网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
loading berth(英译中)
参考答案
更多 “ loading berth(英译中) ” 相关考题
考题
According to RFC 2328, what is the stateful order in which an OSPF router transitions to a full adjacency with a neighbor router?()
A. Down, Init, 2 - Way, Exstart, Exchange, Loading, and FullB. Down, Init, 2 - Wa y, Exchange, Exstart, Loading, and FullC. Down, 2 - Way, Init, Loading, Exstart, Exchange, and FullD. Down, 2 - Way, Init, Exchange, Exstart, Loading, and FullE. Down, Init, 2 - Way, Loading, Exstart, Exchange, and FullF. Down, 2 - Way, Init, Exstart, Exch ange, Loading, and Full
考题
GIVE A WIDE BERTH TO THE BREAKWATER means ______.A.to keep clear of the breakwaterB.that there is much berth space near the breakwaterC.don't drop anchor too close to the breakwaterD.to keep the breakwater within sight
考题
My ship is ______ No.5 Berth for loading.A.onto the wharfB.moved asternC.into the dockD.moored alongside
考题
LOADING SITUATION OF SUB VSL SO FAR SATISFACTORY. AS PER PORT GENERAL ARRANGEMENT SHE WILL SHIFT TO ANOTHER BERTH TO CONTINUE HER LOADING THIS NOON. HER BEST ETD 2400HRS TONIGHT. According to this telex,______ is not mentioned.A.the vessel will shift to another berthB.loading is in normal progressC.she is expected to leave 2400 tonightD.the arrangement of her loading operations is far from satisfactory
考题
______ refers to the stowage of cargo in a block of two or more adjoining cargo holds with the cargo holds adjacent to the block of loaded cargo holds empty.A.Alternate hold loading conditionB.Block hold loading conditionC.Part hold loading conditionD.Homogeneous hold loading condition
考题
______ is not one of the more commonly adopted solid bulk cargo distributions.A.Alternate hold loading conditionB.Block hold loading conditionC.Part hold loading conditionD.Inhomogeneous hold loading condition
考题
According to RFC 2328, what is the stateful order in which an OSPF router transitions to a full adjacency with a neighbor router?()A、Down, Init, 2 - Way, Exstart, Exchange, Loading, and FullB、Down, Init, 2 - Wa y, Exchange, Exstart, Loading, and FullC、Down, 2 - Way, Init, Loading, Exstart, Exchange, and FullD、Down, 2 - Way, Init, Exchange, Exstart, Loading, and FullE、Down, Init, 2 - Way, Loading, Exstart, Exchange, and FullF、Down, 2 - Way, Init, Exstart, Exch ange, Loading, and Full
考题
Which narrative regarding loading software is incorrect?()A、The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability BookletB、A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific shipC、Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation TestD、A Loading Program may be provided as a classification requirement or as an Owner’s option
考题
单选题A quite simple method of improving a berth’s capacity is().A
to increase the arrival/start of operations intervalB
to increase the finishing of operations/leaving berth intervalC
to decrease both the arrival/start of operations interval and the finishing of operations/leaving berth intervalD
to decrease working shifts
考题
单选题She arrived at the anchorage last night and anchored()berth.A
waitingB
awaitingC
awaiting forD
waited
考题
单选题LOADING SITUATION OF SUB VSL SO FAR SATISFACTORY. AS PER PORT GENERALARRANGEMENT SHE WILL SHIFT TO ANOTHER BERTH TO CONTINUE HER LOADING THIS NOON. HER BEST ETD 2400HRS TONIGHT. According to this telex,()is not mentioned.A
the vessel will shift to another berthB
loading is in normal progressC
she is expected to leave 2400 tonightD
the arrangement of her loading operations is far from satisfactory
考题
单选题My ship is()No.5 berth for loading.A
onto the wharfB
moved asternC
into the dockD
moored alongside
考题
单选题Give a wide berth to the breakwater means().A
to keep clear of the breakwaterB
that there is much berth space near the breakwaterC
Don't drop anchor too close to the breakwaterD
to keep the breakwater within sight
考题
单选题If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.A
in the loading placeB
in the port or dockC
in the loading spotD
in the discharging spot
考题
单选题装卸货之前,打开舱盖。()A
After loading and discharging, hatch covers will be opened.B
After loading and discharging, hatch covers will be closed.C
Before loading and discharging, hatch covers will be opened.D
Before loading and discharging, hatch covers will be closed.
考题
单选题According to RFC 2328, what is the stateful order in which an OSPF router transitions to a full adjacency with a neighbor router?()A
Down, Init, 2 - Way, Exstart, Exchange, Loading, and FullB
Down, Init, 2 - Wa y, Exchange, Exstart, Loading, and FullC
Down, 2 - Way, Init, Loading, Exstart, Exchange, and FullD
Down, 2 - Way, Init, Exchange, Exstart, Loading, and FullE
Down, Init, 2 - Way, Loading, Exstart, Exchange, and FullF
Down, 2 - Way, Init, Exstart, Exch ange, Loading, and Full
考题
单选题Shall we()wait at the roadstead till there is a free berth for us?A
mustB
ought toC
have toD
never
考题
单选题Which narrative regarding loading software is incorrect?()A
The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability BookletB
A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific shipC
Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation TestD
A Loading Program may be provided as a classification requirement or as an Owner’s option
热门标签
最新试卷