网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A 15-ton bulldozer employed caused the bilge limber boards on both sides().
A

serious damaged

B

seriously damage

C

serious damage

D

seriously damaged


参考答案

参考解析
解析: 暂无解析
更多 “单选题A 15-ton bulldozer employed caused the bilge limber boards on both sides().A serious damagedB seriously damageC serious damageD seriously damaged” 相关考题
考题 The physical components of a computer are collectively called () . A、hardwareB、softwareC、memoryD、boards

考题 It is the management and boards of the banks that must recreate customer and ________value. A、shareholderB、stakeholderC、goodsD、seller

考题 What can be used to cover bilge before loading?

考题 ()must be familiar with these requirements of bilge water management, particularly those directly involved with such operations involving bilge water. A.All responsible personnelB.All the crew served in engine roomC.The masterD.The chief engineer

考题 Accidental flooding of the engine room bilges by the bilge main is prevented by( ).A.stop-check valves installed in the bilge suction manifoldsB.using a positive displacement reciprocating bilge pumpC.installing educators in all bilge rose boxesD.installing a swing check before each bilge valve

考题 explain bilge and ballast pumping through ejector ?

考题 Limber is a term associated with ______.A.Emergency gearB.DrainageC.Deck cargo storageD.Securing gear

考题 When using the term limber system one is referring to a ______.A.Cleaning systemB.Drainage systemC.Strengthening systemD.Weight reduction system

考题 What is the purpose of limber holes ________.A.To allow for air circulationB.To allow for stress and strain in rough watersC.To allow water in the boat to drain overboardD.To allow water in the bilge to get to the boat drain

考题 Before loading bulk grain, bilge wells must be covered to ______.A.add strength to the bilge well strainerB.permit rapid flow of water to the bilge wellsC.prevent cargo sifting into the bilge wellsD.prevent oil, water, or other liquid from reaching the cargo

考题 There currently seems to be a large____between the number of people employed in service industries, and those employed in the primary sector.A.different B.differential C.discrimination D.discrepancy

考题 The () will have a rotating honorary chairman.A、Board of DirectorsB、Boards of DirectorC、boards of directorD、Board Directors

考题 污水井()A、bilge wellB、bilge waterC、fresh waterD、sea water

考题 单选题The bilge system has been performing well; however, the aft starboard engine room bilgewell suddenly fails to be pumped outWhich of the following should be done first to determine the cause?()A Open the bilge pump for inspectionB Remove each of the manifold valvesC Remove only the manifold valve to the affected bilge-wellD Attempt to pump out another bilge well to determine if the entire system is affected

考题 单选题An emergency bilge pumping system is provided and should be () of the main bilge pumping system, according to the SOLAS 74 Convention.A dependentB in dependentC in seriesD in parallel

考题 单选题Before loading bulk grain,bilge wells must be covered to().A add strength to the bilge well strainerB permit rapid flow of water to the bilge wellsC prevent cargo sifting into the bilge wellsD prevent oil,water,or other liquid from reaching the cargo

考题 单选题Accidental flooding of the engine room bilges by the bilge main is prevented by ().A stop-check valves installed in the bilge manifoldsB using a positive displacement reciprocating bilge pumpC installing eductors in all bilge rose boxesD installing a swing check before each bilge valve

考题 单选题The emergency bilge suction or bilge () is used to prevent flooding of the ship.A injection valveB relief valveC discharge valveD inlet filter

考题 单选题The emergency bilge suction or bilge injection valve is used to prevent () of the ship.A proceedingB overloadingC collisionD flooding

考题 单选题During the PSC inspection, under the provisions of SOLAS 74, which one may not be regarded as clear grounds for ships’ detainment?()A failure of the proper operation of emergency generatorB insulation of piping including exhaust pipes in engine room contaminated by oilC improper operation of bilge of bilge of bilge pumping arrangementsD damaged sanitary pump

考题 单选题When using the term limber system one is referring to a().A Cleaning systemB Drainage systemC Strengthening systemD Weight reduction system

考题 单选题An oil water monitor is required in order to measure ().A the oil content in waterB the water content in fuel oilC the water level in bilge wellD the oil level in bilge well

考题 单选题Limber is a term associated with().A emergency gearB drainageC deck cargo storageD securing gear

考题 单选题If one of the bilge system manifold valves does not properly seat, the ()A bilge well connected to that valve, plus the second bilge well being pumped will be completely emptiedB bilge system will lose vacuum and prevent the other bilges from being pumped outC bilge well aft connected to that valve will siphon its contents to the forward bilge wellsD discharge pressure will be too high

考题 单选题You are unable to pump out the aft starboard engine room bilge well that is fouled, with one foot of water over the top of the bilge well, what actionshould be carried out?()A Send the wiper into the well with only a scoop and pailB Remove the bilge manifold valve and attempt to back flush the lineC Simultaneously operate all available bilge pumpsD It is only necessary to transfer half the contents of a drum of degreaser into the bilge well

考题 单选题When discharging bilge water, which criteria must be observed?()A The requirement for the oil content of bilge water discharged is 15 ppmB No discharge in sensitive watersC Any discharge in sensitive watersD International, national or local requirements have to be observed

考题 单选题If water is rising in the bilge of a lifeboat,you should FIRST().A abandon the survival craftB check for cracks in the hullC shift all personnel to the sternD check the bilge drain plug