在做好项目成本结果概率分布后,有15%可能被超过的估算大约( )一个标准差

A.低于平均数

B.高于中数

C.高于平均数

D.高于中数


参考答案

更多 “ 在做好项目成本结果概率分布后,有15%可能被超过的估算大约( )一个标准差A.低于平均数B.高于中数C.高于平均数D.高于中数 ” 相关考题
考题 You have summarized the project and note that , hours have been scheduled, , hours have been earned and , hours paid. The correct conclusion is:A.The project is operating at a favorable cost efficiency ratio.B.the project is spending more than plannedC.the project is behind scheduleD.the project is ahead of scheduleE.B and C

考题 7 Communication always makes use of.A. symbolsB wordsC. languageD. gesturesE. All of the above

考题 105 A budget estimate should give the manager cost data accurate to within:A. -5 to +10 percent of actual costB. -25 to +75 percent of actual costC. -30 to +75 percent of actual costD. -10 to +25 percent of actual costE. None of the above

考题 186 Risk management requires an understanding that _____ .A. the degree of greatest uncertainty occurs in the Conceptual Phase of the Life Cycle.B. risk identification must be directly aligned with the Work Breakdown Structure.C. it is merely advanced preparation for possible adverse future events.D. it does not imply complete control of eventsE. All of the above

考题 你刚刚知道美国环境保护机构颁布了一项新的有关处理有毒废物的新规定。有毒废物不能再装在船上倒入海里,即便是公海也不例外。你向管理层建设,作为一家受聘于企业处理这类废物的公司,应该着手一个新项目以制定方针来响应新政策。作为项目管理专家,这个建议显示了以下哪一点的重要性?( )A.坚持按法律要求和道德标准行事B.在你的工作中不断寻求新的和更有效的方法C.将法律要求作为选择项目的基础D.项目必须完成的时间范围

考题 下列哪一项可被看作是生产一种产品的直接成本( )A.生产此零件的材料成本B.生产此零件的人工费C.生产此零件的房屋房租D.管理人员费用E.A及B正确

考题 以下哪项不是风险管理过程的输入A、 历史资料B、 经验教训C、 WBSD、 项目状态报告

考题 当卖方违反合同的时候,买方不能接受A、赔偿金B、惩罚性损失赔偿C、规定的违约赔偿金D、间接损失赔偿金

考题 当需要减少20%关键路径时间时,你可以采取下列的行动,但-------除外?A、 增加资源B、 加速时间进度C、 消除浮动时间D、 并行安排活动

考题 以下哪项不属于矩阵组织的缺陷?( )A.项目团队有多个上司B.更容易导致重复工作和冲突C.更难以监控D.更利于进行水平和垂直的信息传播