A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()
- A、 Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.
- B、 Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.
- C、 Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.
- D、 Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.
参考答案
更多 “ A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()A、 Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.B、 Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.C、 Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.D、 Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.” 相关考题
考题
A customer has 4 POWER6 servers managed by a Hardware Management Console (HMC). They plan to install a second HMC for redundancy. Which of the following statements correctlydescribes the dual HMC environment? ()A、 To provide the Service Agent function, both HMCs must have Service Agent enabled and a dedicated modem and phone line.B、 Authorized users must have the same username and password on both HMCs, so that every user of one HMC is automatically authorized on the other.C、 Both HMCs are automatically notified of any changes that occur in the managed systems, so results of changes made to the managed system by one HMC are visible on theD、 Both HMCs must be running the same software revision. Software maintenance must be performed on both HMCs at the same time, but one HMC should be disconnected from
考题
The customer intends to install a 7315-CR2 into a p690 frame. What should the pSeries technical specialist tell the customer?()A、The HMC is a 19" form factor.B、The HMC is a 24" form factor.C、The HMC requires a 100-120 volt power connection.D、The HMC requires a 200-240 volt power connection.
考题
An administrator wants to query the CPU resources of the managed system 9117-MMA*6512345 from the Hardware Management Console (HMC) command line. Which of the following HMC commands could achieve this?()A、 lssysres -r cpu -m 9117-MMA*6512345 -r sysB、 lssyscfg -r proc -m 9117-MMA*6512345 -r sysC、 lshwres -r proc -m 9117-MMA*6512345 --level sysD、 lshwcfg -r proc -m 9117-MMA*6512345 --level sys
考题
A Power Systems customer would like to upgrade their HMC to the latest version of software tosupport a new hardware feature. What resource will help identify dependencies for firmware and system software for their upgrade?()A、ITSO RedbooksB、Facts and FeaturesC、System Planning ToolD、Fix Level Recommendation Tool
考题
Which of the following can deploy system plans generated by the IBM System Planning Tool (SPT)?()A、 The Hardware Management Console (HMC) and Integrated Virtualization Manager (IVM).B、 The Hardware Management Console (HMC) and Advanced System Manager Interface (ASMI).C、 Integrated Virtualization Manager (IVM) and Advanced System Manager Interface (ASMI).D、 Integrated Virtualization Manager (IVM) and BladeCenter Advanced Management Module (AMM).
考题
Prior to implementing an LPAR system, which of the following needs to be done?()A、A graphics monitor must be attached to the serverB、Cluster System Management (CSM) software must be installedC、The LPAR system must have an Hardware Management Console (HMC) connectedD、Each LPAR must be configured with a CDROM for operating system installation
考题
A customer has a wide range of IBM enterprise disk systems and wants to manage copy services functions. Which of the products should the storage specialist recommend to this customer()A、DS Hardware Management Console (HMC), because it manages ESS 800, DS6000, DS8000, and SVC storage serversB、Tivoli Storage Productivity Center for Data, because it manages ESS 800, DS6000, DS8000, and SVC storage serversC、Tivoli Storage Productivity Center for Replication, because it manages ESS 800, DS6000, DS8000, and SVC storage serversD、External DS Hardware Management Console (HMC), because it manages ESS 800, DS6000, DS8000, and SVC storage servers
考题
A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()A、 vmstat and iostat data from the older machines B、 The number of CPUs that were installed in the original machines C、 Data from Workload Estimator (WLE) and IBM Performance Management (PM) D、 Performance data that is collected from the new system after it has been put into production
考题
Which one of these statements is true regarding hot pluggable PCIe and PCI-X slots in a Power 550?()A、Cards can be added and then enabled via Hardware Management Console (HMC) GUI or command line. B、The HMC allows access to the Advanced System Management Interface (ASMI), where the slots can be managed. C、If the empty slot was already allocated to an LPAR, the LPAR can use the card after the cfgmgr script has been run. D、The Hardware Management Console (HMC) GUI can guide a customer through the process of adding a card to an empty slot.
考题
A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()A、All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or laterB、The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMCC、They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based systems connected to the existing oneD、The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM
考题
A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()A、Purchase a second HMC and use this to manage the new servers.B、Connect all of the new servers to the existing private HMC network.C、Configure a second private network on their existing HMC for the new servers.D、Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.
考题
A customer plans to order several new pSeries systems and is concerned that the additional heat load may overwhelm the current air-handling system. How might the pSeries technical specialist aid the customer in addressing their concern?()A、Direct the customer to the Installation Guide for each system to identify the power requirements.B、Direct the customer to engage their site personnel to ensure the proper power connectors are provided to support the systems.C、Direct the customer to the Site and Hardware Planning Information and review the system requirements for each new pSeries system.D、Direct the customer to the Site and Hardware Planning Information to confirm that enough space is available in the rack to allow for proper airflow.
考题
Which of the following is a feature of Integrated Virtualization Manager (IVM)? ()A、 It has a GUI interface for upgrading system firmware. B、 It creates and manages AIX/Linux and VIOS type LPARs. C、 It can be managed by the Hardware Management Console (HMC). D、 It supports Live Partition Mobility on POWER6 systems and above.
考题
A customer currently has five partitioned POWER4 systems and is adding new systems. When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()A、Order a new HMC to support the p5 system.B、Attach the new p5 system to the existing HMC.C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.D、Do nothing. This system does not require an HMC.
考题
A new customer wants to install a Power 750 in a warehouse location that has no local staff to support it. They are concerned about hardware support and would like to have the system notify IBM service if there is an issue.Which actions will address the customer concern?()A、Enable automatic problem reporting from smitB、Use IVM to enable console mirroring to IBM Remote Support.C、Use the HMC to enable reporting through Electronic Service Agent.D、Enable Automatic Problem Reporting in ASMI using he embedded modem on the FSP.
考题
A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers. The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server. How can the specialist help the customer?()A、Explain to the customer that they need an additional HMC for the POWER5 system.B、Obtain a PO from the customer to purchase additional serial connections to the HMC.C、Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.D、Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.
考题
Which of the following should be done FIRST when setting up a new p5-520 to be managed by a new HMC via a private network?()A、Change passwords in ASMIB、Add the managed system to the HMCC、Connect the p5-520 to a power sourceD、Connect the HMC and the p5-520 server’s HMC1 port to the same network
考题
单选题Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()A
Order a POWER5 HMCB
Connect to the existing HMCC
Install an 8-port asynchronous card in the managed server to connect to the existing HMCD
Install an additional network card to the existing HMC and connect to the POWER5 service processor
考题
单选题Prior to implementing an LPAR system, which of the following needs to be done?()A
A graphics monitor must be attached to the serverB
Cluster System Management (CSM) software must be installedC
The LPAR system must have an Hardware Management Console (HMC) connectedD
Each LPAR must be configured with a CDROM for operating system installation
考题
单选题Which of the following can deploy system plans generated by the IBM System Planning Tool (SPT)?()A
The Hardware Management Console (HMC) and Integrated Virtualization Manager (IVM).B
The Hardware Management Console (HMC) and Advanced System Manager Interface (ASMI).C
Integrated Virtualization Manager (IVM) and Advanced System Manager Interface (ASMI).D
Integrated Virtualization Manager (IVM) and BladeCenter Advanced Management Module (AMM).
考题
单选题Which one of these statements is true regarding hot pluggable PCIe and PCI-X slots in a Power 550?()A
Cards can be added and then enabled via Hardware Management Console (HMC) GUI or command line. B
The HMC allows access to the Advanced System Management Interface (ASMI), where the slots can be managed. C
If the empty slot was already allocated to an LPAR, the LPAR can use the card after the cfgmgr script has been run. D
The Hardware Management Console (HMC) GUI can guide a customer through the process of adding a card to an empty slot.
考题
单选题A customer has 4 POWER6 servers managed by a Hardware Management Console (HMC). They plan to install a second HMC for redundancy. Which of the following statements correctlydescribes the dual HMC environment? ()A
To provide the Service Agent function, both HMCs must have Service Agent enabled and a dedicated modem and phone line.B
Authorized users must have the same username and password on both HMCs, so that every user of one HMC is automatically authorized on the other.C
Both HMCs are automatically notified of any changes that occur in the managed systems, so results of changes made to the managed system by one HMC are visible on theD
Both HMCs must be running the same software revision. Software maintenance must be performed on both HMCs at the same time, but one HMC should be disconnected from
考题
单选题A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()A
vmstat and iostat data from the older machines B
The number of CPUs that were installed in the original machines C
Data from Workload Estimator (WLE) and IBM Performance Management (PM) D
Performance data that is collected from the new system after it has been put into production
考题
单选题Which of the following is a feature of Integrated Virtualization Manager (IVM)? ()A
It has a GUI interface for upgrading system firmware. B
It creates and manages AIX/Linux and VIOS type LPARs. C
It can be managed by the Hardware Management Console (HMC). D
It supports Live Partition Mobility on POWER6 systems and above.
考题
单选题An administrator wants to query the CPU resources of the managed system 9117-MMA*6512345 from the Hardware Management Console (HMC) command line. Which of the following HMC commands could achieve this?()A
lssysres -r cpu -m 9117-MMA*6512345 -r sysB
lssyscfg -r proc -m 9117-MMA*6512345 -r sysC
lshwres -r proc -m 9117-MMA*6512345 --level sysD
lshwcfg -r proc -m 9117-MMA*6512345 --level sys
考题
单选题A Power Systems customer would like to upgrade their HMC to the latest version of software tosupport a new hardware feature. What resource will help identify dependencies for firmware and system software for their upgrade?()A
ITSO RedbooksB
Facts and FeaturesC
System Planning ToolD
Fix Level Recommendation Tool
考题
单选题A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()A
Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.B
Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.C
Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.D
Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.