How many BladeCenter HT chassis will fit in a standard 19" 42U rack?()
A

2. 

B

3 

C

4 

D

6


参考答案

参考解析
解析: 暂无解析
更多 “单选题How many BladeCenter HT chassis will fit in a standard 19" 42U rack?()A 2. B 3 C 4 D 6” 相关考题
考题 How many orders are included in standard ship orders? Can you list some?

考题 IBM PS700 适用于哪些刀片机箱?()A、BladeCenter EB、BladeCenter TC、BladeCenter SD、BladeCenter HE、BladeCenter HT

考题 A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. Theustomer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy? ()A、12 B、10 C、8 D、6

考题 ()has the ship?A、How much hatchesB、How much hatchC、How many hatchD、How many hatches

考题 How many paging requests can, at the most, fit into one paging block?()A、10B、20C、4D、60E、80

考题 What is the maximum number of CTI ports for an IPCC Expess Standard deployment? ()A、150 B、200 C、300 D、Depends upon how many expansion servers are used E、Depends upon the number of applications configured

考题 How many wire pairs are in a standard CAT6 cable?()A、3B、4C、6D、8

考题 A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack.  Which IBM BladeCenter Chassis should be recommended? ()A、BladeCenter EB、BladeCenter HC、BladeCenter TD、BladeCenter HT

考题 A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information,  what additional items does the customer need to purchase? ()A、An IBM BladeCenter H chassis for the JS22 Blade serversB、A concurrent KVM daughter cardC、A pair of IBM BladeCenter Power SuppliesD、A second Management Module

考题 A customer has purchased an IBM BladeCenter H chassis and needs the following servers:  --Two HS21 blade servers each with 8GB memory and 2 drives   --Two HS21 blade servers each with 24GB memory and 2 drives   --Two LS21 blade servers each with 2GB memory and 2 Hot-Swap SCSI drives   How many total server bays will be required for this configuration?()A、6B、8C、10D、12

考题 A customers has asked you to investigate their current x86 server environment to determinate if they can achieve a reduction in power and rack consumption. They plan to implement VMware and the local storage shared. Which of the following consolidation proposals meets these needs?()A、BladeCenter SB、BladeCenter HC、BladeCenter ED、BladeCenter HT

考题 How many the BladeCenter HT chassis will fit in a standard 19" 42U rack?()A、2B、3C、4D、6

考题 How many BladeCenter HT chassis will fit in a standard 19" 42U rack?()A、2. B、3 C、4 D、6

考题 A BladeCenter S chassis with 2 storage modules requires how many power supplies?()A、1B、2C、4D、6

考题 A customer has a BladeCenter E installed and plans to migrate their current Blades to the BladeCenter H.  What options will migrate from the BladeCenter E to the BladeCenter H chassis? ()A、SAN Switch modulesB、BlowersC、Power suppliesD、Battery backup units

考题 问答题Kara attends a university where students study for an average (arithmetic mean) of 13.4 hours per week. How many hours per week does Kara study?  (1) The standard deviation of study time at Kara’s school is 2.8.  (2) Kara’s study time is one standard deviation away from the mean.

考题 单选题What is the maximum number of CTI ports for an IPCC Expess Standard deployment? ()A 150 B 200 C 300 D Depends upon how many expansion servers are used E Depends upon the number of applications configured

考题 单选题How many wire pairs are in a standard CAT6 cable?()A 3B 4C 6D 8

考题 单选题How many wire pairs are in a standard CAT6 cable? ()A  3B  4C  6D  8

考题 单选题What is the standard power supply that is delivered with a BladeCenter H chassis for a North American customer?()A Redundant 2900W (2 x 2900 W)B Single 2900W (1 x 2900 W)C Single 2000W (1 x 2000 W).D Redundant 2000W (2 x 2000 W)

考题 单选题A BladeCenter S chassis with 2 storage modules requires how many power supplies?()A 1B 2C 4D 6

考题 单选题A customer is considering BladeCenter H and S chassis. Which of the following is a reason to implement BladeCenter H?()A Support for10Gb internal networkB Support for SSDC Support for integrated disk drivesD Support for8Gb FC Switch Modules

考题 单选题How many the BladeCenter HT chassis will fit in a standard 19" 42U rack?()A 2B 3C 4D 6

考题 单选题A banking customer orders three IBM BladeCenter E chassis and thirty-four HS22 blades. The customer wants to fully populate the chassis with blades where possible. Which of the following is the minimum number of power cables required to provide redundancy?()A 6B 8C 10D 12

考题 单选题You want to create a template to be used as a standard for all company reports, which are many different styles. How many different templates must you have if you plan to use multiple report styles?()A Two B One C One per report styleD One per report style + one more

考题 单选题A customer is interested in reducing energy consumption and infrastructure consolidation for space. The customer needs a maximum of 14 servers in 7U rack.  Which IBM BladeCenter Chassis should be recommended? ()A BladeCenter EB BladeCenter HC BladeCenter TD BladeCenter HT

考题 问答题A truck driver wants to load as many identical cylindrical canisters of olive oil as can fit into the 3-meter×4-meter×9-meter storage space of his truck. How many canisters can he load into the truck?  (1) Each canister has a volume of 62,500π cubic centimeters.  (2) The height of each canister is four times the radius.