网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

______is used for heaving up and slacking away the anchor and chain.

A.A mooring winch

B.A windlass

C.A deck crane

D.A lifeboat engine


参考答案

更多 “ ______is used for heaving up and slacking away the anchor and chain.A.A mooring winchB.A windlassC.A deck craneD.A lifeboat engine ” 相关考题
考题 ________ is used for heaving up and slacking away the anchor and chainA.A winchB.A windlassC.A craneD.A jumbo boom

考题 ________is used for lifting cargo.A.A mooring winchB.A windlassC.A deck craneD.A lifeboat engine

考题 A monkey fist is found on a ______.A.heaving lineB.lead lineC.manropeD.mooring line

考题 The sprocket wheel in a windlass,used for heaving in the anchor,is called a ______.A.capstanB.dog wheelC.fairleadD.wildcat

考题 Which statement is TRUE about the use of a“gob rope”________.A.The gob rope is a mooring line for tying up lighters for working cargo alongside a vessel anchored in an open roadsteadB.The gob rope is used to secure the towline aft over the centerline of a tugC.The gob rope is a line hung over a vessel's side to assist in boardingD.The gob rope is a rope used in mooring a vessel to a buoy

考题 The indication of a slipping anchor is a(n)______.A.Decrease in mooring line lengthB.Increase in the opposite amperageC.Increase in the opposite line tensionD.Decrease in mooring line tension and amperage

考题 Chafing gear(防摩擦装置) is used to______.A.anchor the boatB.pick up heavy loadsC.protect fiber rope from abrasionD.strengthen mooring lines

考题 备锚,摇“备车”钟。()A、Get anchor ready and ring “Stand by engine”.B、Get anchor ready and ring “Finished with engine”.C、Get mooring ready and ring “Stand by engine”.D、Get mooring ready and ring “Finished with engine”.

考题 Anchor is across” stands for “()” .A、Anchor is foulingB、Anchor is draggingC、Anchor is up and downD、A and B

考题 Stand by ()anchor!A、to heave awayB、heave onC、heave awayD、heaving away

考题 锚已离底。()A、Stand by for heaving up!B、Hoist the anchor ball .C、The anchor is clear of the bottom.D、The cable is clear .

考题 救助落水者应使用()A、Life LineB、Heaving RingC、Mooring LineD、Escape Strap

考题 单选题The machinery associated with heaving in and running out anchor chain is the().A winchB windlassC draw worksD dynamic pay out system

考题 单选题In anchoring orders, “Weigh anchor” means “()”.A Pay away the chainB Take in the chainC Check up the chainD Drop the anchor

考题 单选题()is used for heaving up and slacking away the anchor and chain.A A winchB A windlassC A deck craneD A lifeboat engine

考题 单选题Chafing gear is used to().A anchor the boatB pick up heavy loadsC protect fiber rope from abrasionD strengthen mooring lines

考题 单选题In a combination chain and wire rope mooring system,the anchor chain is deployed at the anchor end of the line to().A increase fatigue life of the systemB reduce the time to retrieve the lineC increase the holding powerD reduce the catenary

考题 单选题A mooring system that results in a spread system without anchor buoys is called a().A permanent chasing systemB wire rope mooring systemC shepherd's crook mooring systemD spring buoy mooring system

考题 单选题What effect is achieved from soaking an anchor().A It allows the bottom soil to consolidateB It gives the palms time to trip the anchorC It stabilizes the mooring systemD It lubricates the anchor for better tripping

考题 单选题An anchor winch should be equipped with mechanical brakes capable of holding().A half the breaking strength of the mooring lineB the full breaking strength of the mooring lineC the maximum expected tension of the mooring lineD 50% over the working tension of the mooring line

考题 单选题What is the holding power ratio of an anchor? ()A Maximum mooring line tension divided by the anchor's weight in airB Anchor's weight in air divided by the maximum mooring line tensionC Preloading tension divided by the anchor's weight in airD Operating tension divided by the anchor's weight in air

考题 单选题The holding power of an anchor is the().A maximum sustained vertical load an anchor will resist before draggingB maximum sustained horizontal load an anchor will resist before draggingC maximum sustained vertical load an anchor will resist before the mooring line breaksD maximum sustained horizontal load an anchor will resist before the mooring line breaks

考题 单选题The indication of a slipping anchor is a(n)().A decrease in mooring line lengthB increase in the opposite amperageC increase in the opposite line tensionD decrease in mooring line tension and amperage

考题 单选题Most anchor handling equipment incorporates () for mooring purposes.A cable liftersB spur wheelsC bollardD warpends

考题 单选题()should you do first when heaving up the anchor.A Engage the wildcatB Release the brakeC Release the pawlD Engage the motor

考题 单选题The sprocket wheel in a windlass,used for heaving in the anchor,is called a().A capstanB dog wheelC fairleadD wildcat

考题 单选题锚已离底。()A Stand by for heaving up!B Hoist the anchor ball .C The anchor is clear of the bottom.D The cable is clear .