网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

The most accurate account of cargo on board will be found in the ______.

A.Manifest

B.charter party

C.Bill of Lading

D.Portage Bill


参考答案

更多 “ The most accurate account of cargo on board will be found in the ______.A.ManifestB.charter partyC.Bill of LadingD.Portage Bill ” 相关考题
考题 Preparations for loading cargo on board ship.

考题 what do you think is the most important thing on board?

考题 The derrick to be laid down on deck,cargo blocks,span tackles,guide rollers and all moving parts of derrick to be dismantled,cleaned and greased with special grease.This sentence is most possibly found in ________.A.Chief Mate's remark on stowage planB.Store list made by Chief EngineerC.Collision Report made by MasterD.Repair List

考题 Which of the following element(s) should be taken into account in the preparation of the "Cargo Securing Manual"?A.Duration of the voyageB.Types of cargo units and vehicles to be carriedC.Weight of cargo units and vehiclesD.All of the above

考题 In Cargo Survey,O.B.Q.refers to ______.A.own bank quoteB.on board qualityC.on-delivery bank quoteD.on board quantity

考题 The colored hazardous cargo labels are usually found in ______.A.Center of BalanceB.Hazardous Material MarkingsC.Cargo address markingsD.Precautionary and Special Handling Instructions

考题 A person may operate an air compressor in which of the following areas on board a tank barge ________.A.PumproomB.Generator roomC.A space adjacent to a cargo tankD.A space two meters from a cargo valve

考题 I’m on fire and have dangerous cargo on board. The most emergent assistance in this case would be______.A.MedicineB.life boatC.helicopterD.firefighting

考题 Choose the most accurate statement regarding the account qualification and planning service component in the prepare phase.()A、 providing a partner with information regarding customer acceptance of a new solutionB、 providing information regarding current network infrastructure readinessC、 using stakeholder interviews to identify stakeholders and decision-makers high-level solutionrequirements timelines and the scope of an opportunityD、 adjusting a solution to account for a customer’s physical site characteristics

考题 The most modern type of dry cargo carrier is().A、multi-purpose shipB、the container shipC、bulk carrierD、general cargo ship

考题 The container ship is the ()type of dry cargo carrier.A、importantB、most modernC、most commonD、traditional

考题 单选题An amplitude of the Sun in high latitudes().A is most accurate before sunriseB is most accurate after sunsetC should only be observed when the Sun's lower limb is above the horizonD is most accurate when the Sun's center is observed on the visible horizon

考题 单选题We have two kinds of cargo on board,but()is dangerous.A eitherB neitherC noneD no

考题 单选题The most accurate account of cargo on board will be found in the().A manifestB charter partyC bill of ladingD portage bill

考题 单选题Radar makes the most accurate determination of the().A direction of a targetB distance to a targetC size of a targetD shape of a target

考题 单选题The foreman said three ()would come on board to load cargo.A teamsB partiesC gangsD pairs

考题 单选题An offshore drilling unit is required to carry on board an operations manual approved by the ().A Coast GuardB National Cargo BureauC Minerals Management ServiceD builder

考题 单选题Making cargo plan for appropriate distribution of the cargo on board is()duty.A a ship's officer'sB a Tallyman'sC a port planner'sD a foreman's

考题 单选题Choose the most accurate statement regarding the account qualification and planning service component in the prepare phase. Select exactly 1 answer(s) from the following:()。A providing a partner with information regarding customer acceptance of a new SolutionB providing information regarding current network infrastructure readinessC using stakeholder interviews to identify stakeholders and decision-makers, high-level solution requirements, timelines, and the scope of an opportunityD adjusting a solution to account for a customers physical site characteristics

考题 单选题()means a plan developed to ensure the application of measures on board the ship designed to protect persons on board, cargo, cargo transport units, ship’s stores or the ship from the risks of a security incident.A Ship security planB Company security planC Port facility security planD National security plan

考题 单选题Which of the following element(s) should be taken into account in the preparation of the “Cargo Securing Manual”? ()A Duration of the voyageB Types of cargo units and vehicles to be carriedC Weight of cargo units and vehiclesD All of the above

考题 单选题The additional cargo is to be loaded()board our ship.A onB inC fromD to

考题 单选题Choose the most accurate statement regarding the account qualification and planning service component in the prepare phase.()A  providing a partner with information regarding customer acceptance of a new solutionB  providing information regarding current network infrastructure readinessC  using stakeholder interviews to identify stakeholders and decision-makers high-level solutionrequirements timelines and the scope of an opportunityD  adjusting a solution to account for a customer’s physical site characteristics

考题 单选题The Bill of Lading is described as()if the shipowners agree that the cargo were received on board in good condition.A cleanB dirtyC foulD claused

考题 单选题The most modern ship is()(集装箱船).A dry cargo shipB container shipC liquid cargo shipD refrigerated ship

考题 单选题I’m on fire and have dangerous cargo on board. The most urgent assistance (最紧急的援助)in this case would be() .A lifeboatB medicineC firefightingD lifesaving

考题 单选题A person may operate an air compressor in which of the following areas on board a tank barge?()A PumproomB Generator roomC A space adjacent to a cargo tankD A space two meters from a cargo valve