网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

A set of clamps that are latched onto the drill pipe to allow the driller to raise or lower the drill string out of or into the hole are the ______.

A.lifts

B.collars

C.elevators

D.clamps


参考答案

更多 “ A set of clamps that are latched onto the drill pipe to allow the driller to raise or lower the drill string out of or into the hole are the ______.A.liftsB.collarsC.elevatorsD.clamps ” 相关考题
考题 ______ is a set of specifications and software that allow small programs or software components to work together.A.ActiveXB.XMLC.HTMLD.DBMS

考题 ActiveX is a set of specifications and software that allow small programs or software components to(72).A.work togetherB.work aloneC.simplifyD.reuse

考题 Which of the following will allow a technician to extend a partition?() A. Set the drive up as basicB. Format the drive to FAT32C. Install a second hard driveD. Set the drive as dynamic

考题 Which of the following protocols allow the set up, teardown and streaming of VoIP traffic? ()(SelectTWO) A.NTPB.VNCC.RTPD.SIPE.TLS

考题 In order to allow the establishment of a Telnet session with a router, which set of commands must be configured()。 A.AB.BC.CD.DE.EF.F

考题 A heavy,thick-walled tube,usually steel,used between the drill pipe and the bit in the drill stem to weight the bit in order to improve its performance is called a ______.A.heavy-walled drill pipeB.tool jointC.down hole toolD.drill collar

考题 As oil pipe line connections were broken, _____ quantity of oil was caused to spill onto the wharf and into the dock water.A.a not knowingB.an unknowingC.an unknownD.a not know

考题 ()are usually stowed both above and below deck.A、ContainersB、TrucksC、MachineryD、Clamps

考题 ()(除了) the fire drill, there are also boat drill and emergency drill on board.A、ExceptB、AlthoughC、In addition toD、But

考题 Which of the following protocols allow the set up, teardown and streaming of VoIP traffic? ()(SelectTWO)A、NTPB、VNCC、RTPD、SIPE、TLS

考题 Which of the following will allow a technician to extend a partition?()A、Set the drive up as basicB、Format the drive to FAT32C、Install a second hard driveD、Set the drive as dynamic

考题 You are creating a SQL Tuning Set to allow a group of SQL statements to be passed into the SQL Tuning Advisor. Which packages will you use to create the SQL Tuning Set?()A、 DBMS_WORKLOAD_REPOSITORYB、 DBMS_RESOURCE_MANAGERC、 DBMS_SQLTUNED、 DBMS_ADVISOR

考题 Your company has two Active Directory forests named Forest1 and Forest2. The forest functional level and the domain functional level of Forest1 are set to Windows Server 2008. The forest functional levle of Forest2 is set to WIndows 2000, and the domain functional levels in Forest2 are set to Windows Server 2003. You need to set up a transitive forest trust between Frorest1 and Forest2. What should you do first()A、Raise the forest functional level of Forest2 to Windows Server 2003 Interim mode.B、Raise the forest functional level of Forest2 to Windows Server 2003.C、Upgrade the domain controllers in Forest2 to Windows Server 2008.D、Upgrade the domain controllers in Forest2 to Windows Server 2003.

考题 单选题The main function of the drawworks on a ship is to().A transport tubulars from the pipe racks to the derrick floorB maintain constant tension on the marine riserC store and secure the excess drill lineD lower and hoist the drill string into and out of the drilled hole

考题 单选题In securing deck loads for an ocean tow,drill pipe should be().A galvanized to protect against corrosionB held in place with heavy materials such as spare pendant wireC limited to no more than five courses highD provided with bulwarks at both ends of their bays

考题 单选题A heavy,thick-walled tube,usually steel,used between the drill pipe and the bit in the drill stem to weight the bit in order to improve its performance is called a().A heavy-walled drill pipeB tool jointC down hole toolD drill collar

考题 单选题Your company has a single Active Directory directory service forest named contoso.com. A partner organization has a forest named fabrikam.com. Both forests are set to the Windows 2000 forest functional  level. Domains named contoso.com and fabrikam.com are set to Windows 2000 Native Mode. You plan to create a forest trust relationship between contoso.com and fabrikam.com. You need to be able to configure selective authentication for the trust relationship. What should you do?()A  Raise the forest functional level on contoso.com and fabrikam.com to Windows Server 2003.B  Raise the domain functional level on contoso.com and fabrikam.com to Windows Server 2003.C  Raise the domain functional level and the forest functional level on contoso.com to Windows Server 2003.D  Raise the domain functional level and the forest functional level on fabrikam.com to Windows Server 2003.

考题 单选题The tool used in precision work to smooth or enlarge a slightly undersized hole, is called()A round outB round fileC reamerD hole driller

考题 单选题() unit is mounted so as to raise and lower the cable from the spurling pipe, which is at the top and center of the chain or cable locker.A The cable lifterB The hoisting motorC The topping wireD The life-raft

考题 单选题Increased air () will raise scavenge efficiency and allow a greater mass of air to be compressed; more fuel may now be burned giving an increased power.A specific volumeB densityC viscosityD calorific value

考题 多选题Which of the following will allow Karen, a technician, to determine if the correct voltages are reaching the computer components? (Select TWO).()APower supply testerBCable testerCLoopback plugsDMultimeterEButt set

考题 单选题As oil pipe line connections were broken,()quantity of oil was caused to spill onto the wharf and into the dock water.A a not knowingB an unknowingC an unknownD a not known

考题 单选题A set of clamps that are latched onto the drill pipe to allow the driller to raise or lower the drill string out of or into the hole are the().A liftsB collarsC elevatorsD clamps

考题 单选题The shear rams of a ship blowout preventer stack are used in emergency well control to().A close and seal around the drill pipeB close and seal around casingC cut off pipe inside the preventer stackD close and seal around drill collars

考题 单选题()(除了) the fire drill, there are also boat drill and emergency drill on board.A ExceptB AlthoughC In addition toD But

考题 单选题An integral part of a blowout preventer that serves as the closing element on an open hole,and whose ends do not fit around the drill pipe but seal against each other and shut off the space below completely is the().A shear ramB blind ramC pipe ramD annular ram

考题 单选题In order to prevent stress from being set up in the metal, expansion joints are fitted which _____ the stress by allowing the pipe to expand or contract freely.A reclaimB reconcileC rectifyD relieve