网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
A customer is evaluating PowerVM capabilities for dynamically allocating resources without rebooting LPARs. Which features of PowerVM support the customer requirement?()
A
CoD and PCI hot-plug
B
DLPAR and Active Memory Sharing
C
Hot node add and hot node repair
D
D.ynamic processor failure and processor instruction retry
参考答案
参考解析
解析:
暂无解析
更多 “单选题A customer is evaluating PowerVM capabilities for dynamically allocating resources without rebooting LPARs. Which features of PowerVM support the customer requirement?()A CoD and PCI hot-plugB DLPAR and Active Memory SharingC Hot node add and hot node repairD D.ynamic processor failure and processor instruction retry” 相关考题
考题
A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server. What is the minimum PowerVM edition that supports the customer requirement?()A、 PowerVM Lx86B、 PowerVM Express EditionC、 PowerVM Standard EditionD、 PowerVM Enterprise Edition
考题
A customer is evaluating PowerVM capabilities for dynamically allocating resources without rebooting LPARs. Which features of PowerVM support the customer requirement?()A、CoD and PCI hot-plugB、DLPAR and Active Memory SharingC、Hot node add and hot node repairD、D.ynamic processor failure and processor instruction retry
考题
A customer has a requirement to eliminate single points of failure for an application. They have allocated one Ethernet adapter to each VIO server on the system. Which features of PowerVM and AIX will support the customer requirement?()A、Etherchannel and trunkingB、Network Interface Backup and EtherchannelC、Shared Ethernet Adapter (SEA) Failover and EtherchannelD、Network Interface Backup and Shared Ethernet Adapter failover
考题
A technician needs to install an additional PCI NIC without powering down the server. Which of the following BEST describes the technology the board must support?()A、 Hot installB、 Hot addC、 Plug and playD、 Hot plug
考题
A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature of PowerVM should be highlighted as a differentiator?()A、PowerVM offers partition mobility.B、PowerVM can virtualize network and SAN resources.C、PowerVM supports multiple operating systems running concurrently.D、PowerVM allows an LPAR to use activated cores and memory without limitation.
考题
Companycom wants to deploy WebSphere in an HACMP environment, running on two servers in LPARs. These servers will also host the test and dev LPARs. The customer would like to use the test and dev resources to support an HACMP failover. What is the best way to accomplish this task?()A、Run the test and dev LPARs in an uncapped modeB、Activate COD resources if a failover should occurC、Use DLPAR to move resources between the test and dev and the HACMP LPARD、Stop the test and dev environments, bring up new profile for HACMP failover
考题
A customer has a Power 770 running an SAP ERP workload on AIX 7. It has a single partition with 12 cores and 48GB of memory and the CPU is underutilized at 46% with 1000 users. Memory utilization is at 80%. The number of users will increase to 1700, increasing memory utilization by 37%. Which of the following supports this requirement?()A、Active Memory ServerB、Active Memory SharingC、Active Memory PoolingD、Active Memory Expansion
考题
A customer is consolidating seven IBM i partitions onto a POWER7 system, using VIO Server to virtualize resources.Which of the following PowerVM editions is appropriate for this customer?()A、IBM i EditionB、Express EditionC、Standard EditionD、Enterprise Edition
考题
A customer has shut down an LPAR after using DLPAR to add or remove processor and memory resources. When the partition is reactivated, the desired changes are missing. What action, or sequence of actions, will immediately and permanently solve this problem?()A、Add or remove the resources in the profile, click 'apply', then 'save'.B、Add or remove the resources using DLPAR and change the partition profile.C、Add or remove the resources using DLPAR, then shutdown and reactivate the LPAR.D、Add or remove the resources in the system profile and reboot the managed system.
考题
A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility. Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()A、 PowerVM Standard Edition on POWER6 hardwareB、 PowerVM Standard Edition with POWER5 hardware C、 PowerVM Enterprise Edition with POWER6 hardwareD、 PowerVM Enterprise Edition with POWER5 hardware
考题
A customer is considering procuring HP servers with Virtual Server Environment (VSE) to consolidate servers and dynamically move resources between partitions. How can the technical sales representative position PowerVM as the solution to virtualize this server environment?()A、PowerVM supports shared servers compared to VSEB、PowerVM supports shared processors and memory compared to VSEC、PowerVM supports shared processors, memory and I/O compared to VSED、PowerVM supports DLPAR without a reboot and supports dedicated I/O compared to VSE
考题
During a planning session, it is determined that a three node cluster (Node ’A’, Node ’B’, and Node ’C’) will meet the customer’s application needs. Node ’B’ will be a hot-standby fallover node for both Node ’A’ and Node ’C’ resource groups. A serial network for this cluster will require which connections?() A、 A single serial network between Node ’A’ and Node ’B’ and Node ’C’B、 A point-to-point link between Node ’A’ and Node ’C’,and Node ’B’ and Node ’C’C、 A serial network between Node ’A’ and Node ’C’,and a serial network between Node ’B’ and Node ’C’D、 A point-to-point link between Node ’A’ and Node ’B’ Node ’B’ and Node ’C’ and Node ’A’ ad Node ’C’
考题
Which of the following features of Active Memory perform a regular check and cleanup of the status of DIMMs?()A、Chipkill and Memory ProteXionB、Chipkill and memory mirroringC、Memory ProteXion and memory scrubbingD、Hot spare memory and memory scrubbing
考题
A server has two PCI-X buses with four Active PCI-X slots. Slots 1 and 2 are on the first PCI-X bus (100MHz) and slots 3 and 4 are on the second PCI-X bus (133MHz). The customer requires you to install adapter A and adapter B on day one. After the server has been installed and configured, the server must be running 24 by 7 with no downtime. Three months later, adapter C needs to be hot added. All the adapters are 64-bit and capable of speeds up to 133MHz. The customer’s priority is to have no downtime, and performance is secondary. Based on the information provided, into which slots should adapters A and B be installed in and later into which slot would adapter C be hot-added?()A、Adapter A in slot 1, adapter B in slot 4 and hot-add adapter C in slot 3B、Adapter A in slot 1, adapter B in slot 3 and hot-add adapter C in slot 2C、Adapter A in slot 2, adapter B in slot 4 and hot-add adapter C in slot 3D、Adapter A in slot 3, adapter B in slot 1 and hot-add adapter C in slot 4
考题
单选题A customer is considering procuring HP servers with Virtual Server Environment (VSE) to consolidate servers and dynamically move resources between partitions. How can the technical sales representative position PowerVM as the solution to virtualize this server environment?()A
PowerVM supports shared servers compared to VSEB
PowerVM supports shared processors and memory compared to VSEC
PowerVM supports shared processors, memory and I/O compared to VSED
PowerVM supports DLPAR without a reboot and supports dedicated I/O compared to VSE
考题
单选题A customer would like to have the ability to permanently activate processor and memory resources as their workload increases. Which of the following supports the customer requirement?()A
Reserve Capacity on DemandB
Utility Capacity on DemandC
Capacity Upgrade on DemandD
Uncapped Capacity on Demand
考题
单选题A customer is consolidating seven IBM i partitions onto a POWER7 system, using VIO Server to virtualize resources.Which of the following PowerVM editions is appropriate for this customer?()A
IBM i EditionB
Express EditionC
Standard EditionD
Enterprise Edition
考题
单选题During a planning session, it is determined that a three node cluster (Node ’A’, Node ’B’, and Node ’C’) will meet the customer’s application needs. Node ’B’ will be a hot-standby fallover node for both Node ’A’ and Node ’C’ resource groups. A serial network for this cluster will require which connections?()A
A single serial network between Node ’A’ and Node ’B’ and Node ’C’B
A point-to-point link between Node ’A’ and Node ’C’,and Node ’B’ and Node ’C’C
A serial network between Node ’A’ and Node ’C’,and a serial network between Node ’B’ and Node ’C’D
A point-to-point link between Node ’A’ and Node ’B’ Node ’B’ and Node ’C’ and Node ’A’ ad Node ’C’
考题
单选题A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility. Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()A
PowerVM Standard Edition on POWER6 hardwareB
PowerVM Standard Edition with POWER5 hardware C
PowerVM Enterprise Edition with POWER6 hardwareD
PowerVM Enterprise Edition with POWER5 hardware
考题
单选题A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server. What is the minimum PowerVM edition that supports the customer requirement?()A
PowerVM Lx86B
PowerVM Express EditionC
PowerVM Standard EditionD
PowerVM Enterprise Edition
考题
单选题A customer is evaluating PowerVM and VMware to run a data warehouse application. Which feature of PowerVM should be highlighted as a differentiator?()A
PowerVM offers partition mobility.B
PowerVM can virtualize network and SAN resources.C
PowerVM supports multiple operating systems running concurrently.D
PowerVM allows an LPAR to use activated cores and memory without limitation.
考题
单选题A technician needs to install an additional PCI NIC without powering down the server. Which of the following BEST describes the technology the board must support?()A
Hot installB
Hot addC
Plug and playD
Hot plug
考题
单选题A customer has a requirement to eliminate single points of failure for an application. They have allocated one Ethernet adapter to each VIO server on the system. Which features of PowerVM and AIX will support the customer requirement?()A
Etherchannel and trunkingB
Network Interface Backup and EtherchannelC
Shared Ethernet Adapter (SEA) Failover and EtherchannelD
Network Interface Backup and Shared Ethernet Adapter failover
考题
单选题A customer needs to test the failover capabilities of their cluster. Which of the following AIX commands, whenissued from the command line, will simulate a node crash and cause the cluster resource group running onthat server to fail over to another node?()A
clstopB
halt -qC
shutdown -FD
stopsrc -s cluster
考题
单选题A server has two PCI-X buses with four Active PCI-X slots. Slots 1 and 2 are on the first PCI-X bus (100MHz) and slots 3 and 4 are on the second PCI-X bus (133MHz). The customer requires you to install adapter A and adapter B on day one. After the server has been installed and configured, the server must be running 24 by 7 with no downtime. Three months later, adapter C needs to be hot added. All the adapters are 64-bit and capable of speeds up to 133MHz. The customer’s priority is to have no downtime, and performance is secondary. Based on the information provided, into which slots should adapters A and B be installed in and later into which slot would adapter C be hot-added?()A
Adapter A in slot 1, adapter B in slot 4 and hot-add adapter C in slot 3B
Adapter A in slot 1, adapter B in slot 3 and hot-add adapter C in slot 2C
Adapter A in slot 2, adapter B in slot 4 and hot-add adapter C in slot 3D
Adapter A in slot 3, adapter B in slot 1 and hot-add adapter C in slot 4
考题
单选题Companycom wants to deploy WebSphere in an HACMP environment, running on two servers in LPARs. These servers will also host the test and dev LPARs. The customer would like to use the test and dev resources to support an HACMP failover. What is the best way to accomplish this task?()A
Run the test and dev LPARs in an uncapped modeB
Activate COD resources if a failover should occurC
Use DLPAR to move resources between the test and dev and the HACMP LPARD
Stop the test and dev environments, bring up new profile for HACMP failover
考题
单选题A customer has a resource group rg1 configured on a two node cluster with the following policies:The customer has observed the following scenarios as nodes join the cluster during cluster start up. Scenario 1 Node1 joins cluster as first node - rg1 is acquired by Node1 Node2 joins cluster as second node - rg1 ismoved from Node1 to Node2 Scenario 2 Node2 joins cluster as first node - rg1 is acquired by Node2 Node1 joins cluster as second node - rg1 remainson Node2 Which of the following is the reason for this behavior?()A
rg1 is configured with a delayed fallback timerB
Settling time policy has not been configured for rg1C
Node1 does not have sufficient resources to support rg1D
Node2 is the first in the ’Default Node Priority’ list for resource group rg1
热门标签
最新试卷