网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
With the CLI command profile atm 1483 bulk-config-name test atm-pppoe,which three statements describe its purpose and implementation?()
A.Profile atm 1483 must be applied to the atm major interface.
B.The bulk-config-name used is test atm-pppoe.
C.The bulk-config-name used is test.
D.Atm-pppoe is the atm base profile.
E.Atm-pppoe is the atm level interface description.
参考答案
更多 “ With the CLI command profile atm 1483 bulk-config-name test atm-pppoe,which three statements describe its purpose and implementation?() A.Profile atm 1483 must be applied to the atm major interface.B.The bulk-config-name used is test atm-pppoe.C.The bulk-config-name used is test.D.Atm-pppoe is the atm base profile.E.Atm-pppoe is the atm level interface description. ” 相关考题
考题
92 Project life cycles provide a better means of measurement of progress and control. The four phases of a project are conceptual development, _____, _____, and _____.A. Preliminary planning, detail planning, closeoutB. Implementation, reporting, terminationC. Development, implementation, terminationD. Execution, reporting, finishingE. Implementation, termination, post-audit review
考题
174 Project life cycles provide a better means of measurement of progress and control. The four phases of a project are conceptual development, _____, _____, and _____.A. Preliminary planning, detail planning, closeoutB. Implementation, reporting, terminationC. Development, implementation, terminationD. Execution, reporting, finishingE. Implementation, termination, post-audit review
考题
YoudeployedaJavaEESharedLibraryandwanttouseitfromanapplicationthatisalsodeployedonthesamecluster.Whichtwomanifestattributesmustbespecifiedataminimumwithcorrespondingvaluesinthedeploymentdescriptoroftheapplicationthatrequires?()A.Implementation-VersionB.Specification-VersionC.Extension-NameD.Specification-VendorE.Implementation-Vendor
考题
Which configuration command represents a static host route in a Routed 1483 network?()
A.iproute 172.10.1.20.0.0.0 atm 6/0.33B.iproute 172.10.1.2255.255.255.0 atm 6/0.33C.iproute 172.10.1.2255.255.255.255 172.10.1.2D.iproute 172.10.1.2255.255.255.255 atm 6/0.33
考题
In a Bridged 1483 network, which set of commands is used to configure an ATM sub-interface?()
A. interface atm 6/0.33 atm pvc 33 0 33 aal5snap ip description Company-XYZ encapsulation bridge1483 ip address unnumbered loopback0B. interface atm 6/0.33 atm pvc 33 0 33 aal5snap ip description Company-XYZ encapsulation bridge1483 ip unnumbered loopback0C. interface atm 6/0.33 atm pvc 33 0 33 aal5snap encapsulation bridge1483 ip description Company-XYZ ip address unnumbered loopback0D. interface atm 6/0.33 atm pvc 33 0 33 aal5snap encapsulation bridge1483 ip description Company-XYZ ip unnumbered loopback0
考题
In a Bridged 1483 network, which set of commands represent an operationally correct configuration for an ATM subinterface?()
A. interface atm 6/0.33 atm pvc 33 0 33 aal5mux encapsulation bridge1483 ip unnumbered loopback0B. interface atm 6/0.33 atm pvc 33 0 33 aal5snap encapsulation bridge1483 ip unnumbered loopback0C. interface atm 6/0.33 atm pvc 33 0 33 aal5mux encapsulation bridge1483 ip address unnumbered loopback0D. interface atm 6/0.33 atm pvc 33 0 33 aal5snap encapsulation bridge1483 ip address 0.0.0.0 255.255.255.255
考题
Which configuration command assigns a host route to the CPE workstation address of 192.168.10.1 in a Bridged 1483 network?()
A. ip route 192.168.10.1 255.255.255.255 atm 6/2.1B. ip route 192.168.10.1 255.255.255.252 atm 6/2.1C. add route 192.168.10.1 255.255.255.252 atm 6/2.1D. add route 192.168.10.1 255.255.255.255 atm 6/2.1
考题
Which configuration command represents a static customer route in a Routed 1483 network?()
A.ip route 40.40.0.0255.255.0.0 172.10.1.2B.ip route 40.40.0.00.0.255.255 atm 6/0.33C.ip route 40.40.0.00.0.255.255 172.10.1.2D.ip route 40.40.0.0255.255.0.0 atm 6/0.33
考题
Which two B-RAS service offerings do not require user authentication?()
A.Routed 1483B.Bridged 1483C.PPP over ATMD.PPP over Ethernet
热门标签
最新试卷