网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

A new switch is installed in the Testking network. This switch is to be configured sothat VLAN information will be automatically distributed to all the other Cisco Catalyst switches in the network.Which of the conditions below have to be met in order for this to occur?()

A. The switch that will share the VLAN information must be in the VTP Server mode.

B. The switches must be in the same VTP domain.

C. The switch that will share the VLAN information must be configured as the root bridge.

D. The switches must be configured to use the same VTP version.

E. The switches must be configured to use the same STP version.

F. The switches must be configured to use the same type of ID tagging.

G. The switches must be connected over VLAN trunks.


参考答案

更多 “ A new switch is installed in the Testking network. This switch is to be configured sothat VLAN information will be automatically distributed to all the other Cisco Catalyst switches in the network.Which of the conditions below have to be met in order for this to occur?()A. The switch that will share the VLAN information must be in the VTP Server mode.B. The switches must be in the same VTP domain.C. The switch that will share the VLAN information must be configured as the root bridge.D. The switches must be configured to use the same VTP version.E. The switches must be configured to use the same STP version.F. The switches must be configured to use the same type of ID tagging.G. The switches must be connected over VLAN trunks. ” 相关考题
考题 A Ezonexam switch is configured with all ports assigned to VLAN 2. In addition, all ports are configured as full-duplex FastEthernet. What is the effect of adding switch ports to a new VLAN on this switch?A.The additions will create more collisions domains.B.IP address utilization will be more efficient.C.More bandwidth will be required than was needed previously.D.An additional broadcast domain will be created.E.The possibility that switching loops will occur will increase dramatically.

考题 A new switch is installed in the Ezonexam network. This switch is to be configured so that VLAN information will be automatically distributed to all the other Cisco Catalyst switches in the network.Which of the conditions below have to be met in order for this to occur? (Choose all that apply).A. The switch that will share the VLAN information must be in the VTP Server mode.B. The switches must be in the same VTP domain.C. The switch that will share the VLAN information must be configured as the root bridge.D. The switches must be configured to use the same VTP version.E. The switches must be configured to use the same STP version.F. The switches must be configured to use the same type of ID tagging.G. The switches must be connected over VLAN trunks.

考题 An administrator replaced a router with a switch. End users are able to access network shares butare not able to access the Internet. Which of the following is the BEST explanation why the usersare unable to access the Internet?()A. Router routes traffic between different networks and a switch does notB. The new switch is faulty and needs to be replaced and configured correctlyC. The firewall needs to be setup to allow traffic to reach the InternetD. The switch needs to be setup to forward data traffic to the Internet

考题 A network technician is installing a new managed 10/100 Mbps switch on the network. The network has an older printer with a 10Mbps network adapter that will be moved to the new switch.Which of the following settings on the switch will need to be configured to support the printer?()A. MAC filteringB. IP addressC. PoED. Port speed

考题 An administrator is having a hard time adding a new switch to the network. After verifying that allthe ports are configured correctly on each switch, which of the following should the administratorverily NEXT?()A. Straight-through cable is used to connect both switchesB. Loopback plug is connectedC. Crossover cable is used to connect both switchesD. Cable is a rollover cable

考题 Refer to the diagram. Which three statements describe the router port configuration and the switch port configuration as shown in the topology? () A.The Router1 WAN port is configured as a trunking port.B.The Router1 port connected to Switch1 is configured using subinterfaces.C.The Router1 port connected to Switch1 is configured as 10 Mbps.D.The Switch1 port connected to Router1 is configured as a trunking port.E.The Switch1 port connected to Host B is configured as an access port.F.The Switch1 port connected to Hub1 is configured as full duplex.

考题 A switch is configured with all ports assigned to vlan 2 with full duplex FastEthernet to segment existing departmental traffic. What is the effect of adding switch ports to a new VLAN on the switch?()A、More collision domains will be created.B、IP address utilization will be more efficient.C、More bandwidth will be required than was needed previously.D、An additional broadcast domain will be created.

考题 Which three of these pre-requisite for resetting a Catalyst Express 500 switch when Cisco Network Assistant is unavailable?()A、At Least one enabled switch port that is unconnected to any deviceB、A PC pre-configured with a specific IP Address and MaskC、A PC or laptop with Windows 2000 or Windows XP installed and a web browser that has Java Script enabledD、Physical Access to SwitchE、A Switch with no connected devices

考题 A switch that is to be added to the production network has been preconfigured (trunks, VLANs, VTP, and STP) and was tested in your lab. After installing the switch into the network, the entire network went down.  What might explain what happened? ()A、The new switch happened to be running Cisco Catalyst operating system, while the other network switches were running Cisco IOS Software.B、The configuration revision of the new switch was higher than the configuration revision of the production VTP domain.C、The link costs on the new switch are set to a high value, causing all ports on the new switch to go into a forwarding mode and none into blocking mode, thereby causing a spanning-tree loop.D、The ports connecting to the two switches have been configured incorrectly. One side has the command switchport mode access and the other switchport mode trunk.

考题 You work as a network Technician. A new workstation has consistently been unable to obtain anIP address from the DHCP server when the workstation boots. Older workstations function normally, and the new workstation obtains an address when manually forced to renew its address.  What should be configured on the switch to allow the workstation to obtain an IP address at boot?()A、UplinkFast on the switch port connected to the serverB、BackboneFast on the switch port connected to the serverC、PortFast on the switch port connected to the workstationD、trunking on the switch

考题 You have just purchased a new Cisco 3560 switch running the enhanced IOS and need configure  it to be installed in a high availability network. On a 3560 EMI switch,  which three types of  interfaces can be used to configure HSRP?()A、 SVI interfaceB、 Access portC、 EtherChannel port channelD、 Loopback interfaceE、 Routed portF、 BVI interface

考题 An administrator would like to configure a switch over a virtual terminal connection from locations outside of the local LAN. Which of the following are required in order for the switch to be configured from a remote location? ()A、The switch must be configured with an IP address,subnet mask,and default gateway.B、The switch must be connected to a router over a VLAN trunk.C、The switch must be reachable through a port connected to its management VLAN.D、The switch console port must be connected to the Ethernet LAN.E、The switch management VLAN must be created and have a membership of at least one switch port.F、The switch must be fully configured as an SNMP agent.

考题 You have just created a new VLAN on your network.  What is one step that you should include in your VLAN-based implementation and verification plan? ()A、Verify that trunked links are configured to allow the VLAN traffic.B、Verify that the switch is configured to allow for trunking on the switch ports.C、Verify that each switch port has the correct IP address space assigned to it for the new VLAN.D、Verify that different native VLANs exist between two switches for security purposes.

考题 You need to create a new VLAN on your Catalyst switch. This VLAN is to be named TESTKING. Which of the following need to be completed for the creation of this new VLAN?()A、The TESTKING VLAN must be created.B、The desired ports must be added to the new TESTKING VLAN.C、The TESTKING VLAN must be added to all of the domains.D、The TESTKING VLAN must be named.E、An IP address must be configured for the TESTKING VLAN.F、None of the above. VLAN creations are automatic.

考题 Before inserting a new switch in the network,the network administrator checks that the VTP domain name is correct,the VTP mode is set to server, and revision is lower than the switches in the network. The administrator then configures interfaces and trunks,erases existing VLANs,and connects the switch to the network. Following that procedure,there is no connectivity in the network. What is a possible cause of this problem?()A、Because the configuration revision of the new switches is lower than the rest of the network, it can change the VLAN database of the other switches.B、As a VTP server, the new switch deleted all VLANs of the network.C、Erasing VLANs increases the VTP configuration revision.D、Since the configuration revision of the network is higher than the new switch, the VLAN database was automatically synchronized.

考题 A new switch is installed in the Testking network. This switch is to be configured sothat VLAN information will be automatically distributed to all the other Cisco Catalyst switches in the network. Which of the conditions below have to be met in order for this to occur?()A、The switch that will share the VLAN information must be in the VTP Server mode.B、The switches must be in the same VTP domain.C、The switch that will share the VLAN information must be configured as the root bridge.D、The switches must be configured to use the same VTP version.E、The switches must be configured to use the same STP version.F、The switches must be configured to use the same type of ID tagging.G、The switches must be connected over VLAN trunks.

考题 A network administrator is explaining VTP configuration to a new technician. What should the network administrator tell the new technician about VTP configuration?()A、A switch in the VTP client mode cannot update its local VLAN database.B、A trunk link must be configured between the switches to forward VTP updates.C、A switch in the VTP server mode can update a switch in the VTP transparent mode.D、A switch in the VTP transparent mode will forward updates that it receives to other switches.E、A switch in the VTP server mode only updates switches in the VTP client mode that have a higher VTP revision number.F、A switch in the VTP server mode will update switches in the VTP client mode regardless of the configured VTP domain membership.

考题 You are configuring a new Catalyst switch that you want to manage remotely from workstations on other network segments within your enterprise.Which of the following are required to allow remote management of the switch over IP?()A、The switch name must match the workgroup name of the local network.B、The switch must be configured with an IP address and default gateway.C、The remote workstations must have access to the management VLAN of the switch.D、CDP must be enabled on the switch so that it can be located by other devices on the network.

考题 An administrator replaced a router with a switch. End users are able to access network shares butare not able to access the Internet. Which of the following is the BEST explanation why the usersare unable to access the Internet?()A、Router routes traffic between different networks and a switch does notB、The new switch is faulty and needs to be replaced and configured correctlyC、The firewall needs to be setup to allow traffic to reach the InternetD、The switch needs to be setup to forward data traffic to the Internet

考题 A user is unable to connect to the network. A network technician is able to determine that there is a problem on the switch. All other users on that switch are able to connect successfully to the network. Which of the following is a probable cause?()A、Switching loop is occurring on the switch.B、Wrong subnet mask on the switch.C、Incorrect SNMP settings on the switch.D、Port is misconfigured on the switch.

考题 An administrator is having a hard time adding a new switch to the network. After verifying that allthe ports are configured correctly on each switch, which of the following should the administratorverily NEXT?()A、Straight-through cable is used to connect both switchesB、Loopback plug is connectedC、Crossover cable is used to connect both switchesD、Cable is a rollover cable

考题 多选题You are configuring a new Catalyst switch that you want to manage remotely from workstations on other network segments within your enterprise.Which of the following are required to allow remote management of the switch over IP?()AThe switch name must match the workgroup name of the local network.BThe switch must be configured with an IP address and default gateway.CThe remote workstations must have access to the management VLAN of the switch.DCDP must be enabled on the switch so that it can be located by other devices on the network.

考题 单选题A switch that is to be added to the production network has been preconfigured (trunks, VLANs, VTP, and STP) and was tested in your lab. After installing the switch into the network, the entire network went down.  What might explain what happened? ()A The new switch happened to be running Cisco Catalyst operating system, while the other network switches were running Cisco IOS Software.B The configuration revision of the new switch was higher than the configuration revision of the production VTP domain.C The link costs on the new switch are set to a high value, causing all ports on the new switch to go into a forwarding mode and none into blocking mode, thereby causing a spanning-tree loop.D The ports connecting to the two switches have been configured incorrectly. One side has the command switchport mode access and the other switchport mode trunk.

考题 单选题A network technician is installing a new managed 10/100 Mbps switch on the network. The network has an older printer with a 10Mbps network adapter that will be moved to the new switch. Which of the following settings on the switch will need to be configured to support the printer?()A MAC filteringB IP addressC PoED Port speed

考题 单选题You have just created a new VLAN on your network.  What is one step that  you should include in your VLAN based implementation and verification plan? ()A Verify that different native VLANs exist between two switches for security purposes.B Verify that the VLAN was added on all switches with the use of the show vlan command. C Verify that the switch is configured to allow for trunking on the switch ports.D Verify that each switch port has the correct IP address space assigned to it for the new VLAN.

考题 多选题You have just purchased a new Cisco 3560 switch running the enhanced IOS and need configure  it to be installed in a high availability network. On a 3560 EMI switch,  which three types of  interfaces can be used to configure HSRP?()ASVI interfaceBAccess portCEtherChannel port channelDLoopback interfaceERouted portFBVI interface

考题 多选题An administrator would like to configure a switch over a virtual terminal connection from locations outside of the local LAN. Which of the following are required in order for the switch to be configured from a remote location? ()AThe switch must be configured with an IP address,subnet mask,and default gateway.BThe switch must be connected to a router over a VLAN trunk.CThe switch must be reachable through a port connected to its management VLAN.DThe switch console port must be connected to the Ethernet LAN.EThe switch management VLAN must be created and have a membership of at least one switch port.FThe switch must be fully configured as an SNMP agent.

考题 多选题Which three of these pre-requisite for resetting a Catalyst Express 500 switch when Cisco Network Assistant is unavailable?()AAt Least one enabled switch port that is unconnected to any deviceBA PC pre-configured with a specific IP Address and MaskCA PC or laptop with Windows 2000 or Windows XP installed and a web browser that has Java Script enabledDPhysical Access to SwitchEA Switch with no connected devices