网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

A crack in the deck plating of a vessel may be temporarily prevented from increasing in length by___________.

A.cutting a square notch at each end of the crack

B.drilling a hole at each end of the crack

C.slot-welding the crack

D.welding a doubler over the crack


参考答案

更多 “ A crack in the deck plating of a vessel may be temporarily prevented from increasing in length by___________.A.cutting a square notch at each end of the crackB.drilling a hole at each end of the crackC.slot-welding the crackD.welding a doubler over the crack ” 相关考题
考题 Cracks may be prevented from developing at the corners of welded plating inserts by ______.A.squaring the cornersB.rounding the cornersC.plug welding the cornersD.slot welding the corners

考题 In heavy weather you notice buckling in the midships deck plating of your vessel.To relieve the strain you could ______.A.pump fuel oil from midships to the ends of the vesselB.reduce speedC.take a course which most eases the vesselD.All of the above

考题 Which statement about the deck line is TRUE ________.A.The top of the deck line is marked at the highest point of the freeboard deck,including camber,at the midships pointB.A vessel with wooden planks on a steel deck will have the deck line marked at the intersection of the upper line of the wood sheathing with the side shellC.The deck edge is marked at the intersection of the freeboard deck with the side shell,at the lowest point of sheer,with the vessel at even trimD.On a vessel with a rounded stringer-sheer plate,the deck line is marked where the stringer plate turns down from the plane of the deck line

考题 从水面到甲板之间的高度称之为干舷。()A、The height from the bottom of a vessel to the weather deck is called freeboard.B、The depth from water level to the bottom of a vessel is called freeboard.C、The length from the bow to stern of a vessel is called freeboard.D、The height from water level to the main deck is called freeboard.

考题 单选题()is the depth of the vessel at ship’s side from the upper deck to the lowest point of the keel.A Extreme draftB Molded draftC Extreme depthD Molded depth

考题 单选题The deck plating on a ship is supported primarily by deck longitudinals and deck().A girdersB stanchionsC framesD beams

考题 单选题You must shift a weight from the upper tween deck to the lower hold. This shift will().A make the vessel more tenderB make the vessel stifferC increase the rolling periodD decrease the metacentric height

考题 单选题Your vessel is damaged with no list,but down by the stern. There is progressive flooding and trim by the stern is increasing. What is the effect on transverse stability after the deck edge at the stern is submerged?()A KB increases,increasing BM and therefore GMB KG increases due to the weight of the added water on deckC BM decreases from loss of water plane and greater volumeD There is no effect on transverse stability

考题 单选题What is likely to occur when you are surging synthetic mooring lines on the gypsyhead during mooring operations?()A The lines may jam and then jump off the gypsyheadB If there is sudden strain on the line,the man tending the line may be pulled into the gypsyheadC The lines' surging may cause the vessel to surgeD The heat generated may cause the lines to temporarily fuse to the gypsyhead

考题 单选题A well in the uppermost deck of a shelter deck vessel which has only a temporary means of closing for the purpose of gaining an exemption from tonnage measurement is called a(n)().A Exemption spaceB Tonnage deckC CofferdamD Tonnage opening

考题 单选题A crack in the deck plating of a vessel may be temporarily prevented from increasing in length by().A cutting a square notch at each end of the crackB drilling a hole at each end of the crackC slot-welding the crackD welding a doubler over the crack

考题 单选题On every vessel,distress signals must be stowed().A on or near the navigating bridgeB on the flying bridge not closer than 15 feet to any bulkheadC above the freeboard deck away from heatD in an enclosed space below the freeboard deck away from heat

考题 单选题An excessive amount of water is prevented from entering a vessel using a water lubricated stern tube bearing by the use of the ().A propeller hubB lignum vitaeC shaft packingD labyrinth seal

考题 单选题The lengthening of a crack formed in the shell plating of a ship may be prevented by ().A welding brackets across both ends of the crackB chipping out and slot welding the entire crackC drilling a hole at each end of the crackD cutting a square notch at each end of the crack

考题 单选题During the voyage from Dalian to Singapore, my vessel()heavy damages to the deck fittings.A maintainedB sustainedC pertainedD contained

考题 单选题You are on watch and the Pilot has the conn.The Master has temporarily gone below.The Pilot orders a course change which you are certain will put the vessel into imminent danger.Your first action should be to().A Countermand the order and immediately notify the MasterB Make an appropriate entry in the deck log concerning the Pilot's orderC Immediately call the Master and await further orders from himD Immediately sound a short ring on the general alarm

考题 单选题When cargo is shifted from the main deck into the lower hold of a vessel,().A The metacenter will move downwardB The GM will increaseC The center of buoyancy will move upwardD The list of the vessel will become great

考题 单选题In heavy weather you notice buckling in the midship deck plating of you vessel. To relieve the strain you could().A pump fuel oil from midships to the ends of the vesselB reduce speedC take a course which most eases the vesselD All of the above

考题 单选题You are loading a cargo that includes cylinders of acetylene aboard your break bulk vessel. Which statement is true? ()A The cylinders must be stowed at least 10 horizontal feet from corrosive materials in the same spaceB Stowage in the upper deck-deck is considered to be the equivalent of on deck stowage for this cargoC The cylinders must have a red label for flammability and a green label for compressed gasD The cylinders may be protected from the radiant heat of the Sun by laying a tarp on them

考题 单选题You will load and carry a bulk cargo of sulphur at ambient temperature. Which statement is true?().A Wooden covers must be laid over the bilge wells to prevent the sulphur from entering the bilgesB Bulk sulphur may be carried without a special permit providing the vessel complies with all applicable regulationsC The majir charateristic of this cargo is that it forms sulfuric acid upon contact with waterD Other hazardous material may not be stowed in the same hold as the sulphur bue may carried on deck above the hold

考题 单选题The garboard strake is the().A raised flange at the main deck edgeB riveted crack arrester strap on all-welded shipsC riveting pattern most commonly used in ship constructionD row of plating nearest the keel

考题 单选题The heavier outboard strake of deck plating on a ship is called the deck().A stiffenerB beamC stringerD doubler

考题 单选题The purpose of cant frames in steel vessel is().A To support the overhang of the sternB To strength the plating against the pounding of the seaC To add srength to the deck beams which support the weather deckD To support the plating of a cylindrical tank

考题 单选题Cracks may be prevented from developing at the corners of welded plating inserts by().A squaring the cornersB rounding the cornersC plug welding the cornersD slot welding the corners

考题 单选题The margin plate is the().A outboard strake of plating on each side of an innerbottomB outer strake of plating on each side of the main deck of a vesselC plate which sits atop the center vertical keelD uppermost continuous strake of plating on the shell of a vessel

考题 单选题从水面到甲板之间的高度称之为干舷。()A The height from the bottom of a vessel to the weather deck is called freeboard.B The depth from water level to the bottom of a vessel is called freeboard.C The length from the bow to stern of a vessel is called freeboard.D The height from water level to the main deck is called freeboard.

考题 单选题The floors in a vessel’s hull structure are kept from tripping,or folding over,by().A face platesB bottom longitudinalsC longitudinal deck beamsD transverse deck beams