网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
In ship construction, keel scantlings should be the greatest ______.
A.at each frame
B.amidships
C.one-third the distance from the bow
D.one-third the distance from the stern
参考答案
更多 “ In ship construction, keel scantlings should be the greatest ______.A.at each frameB.amidshipsC.one-third the distance from the bowD.one-third the distance from the stern ” 相关考题
考题
The construction of the new building will cost () 1,000,000 dollars, and it’s not easy to get so much money.
A.at lastB.at mostC.at leastD.at large
考题
A survival craft being used to pick up a person who has fallen overboard from a ship should approach the person ______.A.at a high rate of speedB.under oarsC.against the windD.with the wind
考题
The Company should ensure that the Safety and Environmental Protection policy is implemented and maintained ______.A.at the level of ship based organizationB.at the level of shore based organizationC.at all levels of the organization both ship based as well as shore basedD.at highest level of the organization
考题
The strake on each side of the keel is called a ______.A.Sheer strakeB.Gatewood strakeC.Insulation strakeD.Garboard strake
考题
水手应该知道船上吊杆的安全工作负荷。()A、Sailors should know the SWL of cranes on board their ship.B、Sailors should know the SWL of derricks on board their ship.C、Officers should know the SWL of derricks on board their ship.D、Officers should know the SWL of cranes on board their ship.
考题
()(富余水深) is the depth remaining under a ship’s bottom.A、Under-keel heightB、Under-keel clearanceC、Under-keel draftD、Under-keel depth
考题
从水线到船底是“吃水”。()A、“From the centerline to the ship’s bottom” is “draft”.B、“From the keel to the ship’s bottom” is “draft”.C、The maximum distance from the waterline to the ship’s bottom is “draft”.D、“From the centerline to the ship’s main deck” is “draft”.
考题
单选题The two courses of action if the underwater hull of a ship is severely damaged are to plug the openings and to().A
dewater the compartmentB
establish and maintain flooding boundariesC
secure power to the compartmentD
counter flood to maintain even keel
考题
单选题The construction portfolio may be included as part of the ship().A
general plansB
operating manualC
builders documentationD
CCS file
考题
单选题In ship construction,keel scantlings should be the greatest().A
at each frameB
amidshipsC
one-third the distance from the bowD
one-third the distance from the stern
考题
单选题Aboard ship,vertical flat plates running transversely and connecting the vertical keel to the margin plates are called().A
floorsB
intercostalsC
girdersD
stringers
考题
单选题The shearing stresses on a ship’s structure are usually greatest at().A
the bowB
the sternC
midshipsD
the ship's quarter-length points
考题
单选题In ship construction,bulkheads in the quarters are generally().A
structuralB
watertightC
non-structuralD
continuous
考题
单选题The term SEAWORTHY TRIM means()the ship must be in trim to meet the perils of the passage by sea to the next port not only in the sense that she should be left with an adequate amount of cargo to keep her on an even keel,but also that where necessary part of her cargo should be bagged to stop it shifting while out at sea.A
itB
thatC
whereD
while
考题
单选题The value of GM still remains one meter, meanwhile we can pump the ballast water to() the ship on even keel.A
makeB
putC
keepD
get
考题
单选题Lifeboat hatchets should be().A
kept in a lockerB
secured at each end of the boat with a lanyardC
kept next to the boat coxswainD
kept in the emergency locker on the ship and brought to the lifeboat when needed
考题
单选题The strake on each side of the keel is called a().A
Sheer strakeB
Gatewood strakeC
Insulation strakeD
Garboard strake
考题
单选题The height of the metacenter above the keel will vary depending on the().A
draft and beam of the shipB
displacement and deadweight of the shipC
buoyancy and trim of the shipD
tonnage and deadweight of the ship
考题
单选题The ARQ mode should be applied().A
when two stations communicate with each otherB
in any radio system and at any timeC
when one ship sends a message to another stationD
for communication among some stations
考题
单选题从水线到船底是“吃水”。()A
“From the centerline to the ship’s bottom” is “draft”.B
“From the keel to the ship’s bottom” is “draft”.C
The maximum distance from the waterline to the ship’s bottom is “draft”.D
“From the centerline to the ship’s main deck” is “draft”.
考题
单选题To ensure the safe operation of each ship and to provide a link between the Company and those on board, every Company, as appropriate, should designate a person or persons ashore having direct () to the highest level of management.A
spaceB
distanceC
visibilityD
access
考题
单选题A simplified construction plan may be included in the ship construction portfolio provided it adequately defines the().A
areas where special materials are usedB
hazardous areasC
location of emergency repair equipmentD
type and strength of materials used
考题
单选题To center a compass bowl in its binnacle,you should have the ship on an even keel,heading north or south,and adjust the screws until().A
the compass heading is in line with the lubber's lineB
there is no lost motion in the gimbal ringsC
no change of heading by compass is observed if you raise and lower the heeling magnetD
the gimbal rings do not strike the compass frame when they are tilted
考题
单选题Keel scantlings of any vessel are greatest amidships because().A
connections between forebody and afterbody are most crucialB
of maximum longitudinal bending momentsC
of severest racking stressesD
resistance to grounding is at a maximum amidships
考题
单选题The purpose of sheer in ship construction is to().A
allow the ship to ride waves with drier decksB
eliminate the need for butt strapsC
eliminate the need for margin platesD
give greater strength at the deck edge
考题
单选题()(富余水深) is the depth remaining under a ship’s bottom.A
Under-keel heightB
Under-keel clearanceC
Under-keel draftD
Under-keel depth
热门标签
最新试卷