网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
A check line is ______.
A.A safety line attached to a man working over the side
B.Used to measure water depth
C.Used to slow the headway of a barge
D.Used to measure the overhead height of a bridge
参考答案
更多 “ A check line is ______.A.A safety line attached to a man working over the sideB.Used to measure water depthC.Used to slow the headway of a bargeD.Used to measure the overhead height of a bridge ” 相关考题
考题
What are two way sthat IP datagrams are passed from the ingress line module to the egress line module?()
A.over an ATM PVCB.over a FastEthernet busC.overa Gigabit Ethernet busD.over high speed serial bus
考题
What kind of cable should be used to establish a trunked line between two Catalyst switches?A.A straight-through cableB.An EIA/TIA-232 serial cableC.An auxiliary cableD.A modem cableE.A cross-over cable
考题
Mooring winch should be equipped with mechanical brakes which are capable of holding ______.A.half the breaking strength of the mooring lineB.the full breaking strength of the mooring lineC.the maximum expected tension of the mooring lineD.50% over the working tension of the mooring line
考题
A mooring line leading 45° to the keel,used to check forward or astern movement of a vessel,is called a ______.A.spring lineB.warp lineC.bow lineD.breast line
考题
A life preserver or buoyant work vest is required to be worn on a ship when a person is ______.A.working on the rig floorB.working over waterC.working on the pipe racksD.operating line throwing equipment
考题
To determine the number of able seamen required on an inspected vessel,you should check the ______.A.Load Line CertificateB.operations manualC.Safety of Life at Sea CertificateD.Certificate of Inspection
考题
To determine the number of certificated lifeboatmen required on a vessel,you should check the ______.A.Load Line CertificateB.Certificate of InspectionC.Safety of Life at Sea CertificateD.operations manual
考题
To determine the number of Able Seamen required on a mobile offshore drilling unit,you should check the ______.A.load line certificateB.Operations ManualC.Safety of Life at Sea CertificateD.Certificate of Inspection
考题
Which statement is TRUE about the use of a“gob rope”________.A.The gob rope is a mooring line for tying up lighters for working cargo alongside a vessel anchored in an open roadsteadB.The gob rope is used to secure the towline aft over the centerline of a tugC.The gob rope is a line hung over a vessel's side to assist in boardingD.The gob rope is a rope used in mooring a vessel to a buoy
考题
Where do fatigue failures of wire rope mooring lines usually occur ________.A.In the middle part of the line lengthB.Near the socketed end fitting adjacent to the anchorC.At the point where the line touches the bottomD.At the place the anchor buoy is attached to the line
考题
A line of position is ______.A.a line connecting two charted objectsB.a line on some point of which the vessel may be presumed to be locatedC.the position of your vesselD.not used in a running fix
考题
An isotherm is ______.A.a line on a weather map connecting equal points of both temperature and pressureB.an instrument that measures the climatological effects of temperatureC.a line connecting points of equal barometric pressure on a weather mapD.a line connecting points of equal temperature on a weather map
考题
Mooring lines should be turned end-for-end occasionally. This is because ______.A.a line is weakened by constantly pulling on it in one directionB.normal wear on the line is thus distributed to different areasC.it prevents the line from kinking or unlayingD.it prevents permanent misalignment of the line’s internal strands
考题
What are two way sthat IP datagrams are passed from the ingress line module to the egress line module?()A、over an ATM PVCB、over a FastEthernet busC、overa Gigabit Ethernet busD、over high speed serial bus
考题
If there is another line already on the bollard ,the eye of the second line should be()before placing it over the bollard.A、taken up through the eye of the first lineB、taken up over the eye of the first lineC、made fast to the first lineD、taken up from the eye of the first line
考题
单选题A mooring line leading 45°to the keel,used to check forward or astern movement of a vessel,is called a().A
spring lineB
warp lineC
bow lineD
breast line
考题
单选题Besides saving distance along the track line,another advantage of the Scharnow Turn over the Williamson Turn in a man overboard situation because().A
it is fasterB
it can be used in both the immediate action and the delayed action situationsC
in fog,if the turn is started as soon as the man goes over,the vessel will be at the point where he went over when the turn is completedD
it returns the vessel to the original track line on a reciprocal course
考题
单选题You are handling a mooring line and are instructed to Check the line.What should you do().A
Ensure the bight is not fouled by taking up slackB
Pay out the line smartly and keep it free for runningC
Secure the line by adding more turnsD
Surge the line so it maintains a strain without parting
考题
单选题In Passage 2, the word check (line 60) most nearly means ______.A
validateB
constrainC
directD
encourageE
compete
考题
单选题Which statement is TRUE about nylon line?()A
Manila line will usually last longer than nylon lineB
Nylon line is excellent for use in alongside towingC
A normal safe working load will stretch nylon line 50%D
Nylon stoppers should be used with nylon line
考题
单选题A “check” line is().A
a safety line attached to a man working over the sideB
used to measure water depthC
used to slow the headway of a bargeD
used to measure the overhead height of a bridge
考题
单选题Electric cargo winches have an overload safety device which normally cuts the current to the winch motor().A
after torque causes line pull to exceed the rated capacity of the winchB
before the line pull reaches the rated capacity of the winchC
when the line pull reaches the breaking strength of the fallD
before the safe working load of the fall is reached
考题
单选题An anchor winch should be equipped with mechanical brakes capable of holding().A
half the breaking strength of the mooring lineB
the full breaking strength of the mooring lineC
the maximum expected tension of the mooring lineD
50% over the working tension of the mooring line
考题
单选题Safety valves on a boiler vent to the ().A
fuel tankB
bilgeC
atmosphereD
auxiliary exhaust line
考题
单选题Which is the winter load waterline on the load waterline mark?().A
The line over the summer load waterlineB
The line above the tropical load waterlineC
The line below the tropical load waterlineD
The line between the summer and the winter north Atlantic load waterline
考题
单选题How are lifelines attached to a life float?()A
By servingB
By splicing one end of the line around the apparatusC
Securely attached around the outside in bights no longer than three feetD
With an approved safety hook or shackle
热门标签
最新试卷