89 Cost of quality is:
A. associated with non-conformance to specifications and requirements.
B. primarily caused by poor workmanship of workers who are building or manufacturing the product. C. used to determine whether a quality management program is suitable for a given project. D. negligible for most large projects.
E. A and B
参考答案
更多 “ 89 Cost of quality is:A. associated with non-conformance to specifications and requirements.B. primarily caused by poor workmanship of workers who are building or manufacturing the product. C. used to determine whether a quality management program is suitable for a given project. D. negligible for most large projects.E. A and B ” 相关考题
考题
Project tradeoffs are usually made by comparing _____ and constraints.ATime, cost, and qualityBTime, risk, and qualityCRisk, quality, and manpower availabilityDCost, quality, and technical performanceECost, quality, and risk
考题
List the names and descriptions of the commodities ( ), including quality, specifications, quantity available, price, ways of delivery, etc.
A.inquired forB.inquiring aboutC.inquire afterD.have inquired
考题
3 Project tradeoffs are usually made by comparing _____ and constraints.A. Time, cost, and qualityB. Time, risk, and qualityC. Risk, quality, and manpower availabilityD. Cost, quality, and technical performanceE. Cost, quality, and risk
考题
85 Project tradeoffs are usually made by comparing _____ and constraints.A. Time, cost, and qualityB. Time, risk, and qualityC. Risk, quality, and manpower availabilityD. Cost, quality, and technical performanceE. Cost, quality, and risk
考题
● Project tradeoffs are usually made by comparing _____ and constraints.A Time, cost, and qualityB Time, risk, and qualityC Risk, quality, and manpower availabilityD Cost, quality, and technical performanceE Cost, quality, and risk
考题
● Which of the following can result in misinterpretation of the statement of work?A Using imprecise language (i.e. nearly, approximately)B Mixing tasks, specifications, special instructions and approvalsC No pattern, structure or chronological orderD Wide variation in the size of tasks or details of workE All of the above
考题
The 1973 ABS Steel Vessel Rules,under which the PRESTIGE was built,did not include ______ requirements.A.hull fatigue strengthB.longitudinal strengthC.buckling strengthD.yielding strength
考题
汉译英:“数量;质量”,正确的翻译为( )。
A. quality ; quarantine B. quantity ; quarantine
C. quality ; quantity D. quantity ; quality
考题
To produce accurate results, the equipment must be manufactured to very ________ specifications.A.deep
B.wide
C.key
D.high