网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

Which method should be used to warm up the pump turbines prior to discharge ________.

A.Lock the turbine rotor and slowly bleed in steam until operating temperature is reached

B.Run the pump at high speed with the discharge valves closed

C.Run the turbine at slow speed with the pump disconnected

D.Shut the discharge valve and run the pump at slow speed


参考答案

更多 “ Which method should be used to warm up the pump turbines prior to discharge ________.A.Lock the turbine rotor and slowly bleed in steam until operating temperature is reachedB.Run the pump at high speed with the discharge valves closedC.Run the turbine at slow speed with the pump disconnectedD.Shut the discharge valve and run the pump at slow speed ” 相关考题
考题 Which of the following terms is used to identify the pressure of the liquid entering a pump?A.Suction headB.Pump headC.Discharge headD.Total head

考题 Which of the following will be the advantage of a centrifugal pump as compared with a reciprocating pump? l.Its discharge is continuous; ll.It has no internal valves: lll.Upon accidental closing of discharge valve, excessive pressure will not build up()A.l, llB.ll, lllC.l ,ll.IIID.llonly

考题 Consider the following table:Which method should used to add a new g201305 partition to the table?() A.AB.BC.CD.DE.E

考题 While on watch in the engine room, you hear a continuous sounding of the general alarm. Which of the following actions should you take?A.Make an entry in the official logbookB.Open the master control valves on the fixed CO2 systemC.Start the fire pump and check discharge pressureD.Secure auxiliary condenser overboard discharge

考题 Which install method should be used to recycle an LPAR without retaining any information from its original configuration?() A.MigrationB.PreservationC.New and Complete OverwriteD.Alternate disk installation

考题 A spur gear pump should be operated with the discharge valves ______.A.slightly openedB.throttledC.fully openedD.halfway opened

考题 If it becomes necessary to pump bilges while a vessel is in port, which of the following procedures should be followed?A.Pump only if the discharge is led to a shore tank or bargeB.Pump only during the hours of darknessC.Pump only on the outgoing tideD.Pump only as much as is necessary

考题 If you must pump bilges while a vessel is in port,you should pump only ______.A.If discharge is led to a shore tank or bargeB.During the hours of darknessC.On the outgoing tideD.As much as is necessary

考题 During which phase of the steps to success methodology for Cisco SMB Security Solutions would the Network Readiness Assessment be used to assess the readiness of an existing network infrastructure and determine which,if any modification should be prior to implementation?()A、PrepareB、DesignC、PositionD、DevelopE、PlanF、Perform

考题 Which install method should be used to recycle an LPAR without retaining any information from its original configuration?()  A、MigrationB、PreservationC、New and Complete OverwriteD、Alternate disk installation

考题 单选题In () pump a closed discharge valve will not cause excessive pressure to build up.A gearB vaneC screwD centrifugal

考题 单选题What is a function of the wearing rings used in most centrifugal pumps?()A Absorb erosion of high velocity discharge streamB Seal pump shaft against entry of airC Isolate the discharge side from the suction sideD Dampen the turbulent discharge flow

考题 单选题Which of the following will be the advantage of a centrifugal pump as compared with a reciprocating pump?() (1) Its discharge is continuous (2) It has no internal valves (3) Upon accidental closing of discharge valve, excessive pressure will not build upA (1),(2)B (2),(3)C (1),(2),(3)D (2)only

考题 单选题Which method should be used to warm up the pump turbines prior to discharge().A Lock the turbine rotor and slowly bleed in steam until operating temperature is reachedB Run the pump at high speed with the discharge valves closedC Run the turbine at slow speed with the pump disconnectedD Shut the discharge valve and run the pump at slow speed

考题 单选题During which phase of the steps to success methodology for Cisco SMB Security Solutions would the Network Readiness Assessment be used to assess the readiness of an existing network infrastructure and determine which,if any modification should be prior to implementation?()A PrepareB DesignC PositionD DevelopE PlanF Perform

考题 单选题Most pump manufacturers recommended that the discharge piping for centrifugal pumps be ().A one size larger than the pump discharge nozzleB the same size as the pump discharge nozzleC one size smaller than the pump discharge nozzleD installed with a short radius elbow at the pump

考题 单选题During which phase of the steps to success methodology for Cisco SMB security solutions would the Network Readiness Assessment be used to assess the readiness of an existing network infrastructure and determine which, if any, modification should be made prior to implementation?()A PositionB PrepareC DesignD PerformE Plan

考题 单选题To operate a centrifugal fire pump at reduced capacity, you should ().A readjust the relief valveB throttle the suction lineC throttle the discharge valveD open the priming line

考题 单选题If it becomes necessary to pump bilges while a vessel is in port, which of the following procedures should be followed?()A Pump only if the discharge is led to a shore tank or bargeB Pump only during the hours of darknessC Pump only on the outgoing tideD Pump only as much as is necessary

考题 单选题Which of the listed statements is correct concerning the starting of centrifugal pumps?()A They should always be started with the discharge valve closedB They should always be started with the discharge valve openedC A priming pump is always required to flood the impeller suctionD They should always be started with the sealing line valves closed

考题 单选题The terminal indicates to you that they are going to use a booster pump to assist the discharging operation. You start the discharge,and in a few minutes the pressure drops sharply. This could be a result of the().A booster pump coming on the line and discharging properlyB booster pump failing to startC booster pump being lined up in the wrong directionD ship's pump speeding up

考题 单选题A relief valve for a cargo pump is generally installed().A after the discharge valveB between the pump and discharge valveC after the suction valveD between the pump and suction valve

考题 单选题If a bilge pump failed to build up discharge pressure, you should check for ().A excessive water in the bilgesB a clogged suction strainerC oil in the bilgesD All of the above

考题 单选题Which method should be used to dynamically elect an RP when your network is using PIM version1?()A auto-RPB static RPC discovery modeD bootstrap protocol

考题 单选题When starting a centrifugal pump, the discharge valve should be ().A closedB opened fullyC cracked openD partly open

考题 单选题The simplest method to use for determining if a centrifugal pump is operating as designed, is to ().A closely observe the pump discharge temperatureB close off the discharge valve, and watch for a rise in pressureC momentarily close off the suction valve, and watch for a rise in pressureD use a clamp on ammeter and compare the readings to past records

考题 单选题With reference to operating a four-ram steering gear system under emergency conditions, which one of the following statements is incorrect?()A Only one pump should be used at any timeB The ship speed should be reduced to 70% of the normalC Watch keeping of the steering gear should be increasedD Limitations of the steering gear should be logged but the bridge need not be informed