网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A customer is upgrading from a 16-core POWER6 570 with two enclosures to a 16-core Power 770 with only one enclosure. There are 22 PCI-X adapters and 19 PCIe adapters spread across the current CECs and I/O drawers. How many and what kind of drawers are needed to connect these adapters?()
A

2 PCI-X drawers and 2 PCIe drawers

B

3 PCI-X drawers and 4 PCIe drawers

C

4 PCI-X drawers and 3 PCIe drawers

D

4 PCI-X drawers and 2 PCIe drawers


参考答案

参考解析
解析: 暂无解析
更多 “单选题A customer is upgrading from a 16-core POWER6 570 with two enclosures to a 16-core Power 770 with only one enclosure. There are 22 PCI-X adapters and 19 PCIe adapters spread across the current CECs and I/O drawers. How many and what kind of drawers are needed to connect these adapters?()A 2 PCI-X drawers and 2 PCIe drawersB 3 PCI-X drawers and 4 PCIe drawersC 4 PCI-X drawers and 3 PCIe drawersD 4 PCI-X drawers and 2 PCIe drawers” 相关考题
考题 An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC.Which infrastructure is required for the new HMC?()A.An additional switch for the new HMCB.Asynchronous adapters on the new HMCC.The two 570 servers are directly connected to the new HMCD.One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

考题 When considering migrating a POWER6 server with PCI-X and PCIe adapters to a Power 720, which statement is true?()A、PCIe adapters are supported only in I/O drawersB、PCI-X adapters are supported in both the CEC and in I/O drawersC、PCI-X adapters are supported in the CEC; PCIe adapters are supported in 12X I/O drawersD、PCIe adapters are supported in the CEC; PCI-X adapters are supported in 12X I/O drawers

考题 An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A、An additional switch for the new HMc  B、Asynchronous adapters on the new HMcC、The two 570 servers are directly connected to the new HMc  D、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

考题 A customer would like to buy a new Power 750 and attach 2 PCIe I/O drawers. What is the minimum configuration which will support this?()A、One processor card and one GX+ expansion cardB、Two processor cards and one GX++ expansion cardC、One processor card, one GX+ expansion card, and one GX++ expansion cardD、Two processor cards, one GX+ expansion card, and one GX++ expansion card

考题 A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()A、PCIe adaptersB、PCI-X adaptersC、PCI-X and PCIe adaptersD、PCI, PCI-X and PCIe adapters

考题 A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()A、Two dual-port PCIe adaptersB、A four-port PCIe Ethernet adapterC、Four separate PCIe Ethernet adaptersD、Two embedded Integrated Virtual Ethernet adapters (IVE)

考题 A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure. Which solution addresses the customer requirements?()A、Move the storage into a common SAN and virtualize the I/O using a single VIO Server with dual NIC connectors and dual HBAsB、Move the existing physical network and storage adapters to the new system and virtualize the I/O using a single VIO Server.C、Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, each with dual NIC connectors and dual HBAs.D、Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, one with dual NIC connectors and the other with dual HBAs.

考题 A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()A、PCIe adaptersB、PCI-X adaptersC、PCI-X andPCIe adaptersD、PCI, PCI-X andPCIe adapters

考题 The pSeries technical specialist is designing a two LPAR p5-570 with eight total processors.  The system is a test system to run AIX 5.2.  The customer has stated a preference for internal disks for the boot devices.  The customer has said they may later need to run three or four LPARs without increasing the number of processors. What should the pSeries technical specialist tell the customer about the ability of the p5-570 to meet their requirements?()A、It will require additional SCSI adapters and I/O drawers or external disks to support more than two LPARs.B、It has sufficient built-in SCSI controllers and disk enclosures to support four total LPARs by only adding the necessary additional disks.C、It is unable to use internal disks for LPARs and therefore additional adapters I/O drawers or external disks must be used to support all LPARs.D、It can support six LPARs with internal disks but will require special features, cables and an adapter to support the additional LPARs with internal disks.

考题 A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A、Populate the Power 750 first then add a GX+ adapter to support PCI-X andPCIe I/O drawer loops.B、Populate the Power 750 first then add 2 GX+ adapters to support PCI-X andPCIe I/O drawer loops.C、Populate the Power 750 first then add a GX++ adapter to support PCI-X andPCIe I/O drawer loops.D、Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X andPCIe I/O drawer loops.

考题 A Power 770 customer needs to add additional I/O adapters.  There is no room for the cards, so an I/O drawer must be added. What resource will help identify supported I/O drawers and the maximum number of drawers permitted per loop?()A、I/O Planning GuideB、Power Systems data sheetC、Power Systems Facts and FeaturesD、Run FLRT to recommend I/O features

考题 A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A、Populate the Power 750 first then add a GX+ adapter to support PCI-X and PCIe I/O drawer loops.B、Populate the Power 750 first then add 2 GX+ adapters to support PCI-X and PCIe I/O drawer loops.C、Populate the Power 750 first then add a GX++ adapter to support PCI-X and PCIe I/O drawer loops.D、Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X and PCIe I/O drawer loops.

考题 A customer is purchasing a 12-way p5-570 to run light development workloads on eight AIX 5.3 partitions with two network adapters each.  When the current network configuration was reviewed, it was discovered that they only have four Ethernet ports available on their network switch.  Which of the following solutions would prevent them from having to buy another network switch or hub?()A、Add two HMCs with two Ethernet adapters each and run EtherChannel for the original eight partitions.B、Add two HMCs with two Ethernet adapters each and run Virtual Ethernet for the original eight partitions.C、Add two hosting partitions with two Ethernet adapters each and run EtherChannel for the original eight partitions.D、Add two hosting partitions with two Ethernet adapters each and run Virtual Ethernet for the original eight partitions.

考题 A customer is upgrading from a 16-core POWER6 570 with two enclosures to a 16-core Power 770 with only one enclosure. There are 22 PCI-X adapters and 19 PCIe adapters spread across the current CECs and I/O drawers. How many and what kind of drawers are needed to connect these adapters?()A、2 PCI-X drawers and 2 PCIe drawersB、3 PCI-X drawers and 4 PCIe drawersC、4 PCI-X drawers and 3 PCIe drawersD、4 PCI-X drawers and 2 PCIe drawers

考题 单选题A Power 770 customer needs to add additional I/O adapters.  There is no room for the cards, so an I/O drawer must be added. What resource will help identify supported I/O drawers and the maximum number of drawers permitted per loop?()A I/O Planning GuideB Power Systems data sheetC Power Systems Facts and FeaturesD Run FLRT to recommend I/O features

考题 单选题An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A An additional switch for the new HMCB Asynchronous adapters on the new HMCC The two 570 servers are directly connected to the new HMCD One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC

考题 单选题A customer is planning to buy a two enclosure Power 770, and will implement 4 LPARs with the following requirements:Each LPAR must have a private, dedicated connection to the network.The adapter for this network connection must be hot-swappable.The customer wants to minimize the number of I/O slots used. Which of the following fulfills the customer requirements?()A Two dual-port PCIe adaptersB A four-port PCIe Ethernet adapterC Four separate PCIe Ethernet adaptersD Two embedded Integrated Virtual Ethernet adapters (IVE)

考题 单选题A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()A PCIe adaptersB PCI-X adaptersC PCI-X andPCIe adaptersD PCI, PCI-X andPCIe adapters

考题 单选题A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A Populate the Power 750 first then add a GX+ adapter to support PCI-X andPCIe I/O drawer loops.B Populate the Power 750 first then add 2 GX+ adapters to support PCI-X andPCIe I/O drawer loops.C Populate the Power 750 first then add a GX++ adapter to support PCI-X andPCIe I/O drawer loops.D Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X andPCIe I/O drawer loops.

考题 单选题When considering migrating a POWER6 server with PCI-X and PCIe adapters to a Power 720, which statement is true?()A PCIe adapters are supported only in I/O drawersB PCI-X adapters are supported in both the CEC and in I/O drawersC PCI-X adapters are supported in the CEC; PCIe adapters are supported in 12X I/O drawersD PCIe adapters are supported in the CEC; PCI-X adapters are supported in 12X I/O drawers

考题 单选题A customer plans to consolidate two 8-core POWER6 systems with a total of 8 PCI-X adapters, 6 PCIe adapters, and a PCI-X I/O drawer into a 16-core Power 750. Which action allows the most efficient use of existing equipment?()A Populate the Power 750 first then add a GX+ adapter to support PCI-X and PCIe I/O drawer loops.B Populate the Power 750 first then add 2 GX+ adapters to support PCI-X and PCIe I/O drawer loops.C Populate the Power 750 first then add a GX++ adapter to support PCI-X and PCIe I/O drawer loops.D Populate the Power 750 first then add GX+ and GX++ adapters to support PCI-X and PCIe I/O drawer loops.

考题 单选题A customer is purchasing a 12-way p5-570 to run light development workloads on eight AIX 5.3 partitions with two network adapters each.  When the current network configuration was reviewed, it was discovered that they only have four Ethernet ports available on their network switch.  Which of the following solutions would prevent them from having to buy another network switch or hub?()A Add two HMCs with two Ethernet adapters each and run EtherChannel for the original eight partitions.B Add two HMCs with two Ethernet adapters each and run Virtual Ethernet for the original eight partitions.C Add two hosting partitions with two Ethernet adapters each and run EtherChannel for the original eight partitions.D Add two hosting partitions with two Ethernet adapters each and run Virtual Ethernet for the original eight partitions.

考题 单选题A customer has several single partition POWER5 and POWER6 processor-based systems housed in regional data centers and wants to consolidate into a single Power 770. They must minimize overall cost and the number of adapters, while ensuring a reliable infrastructure. Which solution addresses the customer requirements?()A Move the storage into a common SAN and virtualize the I/O using a single VIO Server with dual NIC connectors and dual HBAsB Move the existing physical network and storage adapters to the new system and virtualize the I/O using a single VIO Server.C Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, each with dual NIC connectors and dual HBAs.D Move the storage into a common SAN and virtualize the I/O using dual VIO Servers, one with dual NIC connectors and the other with dual HBAs.

考题 单选题A customer wants to migrate their existing compute-intensive POWER6 570 to a Power 770. Which of their existing I/O adapters can be migrated to Power 770 enclosures?()A PCIe adaptersB PCI-X adaptersC PCI-X and PCIe adaptersD PCI, PCI-X and PCIe adapters

考题 单选题An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A An additional switch for the new HMc  B Asynchronous adapters on the new HMcC The two 570 servers are directly connected to the new HMc  D One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

考题 单选题A customer would like to buy a new Power 750 and attach 2 PCIe I/O drawers. What is the minimum configuration which will support this?()A One processor card and one GX+ expansion cardB Two processor cards and one GX++ expansion cardC One processor card, one GX+ expansion card, and one GX++ expansion cardD Two processor cards, one GX+ expansion card, and one GX++ expansion card

考题 单选题The pSeries technical specialist is designing a two LPAR p5-570 with eight total processors.  The system is a test system to run AIX 5.2.  The customer has stated a preference for internal disks for the boot devices.  The customer has said they may later need to run three or four LPARs without increasing the number of processors. What should the pSeries technical specialist tell the customer about the ability of the p5-570 to meet their requirements?()A It will require additional SCSI adapters and I/O drawers or external disks to support more than two LPARs.B It has sufficient built-in SCSI controllers and disk enclosures to support four total LPARs by only adding the necessary additional disks.C It is unable to use internal disks for LPARs and therefore additional adapters I/O drawers or external disks must be used to support all LPARs.D It can support six LPARs with internal disks but will require special features, cables and an adapter to support the additional LPARs with internal disks.