考题
A new HACMP maintenance level has recently been released. An administrator is creating a project plan that is required for applying the updates for a three-node production cluster. To minimize downtime,what is the best way to accomplish the updates on all cluster nodes?() A、 Perform a graceful takeover one node at a time and apply the updates.B、 Perform the updates on all nodes simultaneously using C-SPOC utilities.C、 Perform the updates on node at a time with the cluster software active.D、 Perform a graceful stop of all cluster nodes and apply updates to all nodes.
考题
During a cluster functionality test, and administrator performs a graceful stop for Node ’B’ in a three-node cluster. What is the expected state of the cluster after Node ’B’successfully completes?() A、 All cluster resources halt on Node ’B’,and one or both surviving nodes will gracefully acquire the resources.B、 All cluster processes halt on Node ’B’,the cluster resources remain active,and the remaining nodes take no action.C、 All cluster processes stay active on Node ’B’,cluster resources are halted,and the remaining nodes take no action.D、 All cluster resources will stop,cluster processes halt on Node ’B’,and the remaining cluster nodes take no action.
考题
An administrator is planning an upgrade of a major software package on an application server.The software has been identified, the project approved and the upgrade purchased. Which of the following steps should the administrator take NEXT?()A、Create a test environment for the new version.B、Determine system requirements for the upgrade.C、Request bids from other competing vendors in the product space.D、Document the upgrade.
考题
An administrator is planning to bring a newly purchased server online. Which of the following should the administrator do FIRST?()A、Follow the pre-installation plan and procedures.B、Review the system logs to check for errors.C、Notify all users that the old system will be taken offline.D、Apply all security updates to the system.
考题
An administrator is planning an upgrade of a major software package on an application server.The software has been tested successfully in a test environment and it is ready to go into production. Which of the following steps should the administrator take next?()A、Identify necessary operating system updatesB、Implement the changeC、Document the changeD、Schedule system down time
考题
An administrator has a 2 node cluster running PowerHA version 5.5. They remove a resource group from theactive cluster configuration. When performing a verify and synchronize of the cluster, the administrator getsthe following error: "migcheck[471]: cl_connect() error, nodename=Node1, rc=-1 cldare: A communication error prevents obtaining the VRMF from remote nodes. A DARE event cannot be run until this is corrected. Please ensureclcomd is running." What is the most likely cause of this error?()A、There is a DARE lock in placeB、A PowerHA migration is in progressC、Cluster services is not active on the other nodeD、The other cluster node is running a different version of RSCT
考题
An administrator has made several topology and resource group changes on one node in a running cluster.During verification and synchronization, using the "Emulate" option, many errors are reported. Theadministrator decided the best course of action was to roll back the changes. Prior to the changes beingmade, a cluster snapshot was taken. Which of the following actions will roll back the changes with the least disruption?()A、Perform a synchronization from a node without the changes.B、Apply the cluster snapshot on both nodes while the cluster is running.C、"Restore HACMP Configuration Database from Active Configuration" on the node where the changes weremadeD、Stop the cluster using the option "Unmanage Resource Groups" and apply the cluster snapshot on thenode where the changes were made
考题
An administrator is planning for a six node cluster but is concerned about the administration needed tomanage user accounts throughout the cluster. What PowerHA feature could the administrator use to reducethe administration overhead?()A、LDAP Authentication ModuleB、Smart Assist for Active DirectoryC、C-SPOC for user and password managementD、File Collections designating one node as the primary authentication node
考题
An administrator has a two node cluster, Node1 and Node2, running resource group rg1. The resource groupis active on Node1. The administrator stopped cluster services and unmanaged the resource group on Node1to work on a problem. Now the administrator needs to move rg1 to Node2. Which of the following will achievethis?()A、Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Manually’ and select the destination ofNode2B、Perform a resource group move operation from Node1 to Node2 and select the option to ’Re-manageResource Groups’ set to ’Automatically’C、Perform a clstop on Node1 with option to move resource groups, this will release the resource group fromNode1 and accquire the resource group on Node2.D、Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Automatically’, then perform a resourcegroup move operation to move rg1 from Node1 to Node2
考题
An administrator has a two-node PowerHA cluster in a mutual takeover configuration. He needs to updatefrom 5.5 service pack 1 to 5.5 service pack 2. Which of the following actions will perform the updates with norisk of disruption to applications running in the cluster?()A、Unmanage resource groups on all nodes, update the cluster filesets, start cluster services on all nodes,ensure cluster services stabilizeB、Update the cluster filesets on all nodes. Run ’refresh -s clstrmgrES’ on one node, wait for the cluster tostabilize, repeat for all other nodesC、Unmanage resource groups on one node, update the cluster filesets, start cluster services. Wait for thecluster to stabilize and repeat for all other nodes.D、Bring resource groups (RGs) online on all nodes concurrently, bring RGs offline on one node, update thecluster filesets, bring RGs online, repeat for all other nodes
考题
During an internal IT organization planning session, it is decided that a new cluster node would Enhance the performance of a distributed corporate application. Planning details have been assigned to the administrator. System outages are limited to one weekend per month; therefore, availability will be a key issue in the planning process. How much cluster downtime will need to be allocated for adding a new node?() A、 None,everything can be done with the cluster active.B、 Minimal downtime will be required to import the volume groups.C、 Several hours are required for testing before final synchronization.D、 Minimal downtime will be required to connect and test the serial network.
考题
You are an administrator of an active/passive cluster of MAG Series devices running in mixed- mode configuration (IF-MAP server and authenticating users). The active user count is quickly approaching the maximum limit of the cluster. You have been directed to reconfigure the cluster to an active/active cluster and add a new license to increase the total number of active users the cluster can support. What must you do before changing the cluster configuration?()A、Apply the new license to the passive node of the cluster.B、Configure an external load balancer to hold the V IP.C、Disable the active node in the cluster.D、Remove the IF-MAP server configuration.
考题
Two MAG4610s are running in an active/passive cluster configuration. The system administrator is planning to apply a service package to the cluster.Which process should the administrator follow?()A、Perform the upgrade on the active node of the cluster. When completed, the node reboots and then pushes the service package to the passive node automatically.B、Perform the upgrade on the passive node of the cluster. When completed, the node reboots and then pushes the service package to the active node automatically.C、On the clustering status page, disable the active node. Perform the upgrade on the disabled node. When completed and the node reboots, enable the node on the clustering status page.Repeat the process on the passive node.D、On the clustering status page, disable the passive node. Perform the upgrade on the disabled node. When completed and the node reboots, enable the node on the clustering status page.Repeat the process on the active node.
考题
You work in a company which uses SQL Server 2008. You are the administrator of the company database. Now you are in charge of a SQL Server 2008 cluster. According to the company requirement, the failover response of the cluster has to be tested. The company assigns this task to you. On the cluster, you have to implement a manual failover. What should you do? () A、The contents of a shared folder on the active node should be encrypted by using Encrypting File System (EFS) B、You should restore a backup to the active node C、You should get rid of the shared array from the active node D、From the active node, you have to uplug the network cable(s)
考题
单选题An administrator has made several topology and resource group changes on one node in a running cluster.During verification and synchronization, using the "Emulate" option, many errors are reported. Theadministrator decided the best course of action was to roll back the changes. Prior to the changes beingmade, a cluster snapshot was taken. Which of the following actions will roll back the changes with the least disruption?()A
Perform a synchronization from a node without the changes.B
Apply the cluster snapshot on both nodes while the cluster is running.C
Restore HACMP Configuration Database from Active Configuration on the node where the changes weremadeD
Stop the cluster using the option Unmanage Resource Groups and apply the cluster snapshot on thenode where the changes were made
考题
单选题During a cluster functionality test, and administrator performs a graceful stop for Node ’B’ in a three-node cluster. What is the expected state of the cluster after Node ’B’successfully completes?()A
All cluster resources halt on Node ’B’,and one or both surviving nodes will gracefully acquire the resources.B
All cluster processes halt on Node ’B’,the cluster resources remain active,and the remaining nodes take no action.C
All cluster processes stay active on Node ’B’,cluster resources are halted,and the remaining nodes take no action.D
All cluster resources will stop,cluster processes halt on Node ’B’,and the remaining cluster nodes take no action.
考题
单选题An administrator is planning for a six node cluster but is concerned about the administration needed tomanage user accounts throughout the cluster. What PowerHA feature could the administrator use to reducethe administration overhead?()A
LDAP Authentication ModuleB
Smart Assist for Active DirectoryC
C-SPOC for user and password managementD
File Collections designating one node as the primary authentication node
考题
单选题A new HACMP maintenance level has recently been released. An administrator is creating a project plan that is required for applying the updates for a three-node production cluster. To minimize downtime,what is the best way to accomplish the updates on all cluster nodes?()A
Perform a graceful takeover one node at a time and apply the updates.B
Perform the updates on all nodes simultaneously using C-SPOC utilities.C
Perform the updates on node at a time with the cluster software active.D
Perform a graceful stop of all cluster nodes and apply updates to all nodes.
考题
单选题An administrator is planning an upgrade of a major software package on an application server.The software has been tested successfully in a test environment and it is ready to go into production. Which of the following steps should the administrator take next?()A
Identify necessary operating system updatesB
Implement the changeC
Document the changeD
Schedule system down time
考题
单选题An administrator is planning an upgrade of a major software package on an application server. The software has been tested successfully in a test environment and it is ready to go into production. Which of the following steps should the administrator take next?()A
Identify necessary operating system updatesB
Implement the changeC
Document the changeD
Schedule system down time
考题
单选题During an internal IT organization planning session, it is decided that a new cluster node would Enhance the performance of a distributed corporate application. Planning details have been assigned to the administrator. System outages are limited to one weekend per month; therefore, availability will be a key issue in the planning process. How much cluster downtime will need to be allocated for adding a new node?()A
None,everything can be done with the cluster active.B
Minimal downtime will be required to import the volume groups.C
Several hours are required for testing before final synchronization.D
Minimal downtime will be required to connect and test the serial network.
考题
单选题An administrator has a two node cluster, Node1 and Node2, running resource group rg1. The resource groupis active on Node1. The administrator stopped cluster services and unmanaged the resource group on Node1to work on a problem. Now the administrator needs to move rg1 to Node2. Which of the following will achievethis?()A
Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Manually’ and select the destination ofNode2B
Perform a resource group move operation from Node1 to Node2 and select the option to ’Re-manageResource Groups’ set to ’Automatically’C
Perform a clstop on Node1 with option to move resource groups, this will release the resource group fromNode1 and accquire the resource group on Node2.D
Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Automatically’, then perform a resourcegroup move operation to move rg1 from Node1 to Node2
考题
单选题Two MAG4610s are running in an active/passive cluster configuration. The system administrator is planning to apply a service package to the cluster.Which process should the administrator follow?()A
Perform the upgrade on the active node of the cluster. When completed, the node reboots and then pushes the service package to the passive node automatically.B
Perform the upgrade on the passive node of the cluster. When completed, the node reboots and then pushes the service package to the active node automatically.C
On the clustering status page, disable the active node. Perform the upgrade on the disabled node. When completed and the node reboots, enable the node on the clustering status page.Repeat the process on the passive node.D
On the clustering status page, disable the passive node. Perform the upgrade on the disabled node. When completed and the node reboots, enable the node on the clustering status page.Repeat the process on the active node.
考题
多选题You work in a company which uses SQL Server 2008. You are the administrator of the company database. Now you are in charge of a SQL Server 2008 cluster. According to the company requirement, the failover response of the cluster has to be tested. The company assigns this task to you. On the cluster, you have to implement a manual failover. What should you do? ()AThe contents of a shared folder on the active node should be encrypted by using Encrypting File System (EFS)BYou should restore a backup to the active nodeCYou should get rid of the shared array from the active nodeDFrom the active node, you have to uplug the network cable(s)
考题
单选题An administrator is planning an upgrade of a major software package on an application server.The software has been identified, the project approved and the upgrade purchased. Which of the following steps should the administrator take NEXT?()A
Create a test environment for the new version.B
Determine system requirements for the upgrade.C
Request bids from other competing vendors in the product space.D
Document the upgrade.
考题
单选题An administrator has a two-node PowerHA cluster in a mutual takeover configuration. He needs to updatefrom 5.5 service pack 1 to 5.5 service pack 2. Which of the following actions will perform the updates with norisk of disruption to applications running in the cluster?()A
Unmanage resource groups on all nodes, update the cluster filesets, start cluster services on all nodes,ensure cluster services stabilizeB
Update the cluster filesets on all nodes. Run ’refresh -s clstrmgrES’ on one node, wait for the cluster tostabilize, repeat for all other nodesC
Unmanage resource groups on one node, update the cluster filesets, start cluster services. Wait for thecluster to stabilize and repeat for all other nodes.D
Bring resource groups (RGs) online on all nodes concurrently, bring RGs offline on one node, update thecluster filesets, bring RGs online, repeat for all other nodes
考题
单选题An administrator has a 2 node cluster running PowerHA version 5.5. They remove a resource group from theactive cluster configuration. When performing a verify and synchronize of the cluster, the administrator getsthe following error: "migcheck[471]: cl_connect() error, nodename=Node1, rc=-1 cldare: A communication error prevents obtaining the VRMF from remote nodes. A DARE event cannot be run until this is corrected. Please ensureclcomd is running." What is the most likely cause of this error?()A
There is a DARE lock in placeB
A PowerHA migration is in progressC
Cluster services is not active on the other nodeD
The other cluster node is running a different version of RSCT
考题
单选题You are an administrator of an active/passive cluster of MAG Series devices running in mixed- mode configuration (IF-MAP server and authenticating users). The active user count is quickly approaching the maximum limit of the cluster. You have been directed to reconfigure the cluster to an active/active cluster and add a new license to increase the total number of active users the cluster can support. What must you do before changing the cluster configuration?()A
Apply the new license to the passive node of the cluster.B
Configure an external load balancer to hold the V IP.C
Disable the active node in the cluster.D
Remove the IF-MAP server configuration.