网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
Hold No. 4 must be cleaned up to meet the ________ of the cargo surveyors
A.rules
B.necessity
C.requirement
D.statute
参考答案
更多 “ Hold No. 4 must be cleaned up to meet the ________ of the cargo surveyorsA.rulesB.necessityC.requirementD.statute ” 相关考题
考题
9. _______you _______ stay at home today?A. Do ; have toB. Must; have toC. Have; toD. Do ; must
考题
It will ( ) your expectations and we offer a full guarantee for three years.
A.satisfy withB.satisfyC.meet withD.meet
考题
Theroomisinaterriblemess;it_________cleaned.A)can’thavebeenB)mustn’thavebeenC)shouldn’thavebeenD)wouldn’thavebeen
考题
3.—__________ 1 go out for a while?—No,you __________ You must finish your homework first.A. Must,needn'tB. Can,mayC. May,mustn'tD. May,must
考题
Turning accessories on the posts to be dismantled,examined,cleaned,greased,repaired if necessary and refitted.This sentence is most possibly found in ________.A.Chief Mate's remark on stowage planB.Store list made by Chief EngineerC.Collision Report made by MasterD.Repair List
考题
4 sanitary storm valves to be dismantled,cleaned,grounded and coated with anti-corrosive paint,then refitted in order.This sentence is most possibly found in ________.A.Chief Mate's remark on stowage planB.Store list made by Chief EngineerC.Collision Report made by MasterD.Repair List
考题
In the case of new crude oil tankers,the additional ballast permitted shall be carried in cargo tanks only if such tanks have been ______ before departure from an oil unloading port or terminal.A.inertedB.crude oil washedC.dilutedD.cleaned
考题
材料:Early on 5 November 1996,the 140,086 tonnes deadweight Malaysian flag bulk carrier Giga 2 was nearing completion of discharge of a cargo of iron ore at No.2 discharge berth,Port KemblA、Due to the vessels light condition,the unloader could not be positioned over No.1 hold,to remove the 1080 tonnes of cargo remaining in that particular hold.At the suggestion of the shift supervisor,ballast was pumped into No.4 hold,which was permissible under the vessels operations manual.Pumping of ballast into No.4 hold commenced at 0530.After the lunch break,two terminal workers descended into No.5 hold,where the unloader was working,to clear iron ore from around the bottom of the forward spiral access ladder.The spiral ladder terminated at the top of the lower stool,six metres above the tank top.They had just completed this task and were about to climb the ladder when the bulkhead to the starboard side of the centre line,between No.5 hold and the ballasted No.4 hold,collapsed.Both workers were immediately engulfed by the deluge and,although one was able to haul himself clear,the other remained submerged.The shift supervisor was working in his office ashore and,alerted by calls over the radio from the Hatchman,dashed on board and immediately descended the ladder into No.5 hold.Up to his neck in the swirling water and guided by the Hatchman above,he was able to grab hold of the submerged worker.Assisted by another terminal worker,who had followed him into the hold,he was able to haul the unconscious and apparently lifeless worker clear of the water.The shift supervisor then administered cardio-pulmonary resuscitation(CPR),which was successful in restoring breathing in the worker.Very shortly afterwards an ambulance officer arrived on the scene and administered oxygen,before the worker was lifted from the hold and taken to hospital.问题:The most probable reason that the unloader could not be positioned over No.1 hold was that ________.A.the trim was too smallB.the trim was too bigC.the draft was too smallD.the draft was too bigNo.4 hold into which ballast water was pumped was a ________.A.special hold which could only be used to adjust the trim and/or draft in cargo operationB.double bottom tank usually not used as ballast tankC.ballast tankD.cargo holdIt is concluded that the depth of ballast water in No.4 Hold ________ before the bulkhead was collapsed.A.less than 1 meterB.around 1 meterC.around 2 metersD.more than 3 metersOf the following,it is ________ that prevented the submerged worker from hauling himself clear when the bulkhead collapsed.A.his weakness or,possibly,his small figureB.the big depth of the ballast waterC.the big distance from the lower stool of the spiral ladder to the tank-top in No.5 HoldD.the strong or swirling current in the ballast water请帮忙给出每个问题的正确答案和分析,谢谢!
考题
______will be paid by shipowners after tallyman doing the tally work.A.Cargo-handling expensesB.Tally moneyC.Cargo-tallying duesD.Tally fees
热门标签
最新试卷