网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A new customer wants to install a Power 750 in a warehouse location that has no local staff to support it. They are concerned about hardware support and would like to have the system notify IBM service if there is an issue.Which actions will address the customer concern?()
A

Enable automatic problem reporting from smit

B

Use IVM to enable console mirroring to IBM Remote Support.

C

Use the HMC to enable reporting through Electronic Service Agent.

D

Enable Automatic Problem Reporting in ASMI using he embedded modem on the FSP.


参考答案

参考解析
解析: 暂无解析
更多 “单选题A new customer wants to install a Power 750 in a warehouse location that has no local staff to support it. They are concerned about hardware support and would like to have the system notify IBM service if there is an issue.Which actions will address the customer concern?()A Enable automatic problem reporting from smitB Use IVM to enable console mirroring to IBM Remote Support.C Use the HMC to enable reporting through Electronic Service Agent.D Enable Automatic Problem Reporting in ASMI using he embedded modem on the FSP.” 相关考题
考题 Natural Power Corporation owns a warehouse with an adjusted basis of $195,000 and an appraised fair market value of $185,000. The city of Springfield condemns the property for a new airport. The condemnation award is $185,000. Natural Power invests the $185,000 in a new warehouse on the other side of the city. What is the gain or loss that Natural Power Corporation must recognize due to the transactions?()A、No gain or lossB、$10,000 gainC、$10,000 lossD、$185,000 gain

考题 As you start writing, new ideas will naturally emerge, but always keep them focused on your targeted customer, so you won't go off the track of what your customer wants.

考题 A customer has purchased a new Junos Pulse Access Control Service and wants to install it in an existing cluster.After initial configuration, the customer finds that the firmware version running on the Junos Pulse Access Control Service is 4.1 r5, but the existing cluster is running firmware version 4.1 r3.Which two actions must be performed to allow the new Junos Pulse Access Control Service to load the older version of firmware?()A. Install a valid license on the new Junos Pulse Access Control Service.B. When loading the older firmware, delete all the existing data on the Junos Pulse Access Control Service.C. Add the new Junos Pulse Access Control Service to the existing cluster.D. Download the 4.1 r3 version firmware from the Juniper support website.

考题 A customer has many RS/6000s and POWER4 systems running different AIX applications.  What should the customer do to best position themselves for the migration to POWER5?()A、Upgrade OS to AIX 5.2.B、Implement Micro-Partitioning.C、Upgrade HMC to support POWER5.D、Install Partition Load Manager.

考题 A customer is planning to implement a new x445 in their datacenter.Which TWO of the following should the customer prepare prior to the implementation to ensure a trouble free installation?()A、Install the exhaust fan on top of the IBM NetBAY 42 Enterprise rack for extra coolingB、Ensure a 260V power source for the x445 and BladeCenter is available for fully redundant powerC、Ensure a 220v power source for the x445 is available for fully redundant powerD、Install the new 10GBit Ethernet network to take advantage of the new network switch in the x445.E、Have their Network Operation Staff review and assist connecting the new server to their existing network.

考题 customer wants to network several computers within a large warehouse. The warehouse has one computer at the very far end of the warehouse that is 170 meters (557 feet) from the network switch. Which of the following cable types should a technician use for this computer?()A、CAT3B、CAT5C、CAT6D、Fiber

考题 The technician is working on a system and has determined that the hard drive must be reimaged. However, the customer wants to retain all the data. Which of the following would take the LEAST amount of time to implement?()A、Create a new partition on the hard drive, copy all data to the new partition, reimage the drive, and the old data will be on the new partition and accessible.B、Install a new hard drive, slave the old drive, image the new drive, and show the customer how to access their data on the old drive.C、Upload the data to an external FTP server, reimage the drive, and then restore the data to the newly imaged drive.D、Copy data to a USB connected hard drive, reimage the drive, and then restore the data to the newly imaged drive.

考题 A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system.  How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()A、 Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.B、 Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.C、 Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.D、 Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.

考题 A customer wants to expand their current storage environment, but has floor space for only two machine frames or two racks. Their environment consists of IBM SAN Volume Controllers and IBM DS4000 systems. The DS4000 systems are at end of lease. The customer wants the maximum number of disks possible in two frames. Which of the following solutions is best for this customer?()A、add one SVCB、install one DS8700C、install one DS8800D、install one XIV system

考题 A customer wants to take advantage of IBM’s Micro-Partitioning capabilities for their new AIX applications.   The pSeries technical specialist should recommend purchasing which of the following?()A、p5 hardware, AIX 5.2, Virtual I/O ServerB、POWER4 hardware, AIX 5.3, Virtual I/O Server,C、p5 hardware, AIX 5.3, Advanced POWER Virtualization featureD、POWER4 hardware, AIX 5.2, Advanced POWER Virtualization feature

考题 A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility.  Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()A、 PowerVM Standard Edition on POWER6 hardwareB、 PowerVM Standard Edition with POWER5 hardware C、 PowerVM Enterprise Edition with POWER6 hardwareD、 PowerVM Enterprise Edition with POWER5 hardware

考题 A customer has a new Power 720 with PowerVM Standard Edition.  They plan to migrate their single-partition POWER5 550 to the new Power 720.   How can the customer migrate from the POWER5 550 to the Power 720 with minimal effort and down time?()A、Perform Live Partition Mobility between the two systems.B、Move the boot disks from the old system to the new system.C、Use Tivoli Storage Manager to back up the POWER5 550 and restore on the Power 720.D、Upgrade AIX to the latest level on the POWER5 550 and clone using the mksysb command.

考题 A customer requires two 12X loops on their new POWER7 system. What is the smallest system that will support two loops?()A、Power 710B、Power 720C、Power 730D、Power 740

考题 A customer has been quoted a DS8800. Which part of the TDA process would ensure that there isenough power in the customer location to operate the system?()A、 Pre-sale B、 Post-sale C、 Pre-install D、 Post-install

考题 A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()A、Purchase a second HMC and use this to manage the new servers.B、Connect all of the new servers to the existing private HMC network.C、Configure a second private network on their existing HMC for the new servers.D、Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.

考题 Companycom wants the application server LPAR to communicate with the database LPAR on a p5 590 without using network adapters. What does the customer need to install?()A、VIO ServerB、AIX 5.2 ML4C、Shared Ethernet AdapterD、AIX 5.3 with Advanced Power Virtualization

考题 A customer with an IBM Power System running AIX is using an IBM System Storage DS8100 inLocation A, and an IBM System Storage DS5100 in Location B. The distance between Location Aand Location B is 25 kilometers. The customer wants a redundant copy of the data inLocation Bfor disaster recovery. Which of the following solutions will best satisfy this requirement?()A、install FlashCopy on the DS8100 B、install SAN Volume Controllers with FlashCopyC、install SAN Volume Controllers with Metro Mirror D、install Global Mirror on the DS8100 and Enhanced Remote Mirror on the DS5100 

考题 A customer has the following equipment installed in their data center:  (1)an IBM BladeCenter H chassis (2)two power supplies  (3)six HS22V blades (4)three Nortel 1/10 GB ESMs The retail customer purchased a new HX5 with MAX5.  Which of the following must be added to install the HX5 with MAX5?()A、Two additional power suppliesB、Fibre Channel (FC) switches and SAN storageC、A Nortel 1/10 GB ESMD、SSD for the HX5

考题 A customer has a pSeries that needs to be upgraded from AIX Version 5.1 to AIX Version 5.2. The customer wants to retain /etc/passwd. Which of the following installation types should be used?()A、Preservation InstallB、Retention InstallC、Overwrite InstallD、Migration Install

考题 An IT director needs to deploy 3 partitions, each using dedicated internal boot disk. Which system will support the customer requirement using the least amount of rack space?()A、Power 770 serversB、Power 750 serversC、Power 755 serversD、Power 720 servers

考题 单选题A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system.  How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()A  Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.B  Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.C  Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.D  Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.

考题 单选题customer wants to network several computers within a large warehouse. The warehouse has one computer at the very far end of the warehouse that is 170 meters (557 feet) from the network switch. Which of the following cable types should a technician use for this computer?()A CAT3B CAT5C CAT6D Fiber

考题 单选题A customer has been quoted a DS8800. Which part of the TDA process would ensure that there isenough power in the customer location to operate the system?()A  Pre-sale B  Post-sale C  Pre-install D  Post-install

考题 单选题A customer wants to install a pSeries system into an OEM rack.  What critical information is provided in the Site and Hardware Planning Information manual?()A System dimensions and weight, system power and cooling requirements, and list of supported OEM racksB System dimensions and weight, list of supported OEM racks, and requirements for installing IBM systems into OEM racksC System performance specs, system power and cooling requirements, and requirements for installing IBM systems into OEM racksD System dimensions and weight, system power and cooling requirements, and requirements for installingIBM systems into OEM racks

考题 单选题A customer wants to migrate their existing cluster onto new POWER6 hardware, and in addition requires thecluster to be migrated from PowerHA version 5.3 to 5.5. Given that AIX 6.1 and PowerHA 5.5 filesets arealready installed in the new hardware, which of the following methods would allow the customer to maintaintheir current cluster configuration?()A Add the new nodes to the existing cluster, and perform a rolling migration and remove the original nodesfrom the clusterB Add the new nodes to the existing cluster, and perform a non-disruptive upgrade and remove the originalnodes from the cluster.C Create a snapshot of the existing cluster and apply the snapshot to the new cluster. Start cluster serviceson the new cluster and stop the original clusterD Create a snapshot of the existing cluster and apply the snapshot to the new cluster. Stop cluster serviceson the original cluster and start on the new cluster

考题 单选题A customer wants to take advantage of IBM’s Micro-Partitioning capabilities for their new AIX applications.   The pSeries technical specialist should recommend purchasing which of the following?()A p5 hardware, AIX 5.2, Virtual I/O ServerB POWER4 hardware, AIX 5.3, Virtual I/O Server,C p5 hardware, AIX 5.3, Advanced POWER Virtualization featureD POWER4 hardware, AIX 5.2, Advanced POWER Virtualization feature

考题 单选题A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers.  The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server.  How can the specialist help the customer?()A Explain to the customer that they need an additional HMC for the POWER5 system.B Obtain a PO from the customer to purchase additional serial connections to the HMC.C Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.D Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.