53 The Quality Risk _____ .

A. is minimized through continuous monitoring.

B. is considered a long term risk.

C. will be reflected in the in-service life of the project result.

D. B and C

E. All of the above


参考答案

更多 “ 53 The Quality Risk _____ .A. is minimized through continuous monitoring.B. is considered a long term risk.C. will be reflected in the in-service life of the project result.D. B and CE. All of the above ” 相关考题
考题 Project trade-offs vary betweenA . risk, cost and schedule.B . direct cost, indirect cost, and resource availabilityC . quality, schedule and timeD . cost, quality and scheduleE . contract terms, scope and budget

考题 Project tradeoffs are usually made by comparing _____ and constraints.ATime, cost, and qualityBTime, risk, and qualityCRisk, quality, and manpower availabilityDCost, quality, and technical performanceECost, quality, and risk

考题 3 Project tradeoffs are usually made by comparing _____ and constraints.A. Time, cost, and qualityB. Time, risk, and qualityC. Risk, quality, and manpower availabilityD. Cost, quality, and technical performanceE. Cost, quality, and risk

考题 72 Project trade-offs vary betweenA. risk, cost and schedule.B. direct cost, indirect cost, and resource availabilityC. quality, schedule and timeD. cost, quality and scheduleE. contract terms, scope and budget

考题 85 Project tradeoffs are usually made by comparing _____ and constraints.A. Time, cost, and qualityB. Time, risk, and qualityC. Risk, quality, and manpower availabilityD. Cost, quality, and technical performanceE. Cost, quality, and risk

考题 154 Project trade-offs vary betweenA. risk, cost and schedule.B. direct cost, indirect cost, and resource availabilityC. quality, schedule and timeD. cost, quality and scheduleE. contract terms, scope and budget

考题 ● Project tradeoffs are usually made by comparing _____ and constraints.A Time, cost, and qualityB Time, risk, and qualityC Risk, quality, and manpower availabilityD Cost, quality, and technical performanceE Cost, quality, and risk

考题 A.IS=1A,R=2Ω B.IS=1A,R=1Ω C.IS=2A,R=1Ω D.IS=2A,R=2Ω

考题 储蓄增加将导致()A.IS曲线向右移动B.IS曲线向左移动C.LM曲线向右移动D.LM曲线向左移动

考题 降低存款准备金率,()曲线,向()移动A.IS曲线,左B.IS曲线,右C.LM曲线,左D.LM曲线,右