网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

      A ________official is one who is irresponsible in his work.

      A) timid                                                       C)suspicious

      B) tedious                                                    D)slack


参考答案

更多 “ A________officialisonewhoisirresponsibleinhiswork.A)timidC)suspiciousB)tediousD)slack ” 相关考题
考题 The critical path is calculated byA.subtracting the end date of task one from the start date of task two.B.determining which tasks have the least amount of total slack.C.totaling the time for all activities.D.determining the shortest path through the network.E.Determining which tasks have the most slack

考题 As a project is carried out and slack time is consumed on individual tasks, the slack left over for the remaining tasks is:A.Insignificant.B.Reduced.C.Unchanged.D.Increased.E.Doubled.

考题 Once the logic of a network is laid out, the project manager will conduct a forward pass and backward pass through the network. This will provide information on the _____ and identification of the _____ .A.Slack for each activity, critical path.B.Slack for each activity, high risk activities.C.Manpower shortages, high risk activities.D.High risk activities, non-critical paths.E.Manpower availability, contingency plans.

考题 The basic terminology for networks includes:A.Activities, events, manpower, skill levels and slack.B.Activities, documentation, events, manpower and skill levels.C.Slack, activities, events, and time estimates.D.Time estimates, slack, sponsorship involvement, and activities.E.Time estimates, slack time, report writing, life cycle phases, and crashing times.

考题 67 As a project is carried out and slack time is consumed on individual tasks, the slack left over for the remaining tasks is:A. Insignificant.B. Reduced.C. Unchanged.D. Increased.E. Doubled

考题 ● The critical path is calculated byA subtracting the end date of task one from the start date of task two.B determining which tasks have the least amount of total slack.C totaling the time for all activities.D determining the shortest path through the network.E Determining which tasks have the most slack

考题 ● As a project is carried out and slack time is consumed on individual tasks, the slack left over for the remaining tasks is:A Insignificant.B Reduced.C Unchanged.D Increased.E Doubled.

考题 Aunt Jane was ________ of everyone who came to her front door. A.suspiciousB.unworthyC.capableD.convinced

考题 下列哪项关于活动最晚开始时间的计算是正确的()。 A、EF–Dur(持续时间)B、ES-DurC、LF-DurD、ES–Slack(松弛时间)E、LF-Slack

考题 In anchoring orders,Up and down means ________ .A.the chain is not uprightB.the chain is tightC.the chain is uprightD.the chain is slack

考题 You will find information about the duration of slack water in the ______.A.Tidal Current TablesB.Tide TablesC.American Practical NavigatorD.Sailing Directions

考题 When displacement increases,the free surface corrections for slack tanks ______.A.increaseB.decreaseC.are directly proportionalD.remain unchanged

考题 Although reading is generally considered a"receptive"language process,this does not mean that the process is essentially passive.A:inactive B:expensive C:tedious D:intensive

考题 The school trip has become an annual event.A:yearly B:average C:tedious D:abnormal

考题 Slack more.()A、多松点儿。B、少松点儿。C、多紧点儿。D、少紧点儿。

考题 This mooring line is a little slack. Please ()it.A、fastB、fastenC、slack awayD、slack

考题 松出一点!()A、Hold on a little bit!B、Take in the slack a little bit!C、Slack away a little bit!D、Heave in the slack a little bit!

考题 Slack ()the head line !A、downB、inC、outD、away

考题 多松一点。()A、Give us plenty of slack.B、Give us a little slack.C、Give us less slack.D、Give us a bit slack.

考题 ()(收紧) the slack on the stern line.A、Heave outB、Take inC、Pick inD、Heave away

考题 You should slack the mooring lines ()when the wind is big.A、at the same timeB、on timeC、in timeD、at times

考题 尾缆放松!()A、Take in stern line!B、Hold on stern line!C、Slack away stern line!D、Send out stern line!

考题 松出()A、slack awayB、take inC、hold onD、let go

考题 Take in the slack on ()(尾缆)!A、breast lineB、heavy lineC、stern lineD、head line

考题 单选题Increasing the number of slack liquid tanks has the effect of raising the().A uncorrected KGB maximum allowed KGC virtual height of the center of gravityD metacentric height

考题 单选题When a deck cargo is secured with chain or wire lashings and grab (pear) links,which statement is FALSE?()A The amount of take-up is limited by the length of the turnbuckleB At the grab (pear) link,the slack end of chain should be led back and secured to the chain above the linkC The lashings should be inspected each day and any slack taken upD The turnbuckle should be secured with a stick or lock nuts

考题 单选题Slack ()head line.A downB awayC forD on