网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
loading berth(英译中)


参考答案

更多 “ loading berth(英译中) ” 相关考题
考题 According to RFC 2328, what is the stateful order in which an OSPF router transitions to a full adjacency with a neighbor router?() A. Down, Init, 2 - Way, Exstart, Exchange, Loading, and FullB. Down, Init, 2 - Wa y, Exchange, Exstart, Loading, and FullC. Down, 2 - Way, Init, Loading, Exstart, Exchange, and FullD. Down, 2 - Way, Init, Exchange, Exstart, Loading, and FullE. Down, Init, 2 - Way, Loading, Exstart, Exchange, and FullF. Down, 2 - Way, Init, Exstart, Exch ange, Loading, and Full

考题 GIVE A WIDE BERTH TO THE BREAKWATER means ______.A.to keep clear of the breakwaterB.that there is much berth space near the breakwaterC.don't drop anchor too close to the breakwaterD.to keep the breakwater within sight

考题 My ship is ______ No.5 Berth for loading.A.onto the wharfB.moved asternC.into the dockD.moored alongside

考题 LOADING SITUATION OF SUB VSL SO FAR SATISFACTORY. AS PER PORT GENERAL ARRANGEMENT SHE WILL SHIFT TO ANOTHER BERTH TO CONTINUE HER LOADING THIS NOON. HER BEST ETD 2400HRS TONIGHT. According to this telex,______ is not mentioned.A.the vessel will shift to another berthB.loading is in normal progressC.she is expected to leave 2400 tonightD.the arrangement of her loading operations is far from satisfactory

考题 ______ refers to the stowage of cargo in a block of two or more adjoining cargo holds with the cargo holds adjacent to the block of loaded cargo holds empty.A.Alternate hold loading conditionB.Block hold loading conditionC.Part hold loading conditionD.Homogeneous hold loading condition

考题 ______ is not one of the more commonly adopted solid bulk cargo distributions.A.Alternate hold loading conditionB.Block hold loading conditionC.Part hold loading conditionD.Inhomogeneous hold loading condition

考题 According to RFC 2328, what is the stateful order in which an OSPF router transitions to a full adjacency with a neighbor router?()A、Down, Init, 2 - Way, Exstart, Exchange, Loading, and FullB、Down, Init, 2 - Wa y, Exchange, Exstart, Loading, and FullC、Down, 2 - Way, Init, Loading, Exstart, Exchange, and FullD、Down, 2 - Way, Init, Exchange, Exstart, Loading, and FullE、Down, Init, 2 - Way, Loading, Exstart, Exchange, and FullF、Down, 2 - Way, Init, Exstart, Exch ange, Loading, and Full

考题 什么叫班轮条款(Liner Term/Berth Term)?

考题 翻译:WIBON whether in berth or not

考题 翻译:whether in berth or not

考题 Which narrative regarding loading software is incorrect?()A、The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability BookletB、A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific shipC、Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation TestD、A Loading Program may be provided as a classification requirement or as an Owner’s option

考题 翻译:Time lost waiting for berth to count as loading/discharging time

考题 英译中:Loading and unloading

考题 单选题A quite simple method of improving a berth’s capacity is().A to increase the arrival/start of operations intervalB to increase the finishing of operations/leaving berth intervalC to decrease both the arrival/start of operations interval and the finishing of operations/leaving berth intervalD to decrease working shifts

考题 单选题She arrived at the anchorage last night and anchored()berth.A waitingB awaitingC awaiting forD waited

考题 名词解释题英译中:Loading and unloading

考题 问答题翻译:WIBON whether in berth or not

考题 单选题LOADING SITUATION OF SUB VSL SO FAR SATISFACTORY. AS PER PORT GENERALARRANGEMENT SHE WILL SHIFT TO ANOTHER BERTH TO CONTINUE HER LOADING THIS NOON. HER BEST ETD 2400HRS TONIGHT. According to this telex,()is not mentioned.A the vessel will shift to another berthB loading is in normal progressC she is expected to leave 2400 tonightD the arrangement of her loading operations is far from satisfactory

考题 单选题My ship is()No.5 berth for loading.A onto the wharfB moved asternC into the dockD moored alongside

考题 问答题翻译:whether in berth or not

考题 单选题Give a wide berth to the breakwater means().A to keep clear of the breakwaterB that there is much berth space near the breakwaterC Don't drop anchor too close to the breakwaterD to keep the breakwater within sight

考题 单选题If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.A in the loading placeB in the port or dockC in the loading spotD in the discharging spot

考题 单选题装卸货之前,打开舱盖。()A After loading and discharging, hatch covers will be opened.B After loading and discharging, hatch covers will be closed.C Before loading and discharging, hatch covers will be opened.D Before loading and discharging, hatch covers will be closed.

考题 问答题翻译:Time lost waiting for berth to count as loading/discharging time

考题 单选题According to RFC 2328, what is the stateful order in which an OSPF router transitions to a full adjacency with a neighbor router?()A Down, Init, 2 - Way, Exstart, Exchange, Loading, and FullB Down, Init, 2 - Wa y, Exchange, Exstart, Loading, and FullC Down, 2 - Way, Init, Loading, Exstart, Exchange, and FullD Down, 2 - Way, Init, Exchange, Exstart, Loading, and FullE Down, Init, 2 - Way, Loading, Exstart, Exchange, and FullF Down, 2 - Way, Init, Exstart, Exch ange, Loading, and Full

考题 单选题Shall we()wait at the roadstead till there is a free berth for us?A mustB ought toC have toD never

考题 单选题Which narrative regarding loading software is incorrect?()A The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability BookletB A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific shipC Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation TestD A Loading Program may be provided as a classification requirement or as an Owner’s option