网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
Prepare for ()(弃货) cargo.
- A、jettisoning
- B、lowering
- C、hoisting
- D、abandoning
参考答案
更多 “Prepare for ()(弃货) cargo.A、jettisoningB、loweringC、hoistingD、abandoning” 相关考题
考题
Which of these correctly identifies the six phases of the Cisco Lifecycle Services framework? ()
A. Prepare, Plan, Create, Implement, Operate, and ImproveB. Prepare, Plan, Design, Implement, Operate, and OptimizeC. Prepare, Plan, Design, Apply, Operate, and ManageD. Prepare, Plan, Design, Implement, Operate and Manage
考题
准备弃船。()A、Prepare to abandon ship.B、Prepare for abandon ship.C、Prepare abandon ship.D、Prepare for ship.
考题
It is the job of the ()Department to take care of the cargo.A、DeckB、EngineC、ServiceD、above all
考题
The ship is stranding. Prepare for jettisoning cargo.()A、船舶搁浅,准备弃货。B、船舶搁浅,准备弃船。C、船舶搁浅,准备装货。D、船在前行,准备弃货。
考题
清扫艏艉甲板,准备出海。()A、Repair fore and aft decks and prepare for sea.B、Clean up lower deck and prepare for sea.C、Clean up fore and aft decks and prepare for sea.D、Paint fore and aft decks and prepare for sea.
考题
There are six phases of the Cisco Network Lifecycle Services framework. What are they?()A、Prepare, Plan, Design, Apply, Operate, and ManageB、Prepare, Plan, Design, Implement, Operate, and OptimizeC、Prepare, Plan, Design, Implement, Operate and ManageD、Prepare, Plan, Create, Implement, Operate, and Improve
考题
单选题The ship is stranding. Prepare for jettisoning cargo.()A
船舶搁浅,准备弃货。B
船舶搁浅,准备弃船。C
船舶搁浅,准备装货。D
船在前行,准备弃货。
考题
单选题Prepare for ()(弃货) cargo.A
jettisoningB
loweringC
hoistingD
abandoning
热门标签
最新试卷