网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
Which of the following can occur if the maximum rated load is exceeded on an uninterruptible power supply (UPS)?()
A
There is a fire hazard potential if a power outage occurs.
B
The last system plugged into the UPS will not be provided any power.
C
The UPS will draw more power from the circuit to compensate.
D
The runtime of the UPS will be insufficient if a power outage occurs.
参考答案
参考解析
解析:
暂无解析
更多 “单选题Which of the following can occur if the maximum rated load is exceeded on an uninterruptible power supply (UPS)?()A There is a fire hazard potential if a power outage occurs.B The last system plugged into the UPS will not be provided any power.C The UPS will draw more power from the circuit to compensate.D The runtime of the UPS will be insufficient if a power outage occurs.” 相关考题
考题
Which of the following is can express “uncertainty”().
A.You said itB.What a shameC.I rather doubt itD.Unbelievable, I’d say
考题
Which of the following cable types is rated to be run through air ducts?()
A.STPB.PlenumC.PVCD.UTP
考题
Which of the following services can an administrator use to reduce latency and prioritize the flowof data?()
A. Fault toleranceB. RADIUSC. QosD. Load balancing
考题
Which of the following can occur if the maximum rated load is exceeded on an uninterruptible power supply (UPS)?()
A. There is a fire hazard potential if a power outage occurs.B. The last system plugged into the UPS will not be provided any power.C. The UPS will draw more power from the circuit to compensate.D. The runtime of the UPS will be insufficient if a power outage occurs.
考题
When a cargo boom or crane is rated at varying capacities,there will be a table at the controls which relates safe working load to ______.A.winch speedB.boom strengthC.load radiusD.cable strength
考题
Which of the following is TRUE about a caching name server?()A、They must have a trusted SSL certificateB、They can be authoritativeC、They cannot be load-balancedD、They can be recursiveE、They require DHCP
考题
Given the following expression about TextField which use a proportional pitch font. TextField t = new TextField("they are good",40); Which statement is true?() A、 The displayed string can use multiple fonts.B、 The maximum number of characters in a line will be 40.C、 The displayed width is exactly 40 characters.D、 The user can edit the characters.
考题
Which of the following is the maximum number of expansion enclosures that can be attached to anIBM Storwize V7000 Control Enclosure?()A、 6B、 9C、 12D、 18
考题
Which of the following network appliances can BEST be described as allowing multiple servers toshare requests for a website through the same public IP address?()A、VPN concentratorB、Content filterC、Load balancerD、Proxy server
考题
Which of the following services can an administrator use to reduce latency and prioritize the flowof data?()A、Fault toleranceB、RADIUSC、QosD、Load balancing
考题
Which of the following statements are true when creating NETBIOS names? ()A、 NETBIOS names can only use alphanumeric characters.B、 You can use a ’.’ in a NETBIOS name.C、 You can use an ’_’ (underscore) in a NETBIOS name.D、 NETBIOS names must be UPPERCASEE、 NETBIOS names can be a maximum of 32 characters
考题
A small office in which all workstations are using an ISP provided IP range has noticed a consistent decrease in network traffic speed. The decrease does not occur when the gateway to the ISP is disconnected. Which of the following should the administrator implement?() A、Multicast addressingB、Load balancingC、Address translationD、DHCP
考题
Which of the following cable types is rated to be run through air ducts?()A、STPB、PlenumC、PVCD、UTP
考题
A datacenter has exceeded the load on the central uninterruptible power supply (UPS) for the roomand is causing power load problems. Additional power is available, but not using the central UPS. Which of the following is the BEST temporary solution for adding new servers until an upgrade of the central UPS can occur?()A、 Continue plugging into the central UPS, but put the UPS on bypass to avoid load problems.B、 Plug the servers directly into the power that is not on the UPS.C、 Add stand alone UPSs for new servers not wired off the central UPS.D、 Continue plugging into the central UPS because the actual load supported is actually higher than stated.
考题
Which of the following can occur if the maximum rated load is exceeded on an uninterruptible power supply (UPS)?()A、 There is a fire hazard potential if a power outage occurs.B、 The last system plugged into the UPS will not be provided any power.C、 The UPS will draw more power from the circuit to compensate.D、 The runtime of the UPS will be insufficient if a power outage occurs.
考题
Which of the following technologies can provide geographically based load balancing with high availability between two web servers with static content?()A、MulticastB、Active/passive clusterC、Active/active clusterD、DNS round robin
考题
Which of the following can be used in conjunction with a Flashback Versions Query to filter the results?()A、 A range of SCN valuesB、 A list of SCN valuesC、 A starting and ending timestampD、 Minimum and maximum sequence valuesE、 A list of sequence values
考题
多选题Which of the following can be used in conjunction with a Flashback Versions Query to filter the results?()AA range of SCN valuesBA list of SCN valuesCA starting and ending timestampDMinimum and maximum sequence valuesEA list of sequence values
考题
多选题Which of the following statements are true when creating NETBIOS names? ()ANETBIOS names can only use alphanumeric characters.BYou can use a ’.’ in a NETBIOS name.CYou can use an ’_’ (underscore) in a NETBIOS name.DNETBIOS names must be UPPERCASEENETBIOS names can be a maximum of 32 characters
考题
多选题Which three statements correctly describe the features of the I/O calibration process?()AOnly one I/O calibration process can run at a timeBIt automates the resource allocation for the Automated Maintenance TasksCIt improves the performance of the performance-critical sessions while runningDIt can be used to estimate the maximum number of I/Os and maximum latency time for the systemEThe latency time is computed only when the TIMED_STATISTICS initialization parameter is set to TRUE
考题
单选题An HP customer would like to discuss IBM system advantages. Their current system platform is a partitioned HP rp8400. Which of the following pSeries systems and advantages should be discussed?()A
p630. Maximum partitions, maximum storage, I/O bus speedB
p670. Maximum partitions, maximum memory, number of I/O slotsC
p655. Maximum number of CPUs, processor speed, number of I/O slotsD
p690. Maximum number of CPUs, peak system bandwidth, peak I/O bandwidth
考题
单选题Increasing the speed of a rotary pump above its rated speed will result in which of the following conditions to occur?()A
Loss of suctionB
Increased clearancesC
Decreased clearanceD
Decreased slippage
考题
单选题Maximum horsepower of a diesel engine is attained ().A
when the engine RPM is pulled down by overloadB
at rated engine RPMC
at 95 % of rated engine RPMD
at 95 % of a properly adjusted governor RPM with the engine under full load
考题
多选题When executing the massload command to load catalog data into a WebSphere Commerce database on a remote DB2 server,which of the following can be used as valid values for the -method command line parameter?()AcreateBimportCloadDsqlimportEupdate
考题
单选题Which of the following is the maximum number of expansion enclosures that can be attached to anIBM Storwize V7000 Control Enclosure?()A
6B
9C
12D
18
考题
多选题Which of the following is TRUE about a caching name server?()AThey must have a trusted SSL certificateBThey can be authoritativeCThey cannot be load-balancedDThey can be recursiveEThey require DHCP
考题
单选题A datacenter has exceeded the load on the central uninterruptible power supply (UPS) for the room and is causing power load problems. Additional power is available, but not using the central UPS. Which of the following is the BEST temporary solution for adding new servers until an upgrade of the central UPS can occur?()A
Continue plugging into the central UPS, but put the UPS on bypass to avoid load problems.B
Plug the servers directly into the power that is not on the UPS.C
Add stand alone UPSs for new servers not wired off the central UPS.D
Continue plugging into the central UPS because the actual load supported is actually higher than stated
热门标签
最新试卷