网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
When towing astern what equipment should be stowed ready for use near the towline?()
A
First aid kit
B
Axe or cutting torch
C
Fire extinguisher
D
Chafing gear
参考答案
参考解析
解析:
暂无解析
更多 “单选题When towing astern what equipment should be stowed ready for use near the towline?()A First aid kitB Axe or cutting torchC Fire extinguisherD Chafing gear” 相关考题
考题
A mobile offshore drilling unit under tow is approaching a fog bank. When should fog signals be started?A.When the towing vessel enters the fogB.When the drilling rig enters the fogC.When the towing vessel can no longer be seen from the rigD.Immediately
考题
Which statement concerning the carriage of containers is TRUE? ______.A.The Chief Mate and Master of a container ship should have the proposed stowage plan ready for the stevedore upon arrival in portB.When stowed on deck of a break bulk ship,the bottom of the container must be evenly supported throughoutC.With tiered containers,a 40-foot container may be stowed on top of two 20-foot containersD.Deck load calculations must take into account the square footage of the entire container bottom
考题
A tug is best positioned for towing and maneuvering on rivers and other restricted waters where wave action is limited when ______.A.directly astern and pushing the towB.towing on a hawserC.towing alongside and parallel to the vessel it is towingD.towing on the hip
考题
A vessel towing a barge astern would show,at the stern ______.A.only a stern lightB.a towing light above the stern lightC.two towing lights in a vertical lineD.two white lights in a vertical line
考题
A vessel towing astern in an operation which severely restricts the towing vessel and her tow in their ability to change course shall,when making way,exhibit ______.A.the masthead lights for a towing vesselB.the lights for a vessel restricted in its ability to maneuverC.sidelights,stern light and towing lightD.All of the above
考题
A chain bridle is used when towing astern because it ______.A.is easy to connectB.provides an effective catenary and absorbs shock due to its weightC.makes rigging a swivel unnecessaryD.prevents the tow from yawing by the drag of the chains in a seaway
考题
What is one thing you should be aware of when conducting a wireless site survey?()A、 5 GHz equipment will not be able to penetrate through walls as well as 2.4 GHZ equipment.B、 2.4 GHz equipment will not be able to penetrate through walls as well as 5 GHz equipment.C、 Mounting antennas near metal objects will slightly amplify the signal.D、 When determining coverage, you should begin measuring attenuation from the middle of the room.
考题
单选题A tug is best positioned for towing and maneuvering on rivers and other restricted waters where wave action is limited when().A
directly astern and pushing the towB
towing on a hawserC
towing alongside and parallel to the vessel it is towingD
towing on the hip
考题
单选题When towing astern,increased catenary will().A
increase control of the towB
prevent the towing vessel from going in ironsC
make the towing vessel less maneuverableD
reduce shock stress on the towing hawser
考题
单选题The cargo,when(),should be completely covered with plastic.A
stowB
stowingC
stowedD
be stowed
考题
单选题You see a vessel carrying a black diamond which indicates a().A
vessel towing asternB
barge pushed aheadC
vessel towing astern only when the length of her tow exceeds 200 metersD
this signal does not exist in international waters
考题
单选题A vessel towing astern in an operation which severely restricts the towing vessel and her tow in their ability to change course shall,when making way,exhibit().A
the masthead lights for a towing vesselB
the lights for a vessel restricted in its ability to maneuverC
sidelights,stern light and towing lightD
All of the above
考题
单选题A vessel towing a barge astern would show,at the stern().A
only a stern lightB
a towing light above the stern lightC
two towing lights in a vertical lineD
two white lights in a vertical line
考题
单选题In astern towing,a tow span,also called the tow bar or towing arch,is used to().A
insure that the hawser leads directly aft as it passes over the stern of the towing vesselB
increase the stability of the towing vessel by raising the hawser off the deckC
reduce chafing of the towing hawserD
prevent fouling of the hawser on deck gear located on the stern of the towing vessel
考题
单选题A chain bridle is used when towing astern because it().A
is easy to connectB
provides an effective catenary and absorbs shock due to its weightC
makes rigging a swivel unnecessaryD
prevents the tow from yawing by the drag of the chains in a seaway
考题
单选题A towing vessel becomes tripped while towing on a hawser astern. What factor is MOST important when assessing the risk of capsizing? ()A
Length of the towlineB
Height of the towline connectionC
Longitudinal position of the towline connectionD
Direction of opposing force
考题
单选题When towing astern,one way to reduce yawing of the tow is to().A
trim the tow by the sternB
trim the tow by the headC
have the tow on an even keelD
list the tow on the side it is yawing
考题
单选题For safety reasons,when assistance towing().A
the disabled vessel should be towed to the nearest portB
the disabled vessel should be inspected for flammable gasesC
passengers should always be removed from the disabled vesselD
personnel on the disabled vessel should don PFD's
考题
单选题A vessel towing astern in an operation which severely restricts the towing vessel and her tow in their ability to change course shall,when making way,exhibit().A
the masthead lights for a towing vesselB
the lights for a vessel restricted in its ability to maneuverC
sidelights,sternlight and towing lightD
All of the above
考题
单选题When towing astern what equipment should be stowed ready for use near the towline?()A
First aid kitB
Axe or cutting torchC
Fire extinguisherD
Chafing gear
考题
单选题A power-driven vessel shall have her engine ready for()when the visibility is restricted.A
immediate stoppingB
immediate maneuveringC
immediate anchoringD
immediate going astern
考题
单选题A power-driven vessel,when towing astern,shall show().A
two towing lights in a vertical lineB
a towing light in a vertical line above the sternlightC
two towing lights in addition to the sternlightD
a small white light in lieu of the sternlight
考题
单选题Which emergency equipment should you keep near the towing bitts().A
A self-contained breathing apparatusB
A boat hook and a spanner wrenchC
A fire ax and/or cutting torchD
A Stokes litter basket
考题
单选题What is one thing you should be aware of when conducting a wireless site survey?()A
5 GHz equipment will not be able to penetrate through walls as well as 2.4 GHZ equipment.B
2.4 GHz equipment will not be able to penetrate through walls as well as 5 GHz equipment.C
Mounting antennas near metal objects will slightly amplify the signal.D
When determining coverage, you should begin measuring attenuation from the middle of the room.
考题
单选题Small quantities of flammable liquids needed at a work site should be().A
used only under the supervision and direction of a ship's officerB
tightly capped and stowed with other tools near the job site when securing at the end of the dayC
used only when a pressurized fire hose is laid out ready for immediate useD
in a metal container with a tight cap
考题
单选题Certain dangerous goods are required “to be stowed in a mechanically ventilated space”. When such goods are carried in a closed Ro/Ro cargo space or a special category space,this space should().A
be mechanically operatedB
be temperature controlledC
be mechanically ventilatedD
not allow to run its refrigeration or heating equipment
考题
单选题To reduce stress on the towing hawser when towing astern (ocean tow),the hawser should be ().A
secured to the aftermost fitting on the towing vesselB
just touching the waterC
underwaterD
as short as possible
考题
单选题As seen from the tow,what should connect the leading ends of both towing bridle legs to the main towing hawser?()A
A cable clampB
A fishplate,flounder,or towing plateC
A pad eyeD
The towing bitts
热门标签
最新试卷