网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
A customer is evaluating using the PCIe SSD adapter for the system boot in their new Power 750. Redundancy and hot-swap capability are required. What configuration supports the customer requirements?()
A
Configure the PCIe SSD adapter and drive modules as a JBOD
B
Configure a pair of mirrored PCIe SSD adapters and drive modules
C
Configure the PCIe SSD adapter and drive modules in a RAID-6 array
D
Configure the PCIe SSD adapter and drive modules in a RAID-5 array
参考答案
参考解析
解析:
暂无解析
更多 “单选题A customer is evaluating using the PCIe SSD adapter for the system boot in their new Power 750. Redundancy and hot-swap capability are required. What configuration supports the customer requirements?()A Configure the PCIe SSD adapter and drive modules as a JBODB Configure a pair of mirrored PCIe SSD adapters and drive modulesC Configure the PCIe SSD adapter and drive modules in a RAID-6 arrayD Configure the PCIe SSD adapter and drive modules in a RAID-5 array” 相关考题
考题
A customer uses an IBM xSeries x366 for their network server.They experienced downtime when the NIC failed earlier this year.Their Novell 6.5 server needs to be accessible all the time at the highest speed possible.Slots are available where network adapters can still be added. High availability is the primary requirement, but increased network bandwidth on the server is also required. Which of the following is the most cost-effective solution to satisfy all of the customer’s requirements?()A、Upgrade the network switches to 10Gb speed.B、Install a dual port gigabit Ethernet adapter and configure adapter load balancing teaming with the onboard adapters.C、Install one extra adapter to team with the internal adapter and configure adapter failover.D、Install two additional NICs and configure adapter load balancing teaming with the onboard adapters.
考题
A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()A、PCIe adaptersB、PCI-X adaptersC、PCI-X and PCIe adaptersD、PCI, PCI-X and PCIe adapters
考题
A customer is planning on having a single Virtual I/O Server (VIOS) configuration in a Power 750. They haveselected a 4-port 1Gb Integrated Virtual Ethernet (IVE). There will be no other network cards installed in the system. One IVE logical port will be used in the VIO Server and will be used as the physicalport in a Shared Ethernet Adapter (SEA). What is the maximum number of IVE logical ports available to use inother LPARs?()A、1B、7C、15D、31
考题
A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()A、Two dual-port PCIe adaptersB、A four-port PCIe Ethernet adapterC、Four separate PCIe Ethernet adaptersD、Two embedded Integrated Virtual Ethernet adapters (IVE)
考题
A customer is evaluating using the PCIe SSD adapter for the system boot in their new Power 750. Redundancy and hot-swap capability are required. What configuration supports the customer requirements?()A、Configure the PCIe SSD adapter and drive modules as a JBODB、Configure a pair of mirrored PCIe SSD adapters and drive modulesC、Configure the PCIe SSD adapter and drive modules in a RAID-6 arrayD、Configure the PCIe SSD adapter and drive modules in a RAID-5 array
考题
A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()A、Configure 2CFFh combination fibre channel / gigabit Ethernet adaptersB、Configure 1CFFh 2-port fibre channel adapter and 1 CIOv 2-port gigabit Ethernet adapterC、Configure 1CIOv 2-port fibre channel adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapterD、Configure 1CIOv 2-port gigabit Ethernet adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapter
考题
What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()A、The new system requires 1 installed processor card for the GX++ bus adapterB、The new system requires a minimum of 2 installed processor cards for the GX++ bus adapterC、The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapterD、The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter
考题
A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system. How might the pSeries technical specialist aid the customer in addressing their concern?()A、Direct the customer to the Installation Guide for each system to identify the power requirements.B、Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.C、Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.D、Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.
考题
A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A、Populate the Power 750 first then add a GX+ adapter to support PCI-X and PCIe I/O drawer loops.B、Populate the Power 750 first then add 2 GX+ adapters to support PCI-X and PCIe I/O drawer loops.C、Populate the Power 750 first then add a GX++ adapter to support PCI-X and PCIe I/O drawer loops.D、Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X and PCIe I/O drawer loops.
考题
A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()A、Configure 2 CFFh combination fibre channel / gigabit Ethernet adaptersB、Configure 1 CFFh 2-port fibre channel adapter and 1 CIOv 2-port gigabit Ethernet adapterC、Configure 1 CIOv 2-port fibre channel adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapterD、Configure 1 CIOv 2-port gigabit Ethernet adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapter
考题
A customer is upgrading from a 16-core POWER6 570 with two enclosures to a 16-core Power 770 with only one enclosure. There are 22 PCI-X adapters and 19 PCIe adapters spread across the current CECs and I/O drawers. How many and what kind of drawers are needed to connect these adapters?()A、2 PCI-X drawers and 2 PCIe drawersB、3 PCI-X drawers and 4 PCIe drawersC、4 PCI-X drawers and 3 PCIe drawersD、4 PCI-X drawers and 2 PCIe drawers
考题
A medical customer has an installed HS21 blade with no local disk. They are attempting to set up boot from SAN using a Windows 2003 CD. Which sequence is correct for this procedure? ()A、Install Windows from the CD using the QLogic driver provided on the CD, configure the LUN and zone for the target server, and then configure the blade UEFI to boot from SAN.B、Configure the LUN and zone for the target server, install Windows from the CD and press F6 when prompted to supply the driver, and then configure the QLogic adapter BIOS to boot from SAN. C、Configure the LUN and zone for the target server, configure the QLogic adapter BIOS to boot from SAN, install Windows from the CD, and then press F6 when prompted to supply the driver. D、Configure the blade UEFI to boot from SAN, configure the LUN and zone for the target server, and then install Windows from the CD using the QLogic driver provided on the CD
考题
单选题A customer is looking at an Oracle E-Business solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()A
Select the Server Proven configuration for Oracle E-BusinessB
UseeConfig to configure a Power server with AIX to support Oracle E-Business applicationsC
Download the Oracle E-Business sizing questionnaire from IBM, fill out with customer and submit to IBM for System x sizingD
Use SSCT to configure a system that meets the minimum requirements specified by Oracle E-Business
考题
单选题A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()A
Two dual-port PCIe adaptersB
A four-port PCIe Ethernet adapterC
Four separate PCIe Ethernet adaptersD
Two embedded Integrated Virtual Ethernet adapters (IVE)
考题
单选题A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()A
Configure 2 CFFh combination fibre channel / gigabit Ethernet adaptersB
Configure 1 CFFh 2-port fibre channel adapter and 1 CIOv 2-port gigabit Ethernet adapterC
Configure 1 CIOv 2-port fibre channel adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapterD
Configure 1 CIOv 2-port gigabit Ethernet adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapter
考题
单选题A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A
Populate the Power 750 first then add a GX+ adapter to support PCI-X andPCIe I/O drawer loops.B
Populate the Power 750 first then add 2 GX+ adapters to support PCI-X andPCIe I/O drawer loops.C
Populate the Power 750 first then add a GX++ adapter to support PCI-X andPCIe I/O drawer loops.D
Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X andPCIe I/O drawer loops.
考题
单选题A customer is planning on having a single Virtual I/O Server (VIOS) configuration in a Power 750. They haveselected a 4-port 1Gb Integrated Virtual Ethernet (IVE). There will be no other network cards installed in the system. One IVE logical port will be used in the VIO Server and will be used as the physicalport in a Shared Ethernet Adapter (SEA). What is the maximum number of IVE logical ports available to use inother LPARs?()A
1B
7C
15D
31
考题
单选题What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()A
The new system requires 1 installed processor card for the GX++ bus adapterB
The new system requires a minimum of 2 installed processor cards for the GX++ bus adapterC
The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapterD
The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter
考题
单选题A customer is upgrading from a 16-core POWER6 570 with two enclosures to a 16-core Power 770 with only one enclosure. There are 22 PCI-X adapters and 19 PCIe adapters spread across the current CECs and I/O drawers. How many and what kind of drawers are needed to connect these adapters?()A
2 PCI-X drawers and 2 PCIe drawersB
3 PCI-X drawers and 4 PCIe drawersC
4 PCI-X drawers and 3 PCIe drawersD
4 PCI-X drawers and 2 PCIe drawers
考题
单选题A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A
Populate the Power 750 first then add a GX+ adapter to support PCI-X and PCIe I/O drawer loops.B
Populate the Power 750 first then add 2 GX+ adapters to support PCI-X and PCIe I/O drawer loops.C
Populate the Power 750 first then add a GX++ adapter to support PCI-X and PCIe I/O drawer loops.D
Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X and PCIe I/O drawer loops.
考题
单选题A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system. How might the pSeries technical specialist aid the customer in addressing their concern?()A
Direct the customer to the Installation Guide for each system to identify the power requirements.B
Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.C
Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.D
Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.
考题
单选题A customer is evaluating using the PCIe SSD adapter for the system boot in their new Power 750. Redundancy and hot-swap capability are required. What configuration supports the customer requirements?()A
Configure the PCIe SSD adapter and drive modules as a JBODB
Configure a pair of mirrored PCIe SSD adapters and drive modulesC
Configure the PCIe SSD adapter and drive modules in a RAID-6 arrayD
Configure the PCIe SSD adapter and drive modules in a RAID-5 array
考题
单选题A customer has a new Power 720 with PowerVM Standard Edition. They plan to migrate their single-partition POWER5 550 to the new Power 720. How can the customer migrate from the POWER5 550 to the Power 720 with minimal effort and down time?()A
Perform Live Partition Mobility between the two systems.B
Move the boot disks from the old system to the new system.C
Use Tivoli Storage Manager to back up the POWER5 550 and restore on the Power 720.D
Upgrade AIX to the latest level on the POWER5 550 and clone using the mksysb command.
考题
单选题A customer is deploying a new database on a PS701 Blade in a BladeCenter H, and requires redundant network and SAN adapters. Which configuration supports the customer requirement?()A
Configure 2CFFh combination fibre channel / gigabit Ethernet adaptersB
Configure 1CFFh 2-port fibre channel adapter and 1 CIOv 2-port gigabit Ethernet adapterC
Configure 1CIOv 2-port fibre channel adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapterD
Configure 1CIOv 2-port gigabit Ethernet adapter and 1 CFFh combination fibre channel / gigabit Ethernet adapter
考题
单选题A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A
Populate the Power 750 first then add a GX+ adapter to support PCI-X and PCIe I/O drawer loops.B
Populate the Power 750 first then add 2 GX+ adapters to support PCI-X and PCIe I/O drawer loops.C
Populate the Power 750 first then add a GX++ adapter to support PCI-X and PCIe I/O drawer loops.D
Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X and PCIe I/O drawer loops.
考题
单选题A customer uses an IBM xSeries x366 for their network server.They experienced downtime when the NIC failed earlier this year.Their Novell 6.5 server needs to be accessible all the time at the highest speed possible.Slots are available where network adapters can still be added. High availability is the primary requirement, but increased network bandwidth on the server is also required. Which of the following is the most cost-effective solution to satisfy all of the customer’s requirements?()A
Upgrade the network switches to 10Gb speed.B
Install a dual port gigabit Ethernet adapter and configure adapter load balancing teaming with the onboard adapters.C
Install one extra adapter to team with the internal adapter and configure adapter failover.D
Install two additional NICs and configure adapter load balancing teaming with the onboard adapters.
考题
单选题A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()A
PCIe adaptersB
PCI-X adaptersC
PCI-X and PCIe adaptersD
PCI, PCI-X and PCIe adapters
热门标签
最新试卷