网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

材料:

An aircraft lift on board RFA Argus was loaded beyond its safe working load of 18.4 tonnes.There were no injuries to any personnel,or material damage to the ship or its equipment.

During a planned stay in port,500 compressed CO2 cylinders were required to be landed.These were normally stowed on a lower deck and needed to be transferred to the weather deck before being taken ashore.Before the vessel&39;s arrival in port,the planned operation was discussed between various officers and senior ratings,one of whom was to supervise final discharge of the cylinders from the ship.

Once in port,a senior rating gave instructions to three juniors to transfer a number of cylinders to the weather deck.He then left them alone to load the cylinders onto the platform. of an aircraft lift.The cylinders weighed 19.95 tonnes,which was greater than they had been instructed to load.In addition to this excess weight they added a fork lift truck weighing 5.5 tonnes.The lift was then raised.

When it reached the weather deck,the lift was unable to stow at the correct level.When investigated it was discovered that the load of both CO2 bottles and the fork lift truck was greater than its safe working load(SWL)and this had prevented the locking cleats at the flight deck(weather deck)engaging.

问题:

The lift was taken out of service for testing and inspection. The safe working load of the aircraft lift is ________ tonnes.

A.18.4

B.19.95

C.5.5

D.500

The aircraft lift was overloaded by a weight which is ________ more than its SWLA.1.55

B.3.95

C.5.5

D.7.05

It is implied in the passage that ________.A.the lift should be raised slowly to avoid the accident

B.the aircraft lift on board RFA Argus should be driven by super power

C.the senior rating should give instructions in more detail to the three juniors to transfer a number of cylinders to the weather deck

D.if the unloading operation was supervised by an officer who has sufficient experience of the loads,lifting equipment and the overall operation,the accident would had been avoided

It was the ________ that had prevented the locking cleats at the flight deck(weather deck)engaging.A.fork lift

B.CO2 bottles

C.overloaded weight

D.the three juniors

请帮忙给出每个问题的正确答案和分析,谢谢!


参考答案

更多 “ 材料:An aircraft lift on board RFA Argus was loaded beyond its safe working load of 18.4 tonnes.There were no injuries to any personnel,or material damage to the ship or its equipment.During a planned stay in port,500 compressed CO2 cylinders were required to be landed.These were normally stowed on a lower deck and needed to be transferred to the weather deck before being taken ashore.Before the vessels arrival in port,the planned operation was discussed between various officers and senior ratings,one of whom was to supervise final discharge of the cylinders from the ship.Once in port,a senior rating gave instructions to three juniors to transfer a number of cylinders to the weather deck.He then left them alone to load the cylinders onto the platform. of an aircraft lift.The cylinders weighed 19.95 tonnes,which was greater than they had been instructed to load.In addition to this excess weight they added a fork lift truck weighing 5.5 tonnes.The lift was then raised.When it reached the weather deck,the lift was unable to stow at the correct level.When investigated it was discovered that the load of both CO2 bottles and the fork lift truck was greater than its safe working load(SWL)and this had prevented the locking cleats at the flight deck(weather deck)engaging.问题:The lift was taken out of service for testing and inspection. The safe working load of the aircraft lift is ________ tonnes.A.18.4B.19.95C.5.5D.500The aircraft lift was overloaded by a weight which is ________ more than its SWLA.1.55B.3.95C.5.5D.7.05It is implied in the passage that ________.A.the lift should be raised slowly to avoid the accidentB.the aircraft lift on board RFA Argus should be driven by super powerC.the senior rating should give instructions in more detail to the three juniors to transfer a number of cylinders to the weather deckD.if the unloading operation was supervised by an officer who has sufficient experience of the loads,lifting equipment and the overall operation,the accident would had been avoidedIt was the ________ that had prevented the locking cleats at the flight deck(weather deck)engaging.A.fork liftB.CO2 bottlesC.overloaded weightD.the three juniors请帮忙给出每个问题的正确答案和分析,谢谢! ” 相关考题
考题 What ________ the safe working load of the derrick?A.isB.beC.areD.has

考题 The adoption of containers facilitated()to a great extent. A、to load and unloadB、the loading and unloadingC、us to load and unloadD、to have loaded and unloaded

考题 Cargo booms must be weight tested to recertify the Safe Working Load(SWL)every ______.A.YearB.Two yearsC.Four yearsD.Five years

考题 The safe working load for the assembled cargo gear and the minimum angle to the horizontal for which the gear is designed shall be marked on the ______.A.deckB.head of the boomC.heel of the boomD.mast or king post

考题 When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to ______.A.winch speedB.boom strengthC.load radiusD.cable strength

考题 In relation to cargo gear, what does SWL mean ?______.A.Safe working loadB.Ship’s working liftC.Starboard wing liftD.Stress, weight, load

考题 Training includes practical experience working on a range of aircraft on campus including a______Boeing aircraft owned by the school.A.broken B.functioning C.used D.skeleton

考题 The jumbo boom can ().A、lift heavy cargoB、load and unloadC、join ropes togetherD、lift light cargo

考题 英文备注“the derrick safe working load 3t”的中文意思是:()A、吊杆的重量为3tB、吊杆吊起的重量是3tC、吊杆工作时不能吊起3t的货物D、吊杆安全负荷量3t

考题 安全负荷量()A、the loadB、safe working loadC、safe workingD、safe loading work

考题 Sailors should know the ()(安全工作负荷量)of derricks.A、safe working loadB、safety work loadC、safe work loadD、safe working loading

考题 “SWL” means ().A、safe working loadB、safe work loadC、safe worked loadD、safely working load

考题 Refer to the exhibit. For what two reasons has the router loaded its IOS image from the location that is shown? ()A、Router1 has specific boot system command that instruct it to load IOS from TFTP server.B、Router1 is acting as a TFTP server for other routers.C、Router1 cannot locate a valid IOS image in flash memory.D、Router1 defaulted to ROMMON mode and loaded the IOS image from a TFTP server.E、Cisco routers will first attempt to load a image from TFTP for management purposes.

考题 What is true regarding direct-load insert?()A、A direct-load insert can be invoked by suing the APPEND hint.B、Inserting using the NOLOGGING option is the default for direct-load inserts.C、All data loaded using direct-load insert is loaded below the high-water mark.D、An object that is modifies using parallel direct-load can be queried within the same Transaction.

考题 单选题During storm conditions on a vessel,the mooring tensions should be adjusted so that().A all mooring lines have a different tensionB the leeward lines have higher tension than the windward linesC the maximum tension of the most heavily loaded line does not exceed the safe working loadD all horizontal tension forces on the windward lines are no greater than the vertical tension forces

考题 单选题The beacon located on board aircraft is termed().A EPIRBB PLBC ELTD MCC

考题 单选题The ()(载驳船) carries loaded lighter on board.A LASHB Lo/LoC Ro/RoD LNG carrier

考题 单选题In determining a safe speed()shall not be among those taken into account.A the characteristics,efficiency and limitation of the radar equipmentB any constraints imposed by the radar range scale in useC the effect on radar detection of the sea state,weather and other sources of interferenceD the safe working load of the cranes both on board and ashore

考题 多选题Refer to the exhibit. For what two reasons has the router loaded its IOS image from the location that is shown? ()ARouter1 has specific boot system command that instruct it to load IOS from TFTP server.BRouter1 is acting as a TFTP server for other routers.CRouter1 cannot locate a valid IOS image in flash memory.DRouter1 defaulted to ROMMON mode and loaded the IOS image from a TFTP server.ECisco routers will first attempt to load a image from TFTP for management purposes.

考题 单选题The safe working load of the derrick is ().A 5 tonsB 5 metresC 5 feetD 5 years

考题 单选题Which statement is TRUE about nylon line?()A Manila line will usually last longer than nylon lineB Nylon line is excellent for use in alongside towingC A normal safe working load will stretch nylon line 50%D Nylon stoppers should be used with nylon line

考题 单选题The MINIMUM acceptable size for a towing bridle would be that size in which the safe working load (SWL) of each leg of the bridle is equal to().A one-half the SWL of the main towing hawserB three-fourths the SWL of the main towing hawserC that of the main towing hawserD twice that of the main towing hawser

考题 单选题The additional cargo is to be loaded()board our ship.A onB inC fromD to

考题 单选题Examine the following PL/SQL block:   DECLARE   my_plans pls_integer; BEGIN  my_plans := DBMS_SPM.LOAD_PLANS_FROM_CURSOR_CACHE (sql_id= ?9twu5t2dn5xd?; END;   Which statement is true about the plan being loaded into the SQL plan baseline by the above command?()A  It is loaded with the FIXED status.B  It is loaded with the ACCEPTED status.C  It is not loaded with the ENABLED status.D  It is not loaded with the ACCEPTED status.

考题 单选题The safe working load for the assembled cargo gear and the minimum angle to the horizontal for which the gear is designed shall be marked on the().A deckB head of the boomC heel of the boomD mast or king post

考题 单选题The safe working load of the ()is 100 tons.A single derrickB derrickC heavy derrickD deck

考题 单选题Cargo booms must be weight tested to recertify the Safe Working Load (SWL) every().A yearB two yearsC four yearsD five years