网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
If two AC generators are operated in parallel, the load is distributed evenly by()
A

a rheostat

B

a balancing coil

C

changing field excitation

D

adjusting the governor settings


参考答案

参考解析
解析: 暂无解析
更多 “单选题If two AC generators are operated in parallel, the load is distributed evenly by()A a rheostatB a balancing coilC changing field excitationD adjusting the governor settings” 相关考题
考题 How many generators does the shuttle carry?A.One.B.Two.C.Three.D.Four.

考题 ( ) can provide an asynchronous link between two ac electric power system with different nominal frequencies. A.The HVDC (high voltage DC) transmissionB.The EHV (extra-high voltage) AC transmissionC.The AC distributionD.Generators

考题 You are attempting to parallel two AC.generators, and the synchroscope pointer revolving in the fast direction.This indicates that the frequency of the incoming machine is A.higher than the bus equencyB.lower than the bus equencyC.the same as the bus frequency but out of phase with itD.same as the bus frequency and the circuit breaker may be closed at

考题 In which two scenarios do you use SQL* Loader to load data?() A. Transform the data while it is being loaded into the database.B. Use transparent parallel processing without having to split the external data first.C. Load data into multiple tables during the same load statement.D. Generate unique sequential key values in specified columns.

考题 When the prime movers of two paralleled generators are equipped with mechanical-hydraulic governors, and are operating within their designed range, the unit with the least amount of speed droop will .A.pick up more of any increase in loadB.pick up less of any increase in loadC.share an equal amount of any increase in loadD.drop an equal amount of any decrease in load

考题 You are attempting to parallel two AC generators and the synchroscope pointer is revolving in the slow direction. This indicates that the frequency of the incoming machine isA.higher than the bus frequencyB.lower than the bus frequencyC.file same as file bus frequency but out of phase with itD.the same as the bus frequency, and the circuit breaker may be closed at nay pointer position

考题 While paralleling two AC generators using synchronizing lamps only, both lamps will go dark when the generators are______.A.running at the same speedB.groundedC.of the same polarityD.in phase

考题 The load sharing characteristics of two diesel generators operating in parallel are mostly dependent on their governor ______.A.load limit settingsB.idle speed settingsC.speed limit settingsD.speed droop settings

考题 Which data synchronization options between two geographical locations are supported by PowerHA SystemMirror?()A、Parallel and SerialB、Serial and AsynchronousC、Parallel and SynchronousD、Synchronous and Asynchronous

考题 单选题The division of the kilowatt load between two AC generators operating in parallel is controlled by the settings and characteristics of the ().A voltage regulatorsB field rheostatsC reverse power relaysD prime mover governors

考题 单选题Which is a function of the voltage regulators used with AC generators?()A To cut out generators when they are no longer requiredB To cut in additional generators automatically as requiredC To divide the KW load equally between generators operating in parallelD To divide reactive current between generators operating in parallel

考题 单选题The load between two steam-driven alternators operating in parallel may be adjusted by varying ()A the speed of the alternatorsB the field strength of the machinesC the power factor of the alternatorsD steam supply to the prime movers

考题 单选题Generators should have an excitation/voltage regulation system which will enable them to share the steady state reactive load () no machine exceeds its proportional share of reactive load by more than 10% of the rated reactive load of the largest generator.A whenB so asC such thatD though

考题 单选题While paralleling two AC generators using synchronizing lamps only, both lamps will go dark when the generators are ().A running at the same speedB groundedC of the same polarityD in phase

考题 多选题In which two scenarios do you use SQL* Loader to load data?()ATransform the data while it is being loaded into the database.BUse transparent parallel processing without having to split the external data first.CLoad data into multiple tables during the same load statement.DGenerate unique sequential key values in specified columns.

考题 单选题When the prime movers of two paralleled generators are equipped with mechanical- hydraulic governors, and are operating within their designed range, the unit with the least amount of speed droop will ().A pick up more of any increase in loadB pick up less of any increase in loadC share an equal amount of any increase in loadD drop an equal amount of any decrease in load

考题 单选题The load sharing characteristics of two diesel generator operating in parallel are mostly dependent on their governor ().A load limit settingsB idle speed settingsC speed limit settingsD speed droop settings

考题 单选题Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()A SensitivityB PowerC Speed droopD Compensation

考题 单选题On commonly used ships,if two A√Cgenerators are operated in parallel, the load is distributed evenly by ().A varying the D-Cexciter voltageB varying the reluctance of the air gapC regulating the speed of prime moverD shorting out part of the armature windings

考题 单选题When two DC generators operate in parallel, they are protected against motorizing by()A blow out coilsB governor relayC under voltage tripsD reverse current trips

考题 单选题If two AC generators are to be operated in parallel, the load is distributed evenly by()A means of rheostat the governor settingsB a balance coil excitationC adjusting the governor settingsD changing excitation

考题 单选题You are attempting to parallel two AC generators, and the syncope pointer is revolving in the fast directionThis indicates that the frequency of the incoming machine is ().A higher than the bus frequencyB lower than the bus frequencyC the same as the bus frequency but out of phase with itD the same as the bus frequency and the circuit breaker may be closed at any pointer position

考题 单选题You have two EBGP peers connected via two parallel serial lines. What should you do to be able to load-balance between two EBGP speakers over the parallel serial lines in both directions? ()A nothing,BGP automatically load-balances the traffic between different autonomous systems on all available linksB peer between the eBGP speaker’s loopbacks, configuring eBGP multihop as required, and use an IGP to load-share between the two equal-cost paths between the loopback addressesC configure a loopback as update source for both EBGP peers and have on each AS an IGP to introduce two equal-cost paths to reach the EBGP peer loopback address;it is also necessary to use the next-hop-self commandD use the ebgp-load-balance command on the neighbor statement on both sidesE configure a loopback as update source for both EBGP peers and have on each AS an IGP to introduce two equal-cost paths to reach the peer loopback address;it is also necessary to use the ebgp-multihop and next-hop-self commands

考题 单选题A vessel is equipped with two ships service generatorsGenerator #1 is rated at 900kw and generator #2 is rated at 600kw.During parallel operation, with a hotel load of 1000kw, what should be the kw load on generator #2 ().A 100kwB 400kwC 500kwD 600kw

考题 单选题If two A.C.generators are to be operated in parallel, the load is distributed evenly by()A means of rheostat the governor settingsB a balance coil excitationC adjusting the governor settingsD changing excitation

考题 单选题Prior to closing the breaker when paralleling two AC generators, the recommended practice is to have the frequency of the incoming machine ()A slightly less than the line frequencyB the same as the line frequencyC slightly greater than the line frequencyD All of the above

考题 单选题When paralleling two AC generators, the frequency of the machine coming on-line, immediately prior to closing its breaker, should be ()A slightly less than the oncoming generator frequencyB the same as the bus frequencyC slightly greater than the bus frequencyD the same as the bus voltage