网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
A technician needs to install an additional PCI NIC without powering down the server. Which of the following BEST describes the technology the board must support?()
- A、 Hot install
- B、 Hot add
- C、 Plug and play
- D、 Hot plug
参考答案
更多 “A technician needs to install an additional PCI NIC without powering down the server. Which of the following BEST describes the technology the board must support?()A、 Hot installB、 Hot addC、 Plug and playD、 Hot plug” 相关考题
考题
An administrator has just upgraded a server from non-hot plug storage to all hot plug storage. The administrator powers up the server, during POST the RAID controller is recognized but none of the drive lights flash.Which of the following should the administrator do FIRST to troubleshoot the problem?()A. Check the backplane cabling.B. Check the server BIOS.C. Update the RAID controller firmware.D. Install the latest hard drive firmware
考题
A technician at a small business goes into the server room to perform maintenance on a server and notices it is very hot and audible alarms are going off. The technician is unsure of how to remedy the situation. Which of the following should the technician do?()A、Turn off all the equipment in the server closetB、Install a fan in the server closetC、Turn off the power to the server closetD、Follow escalation procedures for emergencies
考题
A technician plugs a USB device into the front panel of a desktop computer and nothing happens.The technician knows that plug-n-play is enabled. Which of the following BEST describes a possible cause to this issue?()A、The technician plugged a USB 2.0 device into a USB 1.1 port.B、The technician needs to reboot the computer for the device to work.C、The technician plugged a USB 1.1 device into a USB 2.0 port.D、The front panel connectors are not plugged into the motherboard.
考题
An administrator has just upgraded a server from non-hot plug storage to all hot plug storage. The administrator powers up the server, during POST the RAID controller is recognized but none of the drive lights flash. Which of the following should the administrator do FIRST to troubleshoot the problem?()A、Check the backplane cabling.B、Check the server BIOS.C、Update the RAID controller firmware.D、Install the latest hard drive firmware
考题
A customer is evaluating PowerVM capabilities for dynamically allocating resources without rebooting LPARs. Which features of PowerVM support the customer requirement?()A、CoD and PCI hot-plugB、DLPAR and Active Memory SharingC、Hot node add and hot node repairD、D.ynamic processor failure and processor instruction retry
考题
After a server inspection, an administrator notices a single drive failure on a server configured with RAID 5. Which of the following is the NEXT step to start rebuilding the array?()A、Reestablish the mirror array.B、Perform online volume expansion.C、Insert hot plug drive.D、Move data to another volume.
考题
A technician has installed an additional NIC on a server. Which of the following can now be set up?()A、TeamingB、VLANsC、Port forwardingD、Full duplex
考题
Which of the following is a reason why Bob, a technician, should install case fans in the front of acomputer case?()A、It forces hot air out of the PCB、The fan is easier to remove and cleanC、It forces cooler air into the power supply quicklyD、It forces cooler air across the motherboard
考题
A technician needs to find an end of a network cable drop. Which of the following tools would the technician use?()A、Cable testerB、MultimeterC、Toner probeD、Loopback plug
考题
An administrator needs to add fault tolerance capabilities to a server. Which of the following is the BEST solution to accomplish this?()A、 Move the architecture from 32-bit to 64-bit.B、 Install a PBX card.C、 Install a second NIC card.D、 Install a fail-over cable.
考题
Which of the following will allow devices to be added without turning the server off?()A、Plug and PlayB、Warm siteC、Hot plugD、Hot site
考题
A technician temporarily needs an additional network connection in their office to test a newworkstation. Which of the following is the BEST solution to add a temporary network connection?()A、Install a small network switchB、Use port mirroring on the switchC、Split the pairs of the existing jackD、Install a CSU/DSU
考题
Which of the following command can be used to identify all PCI hot plug slots on a server and their characteristics()A、lsattr -l pciB、lscfg -vl pciC、lsdev -c slotD、lsslot -c pci -a
考题
Which of the following commands can be used to prepare a system to physically insert a PCI hot plug adapter()A、mkdevB、cfmgrC、drslotD、lsslot
考题
One of your best customers has limited funding and is interested in the ability to increase a system’s computing power as needed. Which of the following System x server attributes should the Sales Specialist promote?()A、Ability to hot-plug additional processors on demandB、Low cost of System x servers makes scaling out an optionC、"Pay as you Grow" scalability of the IBM System x3950 serverD、Integration of System x servers with the existing servers using an interconnect
考题
Which of the following commands can be used to identify all PCI hot plug slots on a server and their characteristics?()A、lsattr -l pciB、lscfg -Cc pciC、lsconn -p pci -aD、lsslot -c pci -a
考题
Which of the following commands can be used to get the system ready to physically insert a PCI hot plug adaptor?()A、mkdevB、cfmgrC、drslotD、lsslot
考题
A server has two PCI-X buses with four Active PCI-X slots. Slots 1 and 2 are on the first PCI-X bus (100MHz) and slots 3 and 4 are on the second PCI-X bus (133MHz). The customer requires you to install adapter A and adapter B on day one. After the server has been installed and configured, the server must be running 24 by 7 with no downtime. Three months later, adapter C needs to be hot added. All the adapters are 64-bit and capable of speeds up to 133MHz. The customer’s priority is to have no downtime, and performance is secondary. Based on the information provided, into which slots should adapters A and B be installed in and later into which slot would adapter C be hot-added?()A、Adapter A in slot 1, adapter B in slot 4 and hot-add adapter C in slot 3B、Adapter A in slot 1, adapter B in slot 3 and hot-add adapter C in slot 2C、Adapter A in slot 2, adapter B in slot 4 and hot-add adapter C in slot 3D、Adapter A in slot 3, adapter B in slot 1 and hot-add adapter C in slot 4
考题
单选题A technician plugs a USB device into the front panel of a desktop computer and nothing happens.The technician knows that plug-n-play is enabled. Which of the following BEST describes a possible cause to this issue?()A
The technician plugged a USB 2.0 device into a USB 1.1 port.B
The technician needs to reboot the computer for the device to work.C
The technician plugged a USB 1.1 device into a USB 2.0 port.D
The front panel connectors are not plugged into the motherboard.
考题
单选题A customer is evaluating PowerVM capabilities for dynamically allocating resources without rebooting LPARs. Which features of PowerVM support the customer requirement?()A
CoD and PCI hot-plugB
DLPAR and Active Memory SharingC
Hot node add and hot node repairD
D.ynamic processor failure and processor instruction retry
考题
单选题An administrator has just upgraded a server from non-hot plug storage to all hot plug storage. The administrator powers up the server, during POST the RAID controller is recognized but none of the drive lights flash. Which of the following should the administrator do FIRST to troubleshoot the problem?()A
Check the backplane cabling.B
Check the server BIOS.C
Update the RAID controller firmware.D
Install the latest hard drive firmware
考题
单选题An administrator is at a remote data center assisting a colleague who is replacing a bad fibre channel adapter. Which command can be used to manage a hot plug slot without powering off or rebooting the server()A
drslotB
IsslotC
IsattrD
prtconf
考题
单选题An administrator needs to replace a failed internal disk in a mirrored rootvg. Which of the following is one of the steps that must be followed()A
Deallocate rootvg mirrorB
Use hot replace managerC
Break rootvg mirrorD
Deallocate LPs from failed disk
考题
单选题A technician needs to install an additional PCI NIC without powering down the server. Which of the following BEST describes the technology the board must support?()A
Hot installB
Hot addC
Plug and playD
Hot plug
考题
单选题Which of the following will allow devices to be added without turning the server off?()A
Plug and PlayB
Warm siteC
Hot plugD
Hot site
考题
多选题Which of the following ports supports hot plug devices? ()AUSBBAGPCPCIDIDEEPS2
热门标签
最新试卷