网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
There are()operational satellites in the INMARSAT system covering the whole globe except the polar regions.
A
3
B
4
C
8
D
12
参考答案
参考解析
解析:
暂无解析
更多 “单选题There are()operational satellites in the INMARSAT system covering the whole globe except the polar regions.A 3B 4C 8D 12” 相关考题
考题
听力原文:Other aspects of operational risk include major failure of information technology systems or events such as major fires or other disasters.(6)A.Information technology system can cause operational risk.B.A major fire can be a cause of operational risk.C.The most important types of operational risk involve breakdowns in internal controls and corporate governance.D.Other aspects of operational risk include firing its dealers, lending officers or other staff exceeding their authority or conducting business in an unethical or risky manner.
考题
Which operational mode command can be used to synchronize the local system time with an NTP server?()
A. set ntp time 64.32.129.3B. set clock ntp 64.32.129.3C. set time 64.32.129.3D. set date ntp 64.32.129.3
考题
A requirement is simply a statement of what the system must do or what characteristics it needs to have. Requirements written from the perspective of user and focus on user needs are called( ). Requirements written from the developers perspective and describe how the system will be implemented are called( ). Requirements evolve from detailed statemens of business capabilities that a system should have to detailed statements of the technical way in which the capabilities will be implemented in the new system. Requirements can be either functional or nofunctional in nature. For example, during the analysis phase of travel vehicles sales system, the system that must have the ability to search for available inventory is( ). The requirement that the system should be able to work on any Web browser belongs to( ). That customer personal information is protected in compliance with the Data Protection Act is a requirement of( ).A.operational requirements B.business requirements C.technical requirements D.system requirements A.operational requirements B.business requirements C.technical requirements D.system requirements A.a functional requirements B.a technical requirements C.an operational requirements D.a service requirements A.functional requirements B.technical requirements C.operational requirements D.information requirements A.system constraint B.system performance C.secrity and control D.cultural and political
考题
We also had to collect immense amounts of historical data and ____satellites to monitor the ocean-atmosphere system.A.make up
B.set up
C.devote to
D.invest in
考题
In which mode are users allowed to configure the device, including interfaces, protocols, user access, and system hardware properties?()A、priviledged modeB、configuration modeC、monitoring modeD、operational mode
考题
A customer wants to receive automatic notification of critical software problems and fixes for their RS/6000 or eServer pSeries system. Which is the most appropriate services offering to recommend to them?()A、TechlineB、ConsultlineC、Operational Support Services - RS/6000 SystemWatchD、Operational Support Services - Alert for pSeries
考题
Which tablespaces are mandatory in an Oracle database for it to be operational()A、Undo tablespaceB、USERS tablespaceC、SYSAUX tablespaceD、SYSTEM tablespaceE、Temporary tablespace
考题
单选题The position of the AOR-W satellite in the INMARSAT system is()above the equator.A
64.5EB
178EC
15.5WD
54W
考题
单选题The coordinated broadcast and automated reception of MSI via the INMARSAT EGC system using English to meet the requirements of the SOLAS Convention:().A
international NAVTEX ServiceB
FleetNET ServiceC
SafetyNet ServiceD
WWNWS
考题
单选题要使E[Y-(aX+b)]2达到最小,则常数a=( )。b=( )。A
a=Cov(X,Y)/D(X);b=E(Y)-[E(X)Cov(X,Y)/D(X)D(Y)]B
a=Cov(X,Y)/D(X);b=E(Y)-[E(X)Cov(X,Y)/D(X)]C
a=Cov(X,Y);b=E(Y)-[E(X)Cov(X,Y)/D(X)]D
a=Cov(X,Y);b=E(Y)-[E(X)Cov(X,Y)/D(X)D(Y)]
考题
单选题()is a space system using one or more artificial earth satellites.A
Satellite networkB
Satellite linkC
GMDSSD
Satellite system
考题
单选题Every oil tanker operating with dedicated clean ballast tanks shall be()with a Dedicated Clean Ballast Tank Operation Manual detailing the system and specifying operational procedures.A
compliedB
repliedC
dividedD
provided
考题
单选题The position if the IOR satellite in the INMARSAT system is()above the equator.A
64.5EB
178EC
15.5WD
54W
考题
单选题Any ship fitted with SES can()and()through the satellite system when sending a distress alert.A
enter the system/ contact an RCCB
access to INMARSAT/establish contact with a CESC
have absolutely priority to enter the system/make contact with a CESD
enter the system gradually/wait for rescue
考题
单选题A retail customer wants to identify the system firmware version information on several IBM System x servers and apply updates as required from a central location without causing server downtime. Which IBM tool provide this capability?()A
CDATB
Systems DirectorC
Server GuideD
Tivoli Provisioning Manager for Operational System Deployment (TPMfOSD)
考题
单选题The NCS of INMARSAT-A system in the AOR-E is in().A
Goonhilly, UKB
Yamaguchi, JapanC
Perth, AustraliaD
Southbury, USA
考题
单选题Any ship with SES can()and()through the Inmarsat satellites when sending a distress alert.A
enter the system rapidly / wait for rescueB
have an absolute priority to enter the system / contact with a CESC
establish contact with the RCC / enter the portD
enter the system gradually / get the rescue
考题
单选题Which operational mode command can be used to synchronize the local system with an NTP server?()A
set ntp time 64.32.129.3B
set clock ntp 64.32.129.3C
set time 64.32.129.3D
set date ntp 64.32.129.3
考题
单选题Which operational mode command can be used to synchronize the local system time with an NTP server?()A
set ntp time 64.32.129.3B
set clock ntp 64.32.129.3C
set time 64.32.129.3D
set date ntp 64.32.129.3
考题
单选题There are some back-up satellites in the event of failure. If the operational satellite is out of work,().A
communications in the whole system will stopB
the global system will be damagedC
the back-up one will take its placeD
the whole system will not work
考题
单选题The Inmarsat system has five major components, they are:().A
Space segment, NCC, RCC, SES and CESB
Space Segment, a satellite system, C system, NCC and NCSC
Space Segment, NCC, NCS,CES and SESD
A system, C system, satellite system, earth stations and NCS
考题
单选题The NCS of INMARSAT-A system in the IOR is in().A
Goonhilly, UKB
Yamaguchi, JapanC
Perth, AustraliaD
Southbury, USA
考题
单选题Which Inmarsat system applies store-and-forward messaging?()A
Inmarsat-AB
Inmarsat-CC
Inmarsat-BD
Inmarsat-M
考题
单选题Which statement about satellite navigation is TRUE? ()A
While a fix can be generated by signals received from two satellites,three satellites are necessary for reliable accuracyB
The satellites are in equatorial orbits around the earth about 60°of longitude apartC
The satellite navigation system determines a fix by measuring the doppler shift of the radio signals from the satelliteD
The ship's receiver cannot begin processing data until the antenna locks onto the satellite and starts continuous tracking
考题
单选题The pressure range between the system cut in and cut out pressures in a refrigeration unit is known as()A
opposing operational dragB
pressure distributionC
differentialD
system purge
热门标签
最新试卷