网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
The purpose of sheer in ship construction is to().
A

allow the ship to ride waves with drier decks

B

eliminate the need for butt straps

C

eliminate the need for margin plates

D

give greater strength at the deck edge


参考答案

参考解析
解析: 暂无解析
更多 “单选题The purpose of sheer in ship construction is to().A allow the ship to ride waves with drier decksB eliminate the need for butt strapsC eliminate the need for margin platesD give greater strength at the deck edge” 相关考题
考题 Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in ______.A.INTERNATIONAL LOADLINE CERTIFICATEB.PASSENGER SHIP SAFETY CERTIFICATEC.CARGO SHIP SAFETY CONSTRUCTION CERTIFICATED.GENERAL DECLARATION

考题 ______ is issued under the provision of International Convention for the Prevention of Pollution from Ships,1973,as modified by the Protocol of 1978 relating thereto.A.INTERNATIONAL OIL POLLUTION PREVENTION CERTIFICATEB.CARGO SHIP SAFETY CONSTRUCTION CERTIFICATEC.CARGO SHIP SAFETY EQUIPMENT CERTIFICATED.CARGO SHIP SAFETY RADIOTELEPHONY CERTIFICATE

考题 A claim for cargo damages may be held against the shipowner if such damage is the result of failure of the ship's officers to ______.A.ensure the fitness and safety of cargo spacesB.ensure adequate packaging of the cargoC.prevent delays due to quarantine restrictionsD.correct all defects in the ship's construction

考题 What is the period of validity of the SOLAS required Cargo Ship Safety Construction Certificate?A.12 monthsB.24 monthsC.48 monthsD.60 months

考题 A ship under construction or major repair will acquire permanent magnetism due to ______ while sitting stationary in the earth's magnetic field.A.hammering and jarringB.vibration and poundingC.varying magnetic fieldsD.stable or permanent magnetism of the ship

考题 The most modern type of dry cargo carrier is().A、multi-purpose shipB、the container shipC、bulk carrierD、general cargo ship

考题 Multi-purpose ship carries().A、not only general cargoB、but also bulk cargoC、A+ BD、Neither A nor B

考题 单选题What is the period of validity of the SOLAS required Cargo Ship Safety Construction Certificate? ()A 12 monthsB 24 monthsC 48 monthsD 60 months

考题 单选题The construction portfolio may be included as part of the ship().A general plansB operating manualC builders documentationD CCS file

考题 单选题The most modern type of dry cargo carrier is().A multi-purpose shipB the container shipC bulk carrierD general cargo ship

考题 单选题Multi-purpose ship carries().A not only general cargoB but also bulk cargoC A+ BD Neither A nor B

考题 单选题What is the purpose of Mr. Patil’s email?A To thank the newspaper for its coverageB To request that information be correctedC To introduce his company to the newspaperD To question the safety of a construction project

考题 单选题In ship construction,bulkheads in the quarters are generally().A structuralB watertightC non-structuralD continuous

考题 单选题The purpose of lookout is to prove the ()(安全) of a ship.A sternB safetyC sawD spanner

考题 单选题Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in().A INTERNATIONAL LOAD LINE CERTIFICATEB PASSENGER SHIP SAFETY CERTIFICATEC CARGO SHIP SAFETY CONSTRUCTION CERTIFICATED GENERAL DECLARATION

考题 单选题What is the purpose of the memo?A To communicate a change in meeting arrangementsB To request the relocation of a company eventC To discuss the details of some construction workD To notify a manager of an upcoming staff reduction

考题 单选题()is a roud-shaped underwater part in the front of the ship.The purpose is to cre-ate less friction with water so that the ship moves more easily.A The bulbous bowB The anchorC The bow thrusterD The propeller

考题 单选题()is issued under the provision of International Convention for the Prevention of Pollution from Ships,1973,as modified by the Protocol of 1978 relating thereto.A INTERNATIONAL OIL POLLUTION PREVENTION CERTIFICATEB CARGO SHIP SAFETY CONSTRUCTION CERTIFICATEC CARGO SHIP SAFETY EQUIPMENT CERTIFICATED CARGO SHIP SAFETY RADIOTELEPHONY CERTIFICATE

考题 单选题The bulk carrier, general cargo ship, reefer ship and lumber carrier are all ().A liquid cargo shipsB multi-purpose shipsC dry cargo shipsD container ships

考题 单选题散货船()A general cargo shipB container shipC bulk carrierD multi-purpose ship

考题 单选题A ship under construction or major repair will acquire permanent magnetism due to()while sitting stationary in the earth’s magnetic field.A hammering and jarringB vibration and poundingC varying magnetic fieldsD stable or permanent magnetism of the ship

考题 单选题A claim for cargo damages may be held against the shipowner if such damage is the result of failure of the ship’s officers to().A ensure the fitness and safety of cargo spacesB ensure adequate packaging of the cargoC prevent delays due to quarantine restrictionsD correct all defects in the ship's construction

考题 单选题The main purpose of port State control is not to()A prevent an unsafe ship proceeding to seaB prevent a ship threatening the marine environmentC fine the shipsD confirm a safe sailing

考题 单选题The line-throwing appliance provided on board ship is().A for the saving of lifeB for fire-fightingC for mooring purposeD for towing purpose

考题 单选题A simplified construction plan may be included in the ship construction portfolio provided it adequately defines the().A areas where special materials are usedB hazardous areasC location of emergency repair equipmentD type and strength of materials used

考题 单选题The purpose of PSC is ()A to check and inspect foreign shipsB to verify the condition of a ship in compliance with requirements of international conventionsC to fine shipsD to detain ships

考题 单选题Where is thicker plating usually found in the construction of integral tanks on a ship? ()A On the outside of the tankB At the bottom of the tankC At the top of the tankD At the center of the tank