网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

________is your freeboard?

A.What

B.How

C.Which

D.When


参考答案

更多 “ ________is your freeboard?A.WhatB.HowC.WhichD.When ” 相关考题
考题 The amount of freeboard affects the ______.① amount of reserve buoyancy of a vessel ② range of stability of a vessel.A.① onlyB.② onlyC.Both ① and ②D.Neither ① nor ②

考题 From ________ the information concerning the tons per inch or centimeter immersion of a vessel shall be usually found.A.Stability CurveB.Deadweight ScaleC.Table of AzimuthD.Freeboard Assignment

考题 The Certificate of Freeboard is the ______.A.Loadline CertificateB.Certificate of InspectionC.Admeasurer's CertificateD.Forecastle Card

考题 Which statement about the deck line is TRUE ________.A.The top of the deck line is marked at the highest point of the freeboard deck,including camber,at the midships pointB.A vessel with wooden planks on a steel deck will have the deck line marked at the intersection of the upper line of the wood sheathing with the side shellC.The deck edge is marked at the intersection of the freeboard deck with the side shell,at the lowest point of sheer,with the vessel at even trimD.On a vessel with a rounded stringer-sheer plate,the deck line is marked where the stringer plate turns down from the plane of the deck line

考题 ______:the vertical distance measured on the vessel’s side amidships from the load water line to the upper side of the freeboard deck or a point corresponding to it.A.BuoyancyB.FreeboardC.DraftD.Displacement

考题 A vessel’s maximum stability is closely associated with which of the following?______. ① The angle of deck-edge immersion. ② The amount of freeboard.A.① onlyB.② onlyC.Both ① and ②D.Neither ① nor ②

考题 安全超高(freeboard)

考题 从水面到甲板之间的高度称之为干舷。()A、The height from the bottom of a vessel to the weather deck is called freeboard.B、The depth from water level to the bottom of a vessel is called freeboard.C、The length from the bow to stern of a vessel is called freeboard.D、The height from water level to the main deck is called freeboard.

考题 The freeboard is more than 9 metres. ()A、干舷大于9米。B、干舷小于9米。C、吃水大于9米。D、吃水小于9米。

考题 If the freeboard is less than 9 meters, we should rig().A、a gangwayB、a pilot ladderC、rope ladderD、gangway combined with pilot ladder

考题 What’s “吃水” in English?()A、Draft.B、Draught.C、A+BD、Freeboard.

考题 ()refers to the paint on the freeboard.A、Dry paintB、Topside paintC、Side paintD、Primer

考题 freeboard()A、吃水B、干舷C、高度D、水位线

考题 单选题freeboard()A 吃水B 干舷C 高度D 水位线

考题 单选题Your vessel is damaged,listing to port and on occasion flopping to the same angle to starboard. It has a long,slow,sluggish roll around the angle of list. There is excessive trim by the stern with little freeboard aft. What action should you take?().A Jettison any off-center topside weights to lower GM and correct the listB Pump out any slack after double-bottom tanks to reduce free surface and increase freeboard aftC Pump out the after peak and fill the forepeak to change the trimD Press up any slack double-bottom tanks forward of the tipping center,then fill the forepeak if empty

考题 单选题Your vessel is damaged and listing to port. There is a short rolling period around the angle of list. The portside freeboard is reduced to 1 foot. There is no trim and the weather is calm. You should FIRST().A press up a slack double bottom tank on the port sideB fill an empty centerline double bottom tankC pump out a slack marine portable tank located on the portside amidshipsD jettison the anchors and anchor cables

考题 单选题Your vessel is damaged and is listing to port. The rolling period is short. There is sufficient freeboard so that deck edge submersion is not a problem. What corrective action should be taken FIRST in regard to the vessel’s stability?().A Press up any slack double-bottom tanks to eliminate free surfaceB Flood any empty double-bottom tanks to add weight low and downC Jettison topside weights to reduce KG and KBD Shift any off-center weights from port to starboard

考题 单选题Which factor does NOT affect the required freeboard of a cargo vessel? ()A Season of the yearB Geographic zone of operationC Density of the waterD Condition of trim in normal operation

考题 单选题If the freeboard is more than 9 meters, we should rig().A gangwayB ladderC pilot ladderD gangway combined with pilot ladder

考题 单选题Your vessel is listing 4° to port and has a short rolling period. There is loose firefighting water in the hull. The ship is trimmed down by the head with one foot of freeboard at the bow. Which action should you take FIRST?()A Press up the slack NO.1 starboard double bottom tankB Pump out the forepeak tankC Eliminate the water in the 'tween decks aft

考题 单选题On every vessel,distress signals must be stowed().A on or near the navigating bridgeB on the flying bridge not closer than 15 feet to any bulkheadC above the freeboard deck away from heatD in an enclosed space below the freeboard deck away from heat

考题 单选题The stability of a vessel is normally the greatest when all fuel and water tanks are full because the ().A center of gravity is loweredB center of buoyancy is loweredC reserve buoyancy is unchangedD hull freeboard is increased

考题 单选题Freeboard is measured from the upper edge of the().A bulkwarkB deck lineC gunwale barD sheer strake

考题 单选题The amount of freeboard which a ship possesses has a tremendous effect on its().A initial stabilityB free surfaceC stability at large angles of inclinationD permeability

考题 单选题The height of coamings of hatchway above the exposed freeboard deck shall be at least()A 900mmB 600mmC 760mmD 450mm

考题 单选题从水面到甲板之间的高度称之为干舷。()A The height from the bottom of a vessel to the weather deck is called freeboard.B The depth from water level to the bottom of a vessel is called freeboard.C The length from the bow to stern of a vessel is called freeboard.D The height from water level to the main deck is called freeboard.

考题 单选题Your vessel is listening 4°to port and has a short rolling period. There is loose firefighting water in the hull. The ship is trimmed down by th end with one foot of freeboard at the bow. Which action should you take first?()A Press up the slack No.1 starboard double bottom tankB Pump out the forepeak tankC Eliminate the water in the tween decks aftD Jettision stores out of the paint locker in the focsle