GHz processors.D、Neither the p5-570 nor the p5-570 Express supports Capacity on Demand.
考题
A customer is putting together a high-performance computing cluster of p655 nodes. They need a total of 48 processors and want to get the best performance possible out of those systems. They are evaluating four options and have asked the pSeries technical specialist to recommend which one would provide the best performance based on total rPerf. Their workload may grow over time. Which of the following should the pSeries technical specialist recommend?()A、Twelve 4-way p655 nodes and add more as neededB、Six 8-way p655 nodes and add more as neededC、Six 4-way p655 nodes with four processors CoD on each node in case of growthD、Three 8-way p655 nodes with eight processors CoD on each node in case of growth
考题
A customer is evaluating an IBM commercial solution against a 16-way rx8620 Integrity (Itanium). The pSeries technical specialist should lead with which of the following IBM systems?()A、IBM p5-570 8-wayB、IBM p5-570 4-wayC、IBM p5-570 2-wayD、IBM p5-570 16-way
考题
A customer needs three 2-way application servers and is evaluating the purchase of three p5-520s versus one partitioned 6-way p5-570. They like the benefits provided with dynamic processor sparing. What information should the pSeries technical specialist emphasize to the customer?()A、The p5-570 offers CoD processors.B、The p5-570 requires more rack space than the three p5-520s.C、Redundant power is standard on the p5-570 and is optional on the p5-520.D、Operating system charges will be less expensive with the p5-520 solution.
考题
A global container shipping company has a new application that they are going to deploy on a p5-570 at their corporate data center. The Chief Information Officer indicates that, if the application is down for more than 36 hours, the cost of downtime is very high. For the initial 36 hours of downtime, the company has a manual process they can execute without significant additional cost. Which of the following products best mitigates the major business risk to the company?()A、IBM Business Continuity ServicesB、HACMP and a second p5-570 for the data centerC、ServiceSuite Supportline with Account AdvocateD、ServiceSuite 9x5 next day Hardware Maintenance
考题
A customer needs a system supporting four partitions, each with the following requirements: ? 0.6 1.65GHz processors ? 2GB memory ? AIX 5.2 They also need the ability to grow the system in the future. Which pSeries system would be positioned best to meet this customer’s requirements?()A、p5-550 with the Advanced POWER Virtualization feature and AIX 5.2B、p5-550 with the POWER5 processor technology and AIX 5.2C、p5-570 with the Advanced POWER Virtualization feature and AIX 5.3D、p5-570 with the POWER5 processor technology and AIX 5.2
考题
A state agency has recently deployed a new critical application on an 8-way p570. The state government has just mandated that all agencies have disaster recovery plans to recover critical applications in acceptable periods of time with no loss of performance. Which of the following will best address this new requirement()A、HACMP/XD and a 4-way p570 in a second locationB、HACMP/XD and a 8-way p570 in a second locationC、HACMP/XD and an 8-way p570 in the same locationD、HACMP and a 4-way p570 in the same location for the critical applications only
考题
A customer has six model H70s with dual processors and needs to reduce the current complexity of managing the systems. Which of the following solutions should be recommended?()A、Six 2-way p610B、8-way p670 with six LPARsC、8-way p630 with six LPARsD、Three p615s with two LPARs each
考题
What is the minimum number of p5-570 building blocks required to support 16 RIO drawers?()A、1B、2C、3D、4
考题
A customer needs an Oracle Database Server. Based on the customer’s sizing data, the IBM Oracle Competency Center has determined that the server requirements can be met with a 4-way p5-550 or a 4-way p5-570. If the pSeries technical specialist proposes a p5-570 versus a p5-550 system, what key differences should be pointed out to the customer?()A、The p5-570 is rack mounted but the p5-550 is not.B、The p5-570 will provide more growth, but at a higher cost.C、The p5-570 is 200-240 volt only and the p5-550 is 110 volt only.D、The p5-570 needs a special feature to become a deskside machine.
考题
单选题A customer requires an 8-way 16GB AIX system. They are evaluating the following three systems: ? p5-570 ? p5-570 Express ? p650 The pSeries technical specialist has been asked to explain the pros and cons of the three solutions. What information will help the customer decide on the best solution for their environment?()A
The p5-570 Express can support DDR2 memory.B
The p650 and p5-570 Express provide faster processors.C
The p5-570 Express is limited to eight 1.5GHz processors.D
Neither the p5-570 nor the p5-570 Express supports Capacity on Demand.
考题
单选题A researcher needs to regularly analyze large quantities of data. They are interested in putting together a cluster of 16 UDB EEE partitions of four processors each for their data mining environment. Each UDB partition needs to be approximately 15 rPerf. Which of the following solutions would best fit their performance needs?()A
p655 4-way nodesB
p655 8-way nodesC
p5-570 4-way nodesD
p5-570 8-way nodes
考题
单选题A customer needs an Oracle Database Server. Based on the customer’s sizing data, the IBM Oracle Competency Center has determined that the server requirements can be met with a 4-way p5-550 or a 4-way p5-570. If the pSeries technical specialist proposes a p5-570 versus a p5-550 system, what key differences should be pointed out to the customer?()A
The p5-570 is rack mounted but the p5-550 is not.B
The p5-570 will provide more growth, but at a higher cost.C
The p5-570 is 200-240 volt only and the p5-550 is 110 volt only.D
The p5-570 needs a special feature to become a deskside machine.
考题
单选题A state agency has recently deployed a new application on an 8-way p5-570 that is critical to the agency’s operation. There is no manual method to perform the business process. The state government has just mandated that all state agencies have disaster recovery plans that allow the agencies to recover critical applications in acceptable periods of time with no loss of performance. Based on this new business requirement, what is this agency most likely to need?()A
HACMP and four processors for the p5-570B
HACMP and eight processors for the p5-570C
HACMP-XD and a 4-way p5-570 in a second locationD
HACMP-XD and a 8-way p5-570 in a second location
考题
单选题A customer is considering multiple options for a particular set of workloads on AIX v5.2. They need to run ten identical LPARS, each containing four fibre cards, two 2-port Ethernet cards, and one SCSI card as well as two internal boot disks. They want the LPARS to be split across two physical systems for redundancy purposes; cost is an issue. They need a total of approximately 40 rPerf for all ten workloads. Which of the following solutions best fits these needs?()A
2 x p655 1.7ghz 8-way servers (21.87 rPerf each)B
2 x p670 1.5ghz 8-way servers (24.18 rPerf each)C
2 x p690 1.7ghz 8-way servers (27.11 rPerf each)D
2 x p650 1.45ghz 8-way servers (18.67 rPerf each)
考题
单选题A customer plans to purchase a p5-570 that will run in SMP mode to host a large financial database on AIX 5.2. The application is sized for an 8-way 1.65-GHz machine. They do not currently have an existing HMC that supports p5 machines. This organization experiences unpredictable short-term spikes in processor utilization. To mitigate the risk to their business, they are interested in IBM’s CoD offering. In addition to the 8-way system, what else should the pSeries technical specialist recommend to the customer?()A
Another p5-570 building blockB
Capacity Backup p5-570 building blockC
Another p5-570 building block and at least one HMCD
Capacity Backup p5-570 building block and at least one HMC
考题
单选题Company.com wants to create four partitions on a pSeries p5-570 8-way with one SCSI PCI adapter connected to an external LTO tape drive. The partitions are to be created from an existing system image backup tape. Which of the following actions will enable the creation of the partitions with minimal intervention?()A
Install a VIO partition to share the tape drive.B
Purchase three external SCSI adapters and physically move the tape drive when needed.C
Create the partition definitions with the SCSI adapter as a desired resource and use DLPAR commands to move the tape drive.D
Create the partition definitions with the SCSI adapter as a required resource for all partitions and use DLPAR commands to move the tape drive.
考题
单选题What is the minimum number of p5-570 building blocks required to support 16 RIO drawers?()A
1B
2C
3D
4