网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

In ship construction, keel scantlings should be the greatest ______.

A.at each frame

B.amidships

C.one-third the distance from the bow

D.one-third the distance from the stern


参考答案

更多 “ In ship construction, keel scantlings should be the greatest ______.A.at each frameB.amidshipsC.one-third the distance from the bowD.one-third the distance from the stern ” 相关考题
考题 The construction of the new building will cost () 1,000,000 dollars, and it’s not easy to get so much money. A.at lastB.at mostC.at leastD.at large

考题 A survival craft being used to pick up a person who has fallen overboard from a ship should approach the person ______.A.at a high rate of speedB.under oarsC.against the windD.with the wind

考题 The Company should ensure that the Safety and Environmental Protection policy is implemented and maintained ______.A.at the level of ship based organizationB.at the level of shore based organizationC.at all levels of the organization both ship based as well as shore basedD.at highest level of the organization

考题 The strake on each side of the keel is called a ______.A.Sheer strakeB.Gatewood strakeC.Insulation strakeD.Garboard strake

考题 水手应该知道船上吊杆的安全工作负荷。()A、Sailors should know the SWL of cranes on board their ship.B、Sailors should know the SWL of derricks on board their ship.C、Officers should know the SWL of derricks on board their ship.D、Officers should know the SWL of cranes on board their ship.

考题 ()(富余水深) is the depth remaining under a ship’s bottom.A、Under-keel heightB、Under-keel clearanceC、Under-keel draftD、Under-keel depth

考题 从水线到船底是“吃水”。()A、“From the centerline to the ship’s bottom” is “draft”.B、“From the keel to the ship’s bottom” is “draft”.C、The maximum distance from the waterline to the ship’s bottom is “draft”.D、“From the centerline to the ship’s main deck” is “draft”.

考题 单选题The two courses of action if the underwater hull of a ship is severely damaged are to plug the openings and to().A dewater the compartmentB establish and maintain flooding boundariesC secure power to the compartmentD counter flood to maintain even keel

考题 单选题The construction portfolio may be included as part of the ship().A general plansB operating manualC builders documentationD CCS file

考题 单选题In ship construction,keel scantlings should be the greatest().A at each frameB amidshipsC one-third the distance from the bowD one-third the distance from the stern

考题 单选题Aboard ship,vertical flat plates running transversely and connecting the vertical keel to the margin plates are called().A floorsB intercostalsC girdersD stringers

考题 单选题The shearing stresses on a ship’s structure are usually greatest at().A the bowB the sternC midshipsD the ship's quarter-length points

考题 单选题In ship construction,bulkheads in the quarters are generally().A structuralB watertightC non-structuralD continuous

考题 单选题The term SEAWORTHY TRIM means()the ship must be in trim to meet the perils of the passage by sea to the next port not only in the sense that she should be left with an adequate amount of cargo to keep her on an even keel,but also that where necessary part of her cargo should be bagged to stop it shifting while out at sea.A itB thatC whereD while

考题 单选题The value of GM still remains one meter, meanwhile we can pump the ballast water to() the ship on even keel.A makeB putC keepD get

考题 单选题Lifeboat hatchets should be().A kept in a lockerB secured at each end of the boat with a lanyardC kept next to the boat coxswainD kept in the emergency locker on the ship and brought to the lifeboat when needed

考题 单选题My ship is now()even keel.A atB inC onD above

考题 单选题The strake on each side of the keel is called a().A Sheer strakeB Gatewood strakeC Insulation strakeD Garboard strake

考题 单选题The height of the metacenter above the keel will vary depending on the().A draft and beam of the shipB displacement and deadweight of the shipC buoyancy and trim of the shipD tonnage and deadweight of the ship

考题 单选题The ARQ mode should be applied().A when two stations communicate with each otherB in any radio system and at any timeC when one ship sends a message to another stationD for communication among some stations

考题 单选题从水线到船底是“吃水”。()A “From the centerline to the ship’s bottom” is “draft”.B “From the keel to the ship’s bottom” is “draft”.C The maximum distance from the waterline to the ship’s bottom is “draft”.D “From the centerline to the ship’s main deck” is “draft”.

考题 单选题To ensure the safe operation of each ship and to provide a link between the Company and those on board, every Company, as appropriate, should designate a person or persons ashore having direct () to the highest level of management.A spaceB distanceC visibilityD access

考题 单选题A simplified construction plan may be included in the ship construction portfolio provided it adequately defines the().A areas where special materials are usedB hazardous areasC location of emergency repair equipmentD type and strength of materials used

考题 单选题To center a compass bowl in its binnacle,you should have the ship on an even keel,heading north or south,and adjust the screws until().A the compass heading is in line with the lubber's lineB there is no lost motion in the gimbal ringsC no change of heading by compass is observed if you raise and lower the heeling magnetD the gimbal rings do not strike the compass frame when they are tilted

考题 单选题Keel scantlings of any vessel are greatest amidships because().A connections between forebody and afterbody are most crucialB of maximum longitudinal bending momentsC of severest racking stressesD resistance to grounding is at a maximum amidships

考题 单选题The purpose of sheer in ship construction is to().A allow the ship to ride waves with drier decksB eliminate the need for butt strapsC eliminate the need for margin platesD give greater strength at the deck edge

考题 单选题()(富余水深) is the depth remaining under a ship’s bottom.A Under-keel heightB Under-keel clearanceC Under-keel draftD Under-keel depth