网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
The fourth engineer accompanied by the workers on oil barge measures the oil levels, temperature and () in the tanks.
A
tank table
B
trim
C
water contents
D
oil pressure
参考答案
参考解析
解析:
暂无解析
更多 “单选题The fourth engineer accompanied by the workers on oil barge measures the oil levels, temperature and () in the tanks.A tank tableB trimC water contentsD oil pressure” 相关考题
考题
During UMS rounds, a duty engineer notices that the fuel oil overflow observation glass is full of oil. Should he ____.A.Stop all F.O. transfers immediately, and inform the chief engineer.B.Make a sounding of the F.O. overflow tank and decide if there is enough capacity to leave it until the following morning.C.Call a motorman and have him sound the F.O. overflow tank periodically during the night.D.start the F.O. purifier
考题
Immediately after any diesel engine is started, the engineer should check the ______.A.crankcase pressureB.lube oil pressureC.saltwater pressureD.exhaust temperature
考题
A shipboard oil pollution emergency plan is required of ______.A.all vessels, regardless of size and commercial applicationB.any barge or other ship which is constructed or operated in such a manner that no oil in any form can be carried aboardC.an oil tanker of 150 gross tons or above, or other ship of 400 gross tons or aboveD.an oil tanker of 400 gross tons and above, or other ships of 150 gross tons and above
考题
Where is the most probable location of the remote shutdown station for cargo pumps on a tank barge carrying oil ________.A.The loading dockB.The midpoint of the bargeC.Within 25 feet of the pump engineD.Above the forward rake end
考题
The equipment required to remove an on-deck oil spill on a barge transfering oil must either be carried on board or ______.A.on a tug standing byB.available by contract with the shore facilityC.kept at the shoreside hose connection during transferD.kept in a protected shoreside location readily accessible
考题
The()(液货船) includes oil tanker, VLCC, LNG ,etc.A、chemica lcarrierB、tankerC、refrigeratorD、barge
考题
The ()carries people, cargo, and car or truck for short passages.A、oil bargeB、oil shipC、ferryD、barge
考题
The()(渡船 carries people, cargo, car or truck for short passages.A、oil bargeB、oil shipC、ferryD、barge
考题
The pilot boat takes a pilot to an/a()(远洋船).A、container shipB、oil shipC、ocean-going shipD、barge
考题
单选题If the overflow tank high-level alarm sounds while the fuel oil tanks are being topped off, the engineer should ().A
close the static leg filling valveB
close the overflow tank falling valveC
reduce the fuel oil pumping rateD
stop the fuel oil pumping operation
考题
单选题After oil pollution occurs in Chinese ports,what action shall be first taken by ship’s Captain and Chief Engineer?()A
to use the oil dispersantB
to organize the persons to collect the oilC
to report the matter to MSA and ask for instructionsD
to put forward an accident report within 24 hours
考题
单选题The fourth engineer accompanied by the workers on oil barge measures the oil levels, temperature and () in the tanks.A
tank tableB
trimC
water contentsD
oil pressure
考题
单选题Before starting a diesel engine that has an engine driven lube oil pump, the engineer should ().A
open the bypass lineB
cut in the lube oil coolerC
pressurize the lube oil systemD
top off the expansion tank
考题
单选题A shipboard oil pollution emergency plan is required of ().A
all vessels, regardless of size and commercial applicationB
any barge or other ship which is constructed or operated in such a manner that no oil in any form can be carried aboardC
an oil tanker of 150 gross tons or above, or other ship of 400 gross tons or aboveD
an oil tanker of 400 gross tons and above, or other ships of 150 gross tons and above
考题
单选题A shipboard Oil Pollution Emergency Plan is required of().A
all vessels,regardless of size and commercial applicationB
any barge or ship constructed or operated in such a manner that no oil in any form can be carried aboardC
an oil tanker of 150 gross tons and above,or other ship of 400 gross tons and aboveD
an oil tanker of 400 gross tons and above,or other ships of 150 gross tons and above
考题
单选题Usually() handles the majority of the correspondence and negotiation needed during transactions of stores and spare parts in the engine department.A
the chief engineerB
the second engineerC
the third engineerD
the fourth engineer
考题
单选题The equipment required to remove an on-deck oil spill on a barge transfering oil must either be arried on board or().A
on a tug standing byB
available by contract with the shore facilityC
kept at the shoreside hose connection during transferD
kept in a protected shoreside location readily accessible
考题
单选题Immediately after any diesel engine is started, the engineer should check the ()A
crankcase pressureB
lube oil pressureC
saltwater pressureD
exhaust temperature
考题
单选题The ash content of a fuel oil is significant to the operating engineer because it ()A
is an indication of the amount of noncombustible material present in the oilB
indicates the quantity of energy released by burning a unit amount of the fuelC
is useful for determining proper atomization temperaturesD
reflects the overall thermal efficiency of the fuel oil service system
考题
单选题“Before disconnecting the oil pipe, would you flush the oil retained in the pipe?” asked the oil barge owner ()A
by using of fresh waterB
with compressed airC
by using of sea waterD
with chemical compound
考题
单选题How do the militants justify their kidnapping of oil workers?A
They argue that oil resources in the Niger Delta region are exhausting.B
They are not satisfied with the generous Pay of the oil workers.C
They claim that the Niger Delta region is off limit to foreign oil companies.D
They see their action as protest against the uneven distribution of the oil wealth.
考题
单选题Who is in charge of the auxiliary boilers?()A
The chief engineerB
The second engineerC
The third engineerD
The fourth engineer
考题
单选题An inland oil barge must have equipment available to remove an on-deck oil spill of at least().A
one barrelB
two barrelsC
five barrelsD
ten barrels
考题
单选题Where is the most probable location of the remote shutdown station for cargo pumps on a tank barge carrying oil().A
The loading dockB
The midpoint of the bargeC
Within 25 feet of the pump engineD
Above the forward rake end
热门标签