网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
__________assessment is based on a fixed standard that is usually the ultimate goal which the students are expected to achieve at the end of the course.
A
Criterion-referenced
B
Norm-referenced
C
Summative
D
Diagnostic
参考答案
参考解析
解析:
更多 “单选题__________assessment is based on a fixed standard that is usually the ultimate goal which the students are expected to achieve at the end of the course.A Criterion-referencedB Norm-referencedC SummativeD Diagnostic” 相关考题
考题
Quality control charts show a characteristic of the product or service against:A . the specification limitsB . customer requirementsC . control limits based on three standard deviations in each directionD . control limits based on six standard deviations in each directionE . A and D only
考题
The type of contract (payment mechanism) chosen for a project is often a reflection of the degree of risk associated with completing that project. For a firm fixed price contract, payment for risk _____ .A Is accomplished by paying the actual costs to the contractor.B Is accomplished by paying the contractor for his costs plus a fixed fee (profit).C Is an undisclosed contingency in the contractor's bid.D Is accomplished by paying for the budgeted costs of dealing with risks, as predicted in the project risk assessment.E B and C
考题
129 Quality control charts show a characteristic of the product or service against:A. the specification limits.B. customer requirements.C. control limits based on three standard deviations in each direction.D. control limits based on six standard deviations in each direction.E. A and D only
考题
() the passage, what does the author really want to inform. us?
A、according toB、due toC、Based toD、In light of
考题
93 The type of contract (payment mechanism) chosen for a project is often a reflection of the degree of risk associated with completing that project. For a firm fixed price contract, payment for risk _____ .A. Is accomplished by paying the actual costs to the contractor.B. Is accomplished by paying the contractor for his costs plus a fixed fee (profit).C. Is an undisclosed contingency in the contractor's bid.D. Is accomplished by paying for the budgeted costs of dealing with risks, as predicted in the project risk assessment.E. B and C
考题
175 Quality control charts show a characteristic of the product or service against:A. the specification limitsB. customer requirementsC. control limits based on three standard deviations in each directionD. control limits based on six standard deviations in each directionE. A and D only
考题
On which options are standard access list based?()
A. source address and subnet maskB. destination address and wildcard maskC. source address and wildcard maskD. destination address and subnet mask
考题
Which of the following is true of formative assessment?A.Mainly based on testing.
B.Done mostly at the end of a learning period.
C.Mainly for testing students’knowledge and skill.
D.Focused on students’learning progress.
考题
A/An __________language test, such as IELTS or TOEFL, is developed on the basis of a fixed standard.
A.norm-referenced
B.peer-referenced
C.individual-referenced
D.criterion-referenced
考题
Which of the following is true of formative assessment ( )
A. Mainly based on testing.
B. Done mostly at the end of a learning period.
C. Mainly for testing students’ knowledge and skill.
D. Focused on the progress of students.
考题
Which of the following is true of formative assessment ( )
A、 Mainly based on testing.
B、 Done mostly at the end of a learning perioD、
C、 Mainly for testing students’ knowledge and skill.
D、 Focused on the progress of students.
考题
“Pay to ABC CO. or order the sum of one thousand US dollars provided that the goods they supply are up to the standard.”该汇票是仍是有效汇票。A对B错
考题
In the plan phase, network readiness assessment addresses which customer need? Select exactly 1 answer(s) from the following:()。A、an assessment of the preparedness of the customers existing system infrastructure to support a propose solutionB、a comprehensive design that has been customized based on the operations processes, network management processes, and tools of its systemC、an in-depth assessment of the operational environment required to support the operation of both the current and planned solutionsD、the optimal technologies for supporting its business requirements and objectives
考题
“Pay to ABC CO. or order the sum of one thousand US dollars provided that the goods they supply are up to the standard.”该汇票是仍是有效汇票。
考题
The political system of the US is based on the following except ()A、federalismB、the constitutional monarchyC、the separation of powersD、respect for the constitutionE、the rule of law
考题
What is the maximum number of CTI ports for a Cisco Unified Contact Center Express 4.0 Standard deployment? ()A、150 B、200 C、300 D、varies based on the number of expansion servers used E、varies based on the number of applications configured
考题
On which options are standard access list based?()A、source address and subnet maskB、destination address and wildcard maskC、source address and wildcard maskD、destination address and subnet mask
考题
Which two statements about the Wi-Fi Multimedia (WMM) standard are true?()A、 Lower-priority traffic is assigned short interframe wait-timers to allow higher-priority traffic access to the wireless network first.B、 Packets that are not assigned to a specific access category are categorized by default as the background access category.C、 The WMM standard was implemented after the 802.11e standard was approved to provide support for non 802.11e devices.D、 WMM is a Wi-Fi Alliance standard that was implemented before the 802.11e standard was approved.E、 WMM uses Enhanced DCF (EDCF) to stipulate fixed and random wait times for the different access classes.
考题
单选题The political system of the US is based on the following except ()A
federalismB
the constitutional monarchyC
the separation of powersD
respect for the constitutionE
the rule of law
考题
单选题A/An _____language test, such as IELTS or TOEFL. is developed on the basis of a fixed standard.A
individual-referencedB
peer-referencedC
norm-referencedD
criterion-referenced
考题
单选题The()provides the link between the Space Segment and the land-based National/International fixed communications networks.A
VHFB
SARTC
NAVTEXD
LES
考题
单选题It is absurd to think that God would set us _____ for failure, establishing a standard that not one of us could possibly meet.A
asideB
downC
onD
up
考题
单选题Which feature is added when upgrading from IPCC Express Standard to Enhanced?()A
text chat B
Log Out/Not Ready reason codes C
WrapUp State D
WrapUp timer E
competency-based routing
考题
单选题In the plan phase, network readiness assessment addresses which customer need? Select exactly 1 answer(s) from the following:()。A
an assessment of the preparedness of the customers existing system infrastructure to support a propose solutionB
a comprehensive design that has been customized based on the operations processes, network management processes, and tools of its systemC
an in-depth assessment of the operational environment required to support the operation of both the current and planned solutionsD
the optimal technologies for supporting its business requirements and objectives
考题
单选题__________assessment is based on a fixed standard that is usually the ultimate goal which the students are expected to achieve at the end of the course.A
Criterion-referencedB
Norm-referencedC
SummativeD
Diagnostic
考题
单选题What is the maximum number of CTI ports for a Cisco Unified Contact Center Express 4.0 Standard deployment? ()A
150 B
200 C
300 D
varies based on the number of expansion servers used E
varies based on the number of applications configured
考题
单选题Methods of classroom assessment include teacher assessment, ____.A
parents assessment and self-assessmentB
questionnaires and awardsC
moral assessment and quantitative surveysD
self-assessment and peer assessment
热门标签
最新试卷