网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
A customer is considering multiple options for a particular set of workloads on AIX v5.2. They need to run ten identical LPARS, each containing four fibre cards, two 2-port Ethernet cards, and one SCSI card as well as two internal boot disks. They want the LPARS to be split across two physical systems for redundancy purposes; cost is an issue. They need a total of approximately 40 rPerf for all ten workloads. Which of the following solutions best fits these needs?()
- A、2 x p655 1.7ghz 8-way servers (21.87 rPerf each)
- B、2 x p670 1.5ghz 8-way servers (24.18 rPerf each)
- C、2 x p690 1.7ghz 8-way servers (27.11 rPerf each)
- D、2 x p650 1.45ghz 8-way servers (18.67 rPerf each)
参考答案
更多 “ A customer is considering multiple options for a particular set of workloads on AIX v5.2. They need to run ten identical LPARS, each containing four fibre cards, two 2-port Ethernet cards, and one SCSI card as well as two internal boot disks. They want the LPARS to be split across two physical systems for redundancy purposes; cost is an issue. They need a total of approximately 40 rPerf for all ten workloads. Which of the following solutions best fits these needs?()A、2 x p655 1.7ghz 8-way servers (21.87 rPerf each)B、2 x p670 1.5ghz 8-way servers (24.18 rPerf each)C、2 x p690 1.7ghz 8-way servers (27.11 rPerf each)D、2 x p650 1.45ghz 8-way servers (18.67 rPerf each)” 相关考题
考题
A customer has provided the pSeries technical specialist with details of an HACMP solution that they would like validated. The solution is for two POWER4+ p630 servers directly attached to a FAStT600 storage server as the shared storage. Each system has the following: ? 2 integrated network ports ? 2 fibre channel adapter cards ? 1 power supply and redundant cooling ? HACMP v5.1 In addition to a second power supply, what further requirements, if any, are needed to validate this solution and ensure no single point of failure? ()A、One fibre channel switchB、Two fibre channel switchesC、Two Ethernet cardsD、Nothing
考题
A customer would like to buy a new Power 750 and attach 2 PCIe I/O drawers. What is the minimum configuration which will support this?()A、One processor card and one GX+ expansion cardB、Two processor cards and one GX++ expansion cardC、One processor card, one GX+ expansion card, and one GX++ expansion cardD、Two processor cards, one GX+ expansion card, and one GX++ expansion card
考题
A customer needs a new 4-way p630 with three partitions to support three AIX 5.2 applications. Each partition requires two of the following: OS boot drives, fiber adapters, and gigabit Ethernet adapters. The customer has an HMC with an available serial port. In addition to the model 6C4, which of the following is required to meet the customer’s requirements?()A、One 7311-D20 drawerB、Two 7311-D20 drawersC、Two 7311-D10 drawersD、One 7311-D10 drawers
考题
A customer with two x445 servers wants to have two NetXtreme Dual Port Gigabit Ethernet adapters installed in each server. What is the minimally supported configuration that will allow maximum throughput?()A、Install the two cards in slots 5 and 6 in the x445.B、Install the two cards in slots 3 and 5 in the x445 make sure slots 4 and 6 are not occupied.C、Install an RXE-100 on each x445 and install one card in the x445 and one card in an RXE-100 on each system.D、Connect an RXE-100 between the two x445s and install one card in each x445 and one card in each side of the RXE-100.
考题
Companycom wants to reduce the number of copper, Ethernet adapters on their 4 way p5 570 running AIX 5.3 used in each of the four LPARs. Companycom has one database LPAR, two application LPARs, and one web LPAR. Only the Web LPAR needs to communicate with the outside world. What is the minimum number of Ethernet adapters that should be provided to ensure redundancy and no single point of failure?()A、One single port Ethernet adapterB、Four dual port Ethernet adaptersC、Two single port Ethernet adaptersD、Eight single port Ethernet adapters
考题
Companycom is implementing a pair of Virtual IO Servers to service four LPARs. If each operating system image requires 15GB of disk space, what is the minimum amount of SCSI resource necessary?()A、Two SCSI paths and two 73GB SCSI disksB、Two SCSI paths and two 36GB SCSI disksC、Four SCSI paths and four 73GB SCSI disksD、Two dual port SCSI RAID adapters with two 73GB SCSI disks
考题
A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()A、Two switch ports will be needed on a switch,two Ethernet cables will be needed for theserver each connecting to two different Ethernet cards,and one IP address will be neededB、Two switch ports will be needed on two different switches two Ethernet cables will beneeded for the server each connecting to two different Ethernet cards,and one IP address will be neededC、Two switch ports will be needed on two different switches,two Ethernet cables will be needed for the server each connecting to two different Ethernet cards,two different IP addresses will be neededD、One switch port will be needed on one switch,a splitter will be needed to split the connection,two Ethernet cables will be needed for the server each connecting to two different Ethernet cards,and two different IP addresses will be needed
考题
Companycom is about to purchase a POWER5 Enterprise server which requires two Ethernet ports and two disks for each of the four LPARs. It has been configured and validated using the IBM eConfig tool. Which of the following is very important to verify in addition to the eConfig validation?()A、Total number of SCSI adaptersB、Total number of Ethernet adaptersC、Total number of Ethernet adapters and number of SCSI paths per LPARD、Total number of SCSI paths available and total number of SCSI adapters
考题
A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()A、operator trainingB、cache size of the two clustersC、fibre bandwidth capability between the sitesD、number of stacked tape drives attached to each cluster
考题
A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()A、Two dual-port PCIe adaptersB、A four-port PCIe Ethernet adapterC、Four separate PCIe Ethernet adaptersD、Two embedded Integrated Virtual Ethernet adapters (IVE)
考题
Which of the following x366 8GB memory configurations will produce the best performance?()A、One memory card with four 2GB DIMMsB、Two memory cards with four 2GB DIMMsC、Two memory cards with eight 1GB DIMMsD、Four memory cards with eight 1GB DIMMs
考题
A bank has requested proposals for a storage solution to upgrade their disaster recovery processes for their IBM System z, UNIX, and Microsoft Windows environment. The solution must simulate a multi-site environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, Global Mirror for z/OS, and FlashCopy. 120 TB physical capacity is required per site. Only Fibre Channel drives can be used. Which solution best meets the specified requirements()A、two DS8700 systems with two-way processor cards and 600 GB FC drivesB、two DS8700 systems with four-way processor cards and LPARC、two DS8700 systems with two-way processor cards and two frames per systemD、two DS8700 systems with four-way processor cards and two frames per system
考题
A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()A、Two switch ports will be needed on a switch, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.B、Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.C、Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, two different IP addresses will be needed.D、One switch port will be needed on one switch, a splitter will be needed to split the connection, two ethernet cables will be needed for the server each connecting to two different Ethernet cards, and two different IP addresses will be needed.
考题
The pSeries technical specialist is designing a two LPAR p5-570 with eight total processors. The system is a test system to run AIX 5.2. The customer has stated a preference for internal disks for the boot devices. The customer has said they may later need to run three or four LPARs without increasing the number of processors. What should the pSeries technical specialist tell the customer about the ability of the p5-570 to meet their requirements?()A、It will require additional SCSI adapters and I/O drawers or external disks to support more than two LPARs.B、It has sufficient built-in SCSI controllers and disk enclosures to support four total LPARs by only adding the necessary additional disks.C、It is unable to use internal disks for LPARs and therefore additional adapters I/O drawers or external disks must be used to support all LPARs.D、It can support six LPARs with internal disks but will require special features, cables and an adapter to support the additional LPARs with internal disks.
考题
A customer is looking for a reliable well-performing, cost-effective solution to a growing commercial workload. Initially, they want to run 12 UDB partitions, each of which would need two processors and 8GB of memory. They are looking at the p655 and want to start with three LPARS on each p655 node using a total of four nodes. Each LPAR would need at least 4 x 6239 fibre cards and 2 x 5706 2-port 10/100/1000 Ethernet cards. At a later date, they want to add an additional LPAR to each node to expand to a total of 16 UDB partitions. Which of the following major limitations of this solution should be mentioned to the customer?()A、The p655 supports only two LPARs.B、The p655 supports only four LPARs.C、There are not enough available slots for three LPARs.D、There are not enough available slots for four LPARs.
考题
A customer is adding a new p5 machine to their environment. The machine will host several DB2 partitions running AIX 5.2. They currently have two SAN directors and an IBM ESS. The SAN design allows for concurrent maintenance. What is required on each partition to attach to the SAN?()A、A minimum of two HBAs; the customer will need to download SDDB、A minimum of four HBAs; the customer will need to download SDDC、A minimum of two HBAs; the customer will need to configure MPIOD、A minimum of four HBAs; the customer will need to configure MPIO
考题
Company.com is having trouble installing a fresh AIX image onto a newly defined partition on a p5-520. The assignment of the adapters to the each of the partitions is as follows: Fibre Channel Card 01 - partition one - required Fibre Channel Card 02 - partition one - required SCSI adapter 01 - partition one - desired IDE adapter 01 - partition one - required Ethernet adapter 01 - partition one - required Ethernet adapter 01 - partition two - required SCSI adapter 02 - partition two - required IDE adapter 01 - partition two - desired Which of the following actions will enable the installation of the AIX image?()A、Change the IDE adapter from desired to required in partition two and restart the partition to release the resource.B、Purchase a SCSI DVD-ROM drive to connect to the SCSI adapter in partition two.C、Purchase an LTO tape drive so that a system image backup can be created to install a new AIX partition.D、Change the IDE adapter from required to desired in partition one and restart the partition to release the resource.
考题
A customer is purchasing a 12-way p5-570 to run light development workloads on eight AIX 5.3 partitions with two network adapters each. When the current network configuration was reviewed, it was discovered that they only have four Ethernet ports available on their network switch. Which of the following solutions would prevent them from having to buy another network switch or hub?()A、Add two HMCs with two Ethernet adapters each and run EtherChannel for the original eight partitions.B、Add two HMCs with two Ethernet adapters each and run Virtual Ethernet for the original eight partitions.C、Add two hosting partitions with two Ethernet adapters each and run EtherChannel for the original eight partitions.D、Add two hosting partitions with two Ethernet adapters each and run Virtual Ethernet for the original eight partitions.
考题
单选题A customer is adding a new p5 machine to their environment. The machine will host several DB2 partitions running AIX 5.2. They currently have two SAN directors and an IBM ESS. The SAN design allows for concurrent maintenance. What is required on each partition to attach to the SAN?()A
A minimum of two HBAs; the customer will need to download SDDB
A minimum of four HBAs; the customer will need to download SDDC
A minimum of two HBAs; the customer will need to configure MPIOD
A minimum of four HBAs; the customer will need to configure MPIO
考题
单选题A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()A
Two switch ports will be needed on a switch,two Ethernet cables will be needed for theserver each connecting to two different Ethernet cards,and one IP address will be neededB
Two switch ports will be needed on two different switches two Ethernet cables will beneeded for the server each connecting to two different Ethernet cards,and one IP address will be neededC
Two switch ports will be needed on two different switches,two Ethernet cables will be needed for the server each connecting to two different Ethernet cards,two different IP addresses will be neededD
One switch port will be needed on one switch,a splitter will be needed to split the connection,two Ethernet cables will be needed for the server each connecting to two different Ethernet cards,and two different IP addresses will be needed
考题
单选题A customer is looking for a reliable well-performing, cost-effective solution to a growing commercial workload. Initially, they want to run 12 UDB partitions, each of which would need two processors and 8GB of memory. They are looking at the p655 and want to start with three LPARS on each p655 node using a total of four nodes. Each LPAR would need at least 4 x 6239 fibre cards and 2 x 5706 2-port 10/100/1000 Ethernet cards. At a later date, they want to add an additional LPAR to each node to expand to a total of 16 UDB partitions. Which of the following major limitations of this solution should be mentioned to the customer?()A
The p655 supports only two LPARs.B
The p655 supports only four LPARs.C
There are not enough available slots for three LPARs.D
There are not enough available slots for four LPARs.
考题
单选题A customer is considering multiple options for a particular set of workloads on AIX v5.2. They need to run ten identical LPARS, each containing four fibre cards, two 2-port Ethernet cards, and one SCSI card as well as two internal boot disks. They want the LPARS to be split across two physical systems for redundancy purposes; cost is an issue. They need a total of approximately 40 rPerf for all ten workloads. Which of the following solutions best fits these needs?()A
2 x p655 1.7ghz 8-way servers (21.87 rPerf each)B
2 x p670 1.5ghz 8-way servers (24.18 rPerf each)C
2 x p690 1.7ghz 8-way servers (27.11 rPerf each)D
2 x p650 1.45ghz 8-way servers (18.67 rPerf each)
考题
单选题Companycom wants to reduce the number of copper, Ethernet adapters on their 4 way p5 570 running AIX 5.3 used in each of the four LPARs. Companycom has one database LPAR, two application LPARs, and one web LPAR. Only the Web LPAR needs to communicate with the outside world. What is the minimum number of Ethernet adapters that should be provided to ensure redundancy and no single point of failure?()A
One single port Ethernet adapterB
Four dual port Ethernet adaptersC
Two single port Ethernet adaptersD
Eight single port Ethernet adapters
考题
单选题A project requires a new server to be set up with the ability to automatically fail over its Ethernet connection to a second connection if a network failure occurs. Which of the following provides greatest resiliency?()A
Two switch ports will be needed on a switch, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.B
Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and one IP address will be needed.C
Two switch ports will be needed on two different switches, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, two different IP addresses will be needed.D
One switch port will be needed on one switch, a splitter will be needed to split the connection, two Ethernet cables will be needed for the server each connecting to two different Ethernet cards, and two different IP addresses will be needed.
考题
单选题A bank has requested proposals for a storage solution to upgrade their disaster recovery processes for their IBM System z, UNIX, and Microsoft Windows environment. The solution must simulate a multi-site environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, Global Mirror for z/OS, and FlashCopy. 120 TB physical capacity is required per site. Only Fibre Channel drives can be used. Which solution best meets the specified requirements()A
two DS8700 systems with two-way processor cards and 600 GB FC drivesB
two DS8700 systems with four-way processor cards and LPARC
two DS8700 systems with two-way processor cards and two frames per systemD
two DS8700 systems with four-way processor cards and two frames per system
考题
单选题The pSeries technical specialist is designing a two LPAR p5-570 with eight total processors. The system is a test system to run AIX 5.2. The customer has stated a preference for internal disks for the boot devices. The customer has said they may later need to run three or four LPARs without increasing the number of processors. What should the pSeries technical specialist tell the customer about the ability of the p5-570 to meet their requirements?()A
It will require additional SCSI adapters and I/O drawers or external disks to support more than two LPARs.B
It has sufficient built-in SCSI controllers and disk enclosures to support four total LPARs by only adding the necessary additional disks.C
It is unable to use internal disks for LPARs and therefore additional adapters I/O drawers or external disks must be used to support all LPARs.D
It can support six LPARs with internal disks but will require special features, cables and an adapter to support the additional LPARs with internal disks.
考题
单选题Each of seven identical cards is numbered on one of its sides with a different integer from 1 to 7. The cards are turned over and then shuffled so that they are not in a predictable order. If two cards are selected at random without replacement, what is the probability that their sum is at least l1?A
4/9B
4/21C
49/81D
7/10E
4/7
热门标签
最新试卷