网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
137 Range estimating in determining cost risk probabilities requires _____ .
A. an amount of financial exposure.
B. risks and opportunities ranked in order of bottom line importance
C. contingency requirements for expected level of confidence
D. probability of cost overrun occurrences
E. All of the above
参考答案
更多 “ 137 Range estimating in determining cost risk probabilities requires _____ .A. an amount of financial exposure.B. risks and opportunities ranked in order of bottom line importanceC. contingency requirements for expected level of confidenceD. probability of cost overrun occurrencesE. All of the above ” 相关考题
考题
Project trade-offs vary betweenA . risk, cost and schedule.B . direct cost, indirect cost, and resource availabilityC . quality, schedule and timeD . cost, quality and scheduleE . contract terms, scope and budget
考题
Project tradeoffs are usually made by comparing _____ and constraints.ATime, cost, and qualityBTime, risk, and qualityCRisk, quality, and manpower availabilityDCost, quality, and technical performanceECost, quality, and risk
考题
3 Project tradeoffs are usually made by comparing _____ and constraints.A. Time, cost, and qualityB. Time, risk, and qualityC. Risk, quality, and manpower availabilityD. Cost, quality, and technical performanceE. Cost, quality, and risk
考题
72 Project trade-offs vary betweenA. risk, cost and schedule.B. direct cost, indirect cost, and resource availabilityC. quality, schedule and timeD. cost, quality and scheduleE. contract terms, scope and budget
考题
85 Project tradeoffs are usually made by comparing _____ and constraints.A. Time, cost, and qualityB. Time, risk, and qualityC. Risk, quality, and manpower availabilityD. Cost, quality, and technical performanceE. Cost, quality, and risk
考题
154 Project trade-offs vary betweenA. risk, cost and schedule.B. direct cost, indirect cost, and resource availabilityC. quality, schedule and timeD. cost, quality and scheduleE. contract terms, scope and budget
考题
● Project tradeoffs are usually made by comparing _____ and constraints.A Time, cost, and qualityB Time, risk, and qualityC Risk, quality, and manpower availabilityD Cost, quality, and technical performanceE Cost, quality, and risk
考题
Many new ____ will be opened up at sea in the future for those with a university education.A.opportunitiesB.realitiesC.necessitiesD.Probabilities
热门标签
最新试卷