A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to increase the throughput available to the ESX servers. What configuration setting does the storage specialist need to highlight?()
- A、increase the buffer credits on the HBAs
- B、increase the number of device logins on the ESX servers
- C、additional paths will be required between the servers and storage
- D、multipath option on the ESX servers should be changed to round-robin
参考答案
更多 “ A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to increase the throughput available to the ESX servers. What configuration setting does the storage specialist need to highlight?()A、increase the buffer credits on the HBAsB、increase the number of device logins on the ESX serversC、additional paths will be required between the servers and storageD、multipath option on the ESX servers should be changed to round-robin” 相关考题
考题
A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to increase the throughput available to the ESX servers.What configuration setting does the storage specialist need to highlight?()A. increase the buffer credits on the HBAsB. increase the number of device logins on the ESX serversC. additional paths will be required between the servers and storageD. multipath option on the ESX servers should be changed to round-robin
考题
A customer has a very large number of physical Windows-based servers and no centralized storage. Which technology solution will help the customer to reduce the footprint of their existing server estate?()A. z/OS, DS8000, TSMB. TSM, LTO-5, VMwareC. System x, VMware, XIVD. System p, VMware, DS5000
考题
Your customer wants to build a network for a financial trading floor that has a requirement formultiple high-value transactions, which are also vital to the customer. What are the two mostcritical requirements?() (Choose two.)A、no single point of failureB、trading database server locationC、redundant application servers locationD、deterministic response to all failuresE、determine which protocol to use
考题
A customer has provided the pSeries technical specialist with details of an HACMP solution that they would like validated. The solution is for two POWER4+ p630 servers directly attached to a FAStT600 storage server as the shared storage. Each system has the following: ? 2 integrated network ports ? 2 fibre channel adapter cards ? 1 power supply and redundant cooling ? HACMP v5.1 In addition to a second power supply, what further requirements, if any, are needed to validate this solution and ensure no single point of failure? ()A、One fibre channel switchB、Two fibre channel switchesC、Two Ethernet cardsD、Nothing
考题
A customer wants to hold all enterprise data on their DS4000 system. Several servers were added after they purchased another company. The servers that have to be run are: (1)An Oracle database running on a HP-UX server (2)Several virtual machines running on VMWare ESX server (3)A Microsoft cluster running Exchange 2000 server Which of these new servers can be integrated with the DS4000?()A、DS4000 storage does not support HP-UX, so the HP-UX server cannot be integrated.All other new servers can be used.B、An Exchange cluster needs local disks, so the DS4000 cannot be used for this.All other new servers can be used.C、When equipped with proper HBA’s and subsystem device drivers, all new servers can operate with the DS4000 storage device.D、VMWare ESX can use the DS4000 storage; however, the virtual machines running in it will not have access to this storage other than via a virtual disk.All other new servers can be used.
考题
A customer has recently purchased some IBM x445 servers running Red Hat Enterprise AS 3 and wants to connect them to their existing EMC Clarion SAN controller. Which of the following steps must be taken in order to validate the solution?()A、Download the latest drivers from EMC for Red Hat Advanced Server.B、Ensure that the EMC storage server is configured properly and has the latest firmware levels.C、Verify the equipment is on the ServerProven list and complete a Solution Assurance Review (SAR).D、Ensure that the systems are connected to the EMC SAN controller.
考题
A customer is considering replacement of twenty older 4U and 6U rack-based servers with one IBM x366 Server running VMWare ESX attached to one DS4300. Which of the following represents a reduction in Total Cost of Ownership (TCO) for the customer?()A、Reduction in operating system software licensing and application costsB、Reduction in floor space and hardware cost savingC、VMWare is licensed per system so no extra charge for SMP supportD、No single point of failure, reducing downtime
考题
A small organization is purchasing a POWER5 to consolidate four applications. Currently, each application has two Host Bus Adapters (HBA) connected to an Enterprise Storage Server (ESS). The customer is concerned about the cost of purchasing eight new HBAs. Which feature of virtualization will be most beneficial to this organization?()A、Virtual EthernetB、Micro-PartitioningC、Virtual I/O ServerD、Capped and uncapped partitions
考题
A customer has an existing DS5300 system attached to two Brocade switches with eight Windowsservers. The customer wants to add their System i p750 server to this SAN. From the followingchoices what is the simplest and least expensive solution for this customer?()A、add twofibre HBAs to the System i and connect to the SANB、add twofibre HBAs to the System i and connect to the Windows ServersC、add twofibre HBAs to the System i and connect to the System i using VIOSD、add two SAS HBAs to the Systemi array and connect directly to the DS5300
考题
A customer server has the maximum local storage installed. The customer plans to share this new storage with other servers. Which of the following provides that server additional storage?()A、Add External Storage via EXP3000B、Replace current storage with more dense drivesC、Add External Storage via SAND、Add storage expansion blade
考题
A customer currently buys HP ProLiant servers and EMC storage. The customer has encountered various problems getting certain servers to work with their storage. Which of the following arguments can the Sales Specialist present to best position IBM? ()A、IBM’s ServerProven program is a reference that assures a customer of compatibility with specific third-party products.B、IBM sells other vendors’ products and will test compatibility with the customer’s products. C、B IBM’s storage division regularly tests their products with other vendors’ server products. D、IBM’s server division regularly tests their products with other vendors’ storage products.
考题
An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()A、The EMC storage specialist has not participated in the TDA meetingB、The FC HBAs are 4 Gbps technologyC、The Technical and Delivery Assessment review actions were not executedD、The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix
考题
A customer has a mixed Dell and IBM server environment. They want to implement a system management solution for all their Windows, Linux, and VMWare ESX Intel based servers. Which TWO features of IBM Director will be an advantage for this customer?()A、IBM Director comes with free Aurema and SteelEye software plug-ins.B、IBM Director supports non-IBM industry standard Intel based servers.C、IBM Director servers can be managed from within the MS Performance Monitor.D、IBM Director requires no agents to be installed and run on the IBM systems.E、IBM Director offers agents to manage VMWare ESX Server and runs on Linux while Dell does not.
考题
A customer has a very large number of physical Windows-based servers and no centralized storage. Which technology solution will help the customer to reduce the footprint of their existing server estate?()A、z/OS, DS8000, TSMB、TSM, LTO-5, VMwareC、System x, VMware, XIVD、System p, VMware, DS5000
考题
A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure. Which solution addresses the customer requirements?()A、Move the storage into a common SAN and virtualize the I/O using a single VIO Server with dual NIC connectors and dual HBAsB、Move the existing physical network and storage adapters to the new system and virtualize the I/O using a single VIO Server.C、Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, each with dual NIC connectors and dual HBAs.D、Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, one with dual NIC connectors and the other with dual HBAs.
考题
ompany.com has a Micro-Partitioned p5-570 4-way with six application partitions and two VIO servers. Each VIO server has been allocated 0.5 CPU and the application servers have been allocated 0.4 CPUs. The marketing department wants to deploy a new Web server to support the release of a product. The systems architect has recommended that the Web server will require a whole CPU. Which of the following should the technical specialist suggest to provide the most cost-effective deployment?()A、Remove one application server partition and apply its CPU resources to the Web server.B、Reassign the CPU from one of the VIO servers and create the new partition.C、Add 0.6 CPU to one of the application servers and run the Web service with the application. D、Reassign a total of 0.4 CPUs from the application servers and create a new partition with awhole CPU for new deployment.
考题
A customer has four 2-way 2U front-end web servers that are currently running at 15% CPU utilization. These servers provide points of access for users worldwide, and volume is expected to triple in the next six months and aggressively grow thereafter. They want to upgrade these systems to newer technology and stay within the 8U of rack space that they are replacing. Which solution would fit the customer’s requirements?()A、Three x366 4-ways running VMWare ESX Server.B、An x445 8-way Xeon MP attached to a DS4300 and running VMWare ESX Server.C、An x445 16-way Xeon MP attached to an EXP400 and running VMWare ESX Server.D、Four x346 2-ways running VMWare ESX Server.
考题
A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()A、The customer used their IBM Customer NumberB、The customer has activated their base warrantyC、The customer purchased Remote Technical Support ServicepacD、The customer escalated the issue to the Duty Manager
考题
A company has two x346 servers each attached to their own EXP400 containing 367GB of raw SCSI storage. They want to consolidate their storage infrastructure into a scalable, high availability solution at minimum cost. Which of the following storage solutions best satisfies the customer’s requirements?()A、Add redundant Fibre HBAs to each server and direct attach them to a DS4300 Turbo SAN solutionB、Add iSCSI cards to the servers and direct attach them to a DS300 dual controller modelC、Use clustered NAS solution with redundant gigabit network connectionsD、Add redundant Fibre HBAs to each server and attach them to a DS400 dual controller model
考题
A customer currently has a large group of older 1U servers. Each dedicated to aunique application. Quick provisioning of the servers is important to the customer. Which of the following approaches addresses this situation?()A、VirtualizationB、Replace each server with energy efficient serversC、Upgrade in place to improve performanceD、Implement BladeCenter
考题
A customer needs to create a number of LPARs on a new POWER6 server with some LPARs requiring a dedicated network and other LPARs utilizing Virtual Ethernet via a VIO server. Which limitation must be considered when planning the system configuration?()A、A VIO server requires a dedicated LHEA port.B、There is a limit of 32 LPARs per virtual LAN.C、Two VIO servers will be required. A single VIO server can only provide virtual storage or virtual Ethernet.D、Two VIO servers will be required. One to provide virtual networking and another to provide dedicated networking.
考题
单选题A customer has provided the pSeries technical specialist with details of an HACMP solution that they would like validated. The solution is for two POWER4+ p630 servers directly attached to a FAStT600 storage server as the shared storage. Each system has the following: ? 2 integrated network ports ? 2 fibre channel adapter cards ? 1 power supply and redundant cooling ? HACMP v5.1 In addition to a second power supply, what further requirements, if any, are needed to validate this solution and ensure no single point of failure? ()A
One fibre channel switchB
Two fibre channel switchesC
Two Ethernet cardsD
Nothing
考题
单选题A customer wants to hold all enterprise data on their DS4000 system. Several servers were added after they purchased another company. The servers that have to be run are: (1)An Oracle database running on a HP-UX server (2)Several virtual machines running on VMWare ESX server (3)A Microsoft cluster running Exchange 2000 server Which of these new servers can be integrated with the DS4000?()A
DS4000 storage does not support HP-UX, so the HP-UX server cannot be integrated.All other new servers can be used.B
An Exchange cluster needs local disks, so the DS4000 cannot be used for this.All other new servers can be used.C
When equipped with proper HBA’s and subsystem device drivers, all new servers can operate with the DS4000 storage device.D
VMWare ESX can use the DS4000 storage; however, the virtual machines running in it will not have access to this storage other than via a virtual disk.All other new servers can be used.
考题
单选题An IBM Business Partner has sold a DS5020 and new IBM SAN switches to replace a customer EMC storage infrastructure. The customer dissatisfaction has arisen during the installation because according to the DS5020 interoperability matrix, two HP Proliant servers running Exchange have FC HBAs that are not supported. Which of the following is the most probable cause of the customer dissatisfaction()A
The EMC storage specialist has not participated in the TDA meetingB
The FC HBAs are 4 Gbps technologyC
The Technical and Delivery Assessment review actions were not executedD
The customer should have checked that the HBAs are supported according to the HP storage interoperability matrix
考题
单选题A customer is planning to upgrade two VMware ESX servers from 3.5 to 4.1 after recently installing a new XIV Storage System. Each server has 4 HBAs connected to redundant fabrics for a total of 4 paths per server to storage. The customer wants to increase the throughput available to the ESX servers. What configuration setting does the storage specialist need to highlight?()A
increase the buffer credits on the HBAsB
increase the number of device logins on the ESX serversC
additional paths will be required between the servers and storageD
multipath option on the ESX servers should be changed to round-robin
考题
单选题A customer is installing a new x3850 X5 server and has purchased a warranty upgrade on the server to 24 x 7 four hour response. The customer requested IBM help with setting up the RAID adapter. The customer was told IBM would not help them. Which of the following should be verified first?()A
The customer used their IBM Customer NumberB
The customer has activated their base warrantyC
The customer purchased Remote Technical Support ServicepacD
The customer escalated the issue to the Duty Manager
考题
单选题A customer is considering replacement of twenty older 4U and 6U rack-based servers with one IBM x366 Server running VMWare ESX attached to one DS4300. Which of the following represents a reduction in Total Cost of Ownership (TCO) for the customer?()A
Reduction in operating system software licensing and application costsB
Reduction in floor space and hardware cost savingC
VMWare is licensed per system so no extra charge for SMP supportD
No single point of failure, reducing downtime