网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
多选题
An engineer has been told to create an implementation plan to influence the choice of best BGP route on a single router using the Weight featurE. The sole Enterprise Internet - connected router, Ent 1, has neighbor relationships with Routers ISP1 and ISP2, which reside inside two different ISPs. The goal is to prefer all routes learned from ISP1 over ISP2 using Weight. Which of the following answers lists a configuration step that would not be usefu l for achieving these goals?()
A
Configuring the neighbor weight command on Ent1.
B
Having the ISPs configure the neighbor route - map out command on ISP1 and ISP2, with the route map setting weight.
C
Configuring the set weight command inside a route map on Router Ent1.
D
Configuring a prefix list to match all class C networks.
参考答案
参考解析
解析:
暂无解析
更多 “多选题An engineer has been told to create an implementation plan to influence the choice of best BGP route on a single router using the Weight featurE. The sole Enterprise Internet - connected router, Ent 1, has neighbor relationships with Routers ISP1 and ISP2, which reside inside two different ISPs. The goal is to prefer all routes learned from ISP1 over ISP2 using Weight. Which of the following answers lists a configuration step that would not be usefu l for achieving these goals?()AConfiguring the neighbor weight command on Ent1.BHaving the ISPs configure the neighbor route - map out command on ISP1 and ISP2, with the route map setting weight.CConfiguring the set weight command inside a route map on Router Ent1.DConfiguring a prefix list to match all class C networks.” 相关考题
考题
There has been a sudden drop in retail sales, ()?
A、does itB、hasn’t thereC、has thereD、doesn’t there
考题
I don't understand what the engineer means, but I’ve got rough idea ofProject plan.A. the; a B. 不填; theC. the;不填 D. a ; the
考题
______ many times, but he still couldn't understand it.A. Having been toldB. He was toldC. Though he had been toldD. Having told
考题
He told me that he ____ in Naples the previous year.A、has been workingB、has workedC、had been workingD、had been worked
考题
Within the team, a work plan can tell each member what()and why.A. is being doneB. has doneC. has been done
考题
下面程序段的输出结果是( )。A.t has been created.B.t has been created. t is running.C.t is running.D.编译出错
考题
An engineer is preparing an implementation plan in which the configuration needs to influence BGP‘s choice of best path.Which of the following is least likely to be used by the configuration in this imple mentation plan?()A. WeightB. Origin codeC. AS_PathD. Local_Pref
考题
Refer to the exhi bit. ROUTE.com is planning to implement load balancing for traffic between host on the 172.16.10.0/24 and 172.16.20./24 networks. You have been asked to review the implementation plan for this project. Which statement about the plan is true?()A. It is complete as written.B. It should include a task to configure multipath to equal a value of 2 on R1 and R4.C. It should use a ping instead of a traceroute to validate that load balancing has been activated.D. It should conta in a task that documents the changes made to the configurations.
考题
Refer to the exhibit. ROUTE.com is planning to implement load balancing for traffic between hosts on the 172.16.10.0/24 and 172.16.20./24 networks. You have been ask ed to review the implementation plan for this project. Which statement about the plan is true?()A. It is complete as written.B. It should include a task to configure EIGRP multipath equal to 2 on R1 and R4.C. It should inc lude a task to implement OSPF because it handles unequal cost load balancing most efficiently using variance.D. It should include a task that establishes a baseline before and after the configuration has been changed.
考题
The notice has been told everyone __________ a party will be held in the open air tomorrow.A.whether
B.when
C.where
D.that
考题
The manager __________the workers how to improve the program since 9 a.m.A.has told
B.is telling
C.has been telling
D.will have told
考题
It has always been our company's ( ) to encourage employeesto use their talents and create more wealth.
A. policy
B. procedure
C. campaign
D. Plan
考题
I want to buy that kind of cloth because I( )the cloth ( ) well.
A. have told; washes
B. have been told; washes
C. was told; washed
D. have been told; is washed
考题
Which definition best describes the implementation service component within the implement phase? Select exactly 1 answer(s) from the following:()。A、providing a step-by-step plan that details the installation and service-commission tasks required in order to create a controlled-implementation environment that emulates a customer networkB、assessing the ability of site facilities to accommodate proposed infrastructure changesC、developing and executing proof-of-concept tests, validating high-level infrastructure design, and identifying any design enhancementsD、installing, configuring, and integrating systems components based on an implementation plan developed in earlier phasesE、improving a customer’s infrastructure security system
考题
Enterprise Router R1 connects an Enterprise to the Internet. R1 needs to create and advertise a default route into the Enterprise using EIGRP. The engineer creating the implementation plan has chosen to base this default route on the ip route command, rather than using i p default - network. Which of the following is not a useful step with this style of default route configuration?()A、Create the default route on R1 using the ip route 0.0.0.0 0.0.0.0 outgoinginterface command.B、Redistribute the statically configured defa ult route.C、Disable auto - summary.D、Configure the network 0.0.0.0 command.E、Ensure R1 has no manually configured summary routes using the ip summary- address eigrp command.
考题
An Information Technology (IT) staff has many calls from users who are unable to print or who lose print jobs. After investigation, the IT staff has determined that the print spooler is stopping sporadically. Which of the following actions in IBM Director would best resolve the issue?()A、Create an Event Action Plan to monitor the NT Event Log for Print Spooler errors.Set a task to restart the print spooler when stopped.Apply this plan to print servers.B、Using Event Management, create an Event Action Plan with a print spooler filter and set a task to restart the print spooler when stopped. Apply this plan to print servers.C、Using Resource Manager, create a threshold to monitor the print spooler queue.Create an Event Action Plan with a print spooler filter and set a task to restart the print spooler when the queue gets above 10 jobs.Apply this plan to print servers.D、Using Process Management, create a threshold to monitor to set an error condition when the print spooler has stopped.Create an Event Action Plan using this filter and create a task to restart the print spooler when stopped. Apply plan to print servers.
考题
There has been a positive response to the export promotion()?A、hasn’t itB、hasn’t thereC、doesn’t itD、has there
考题
An engineer is preparing an implementation plan in which the configuration needs to influence BGP's choice of best path. Which of the following is least likely to be used by the configuration in this imple mentation plan?()A、WeightB、Origin codeC、AS_PathD、Local_Pref
考题
多选题Enterprise Router R1 connects an Enterprise to the Internet. R1 needs to create and advertise a default route into the Enterprise using EIGRP. The engineer creating the implementation plan has chosen to base this default route on the ip route command, rather than using i p default - network. Which of the following is not a useful step with this style of default route configuration?()ACreate the default route on R1 using the ip route 0.0.0.0 0.0.0.0 outgoinginterface command.BRedistribute the statically configured defa ult route.CDisable auto - summary.DConfigure the network 0.0.0.0 command.EEnsure R1 has no manually configured summary routes using the ip summary- address eigrp command.
考题
单选题The company’s ______ regarding casual dress has been revised in order to create a friendly working environment.A
policyB
preparationC
symbolD
customs
考题
单选题You are planning a new VLAN-based network solution. What is one item you should consider when creating your implementation plan as it concerns VLANs?()A
generic router and switch configuration parametersB
end-to-end test plan after all components have been installed and configuredC
administrator assignmentsD
rollback plan
考题
单选题An Information Technology (IT) staff has many calls from users who are unable to print or who lose print jobs. After investigation, the IT staff has determined that the print spooler is stopping sporadically. Which of the following actions in IBM Director would best resolve the issue?()A
Create an Event Action Plan to monitor the NT Event Log for Print Spooler errors.Set a task to restart the print spooler when stopped.Apply this plan to print servers.B
Using Event Management, create an Event Action Plan with a print spooler filter and set a task to restart the print spooler when stopped. Apply this plan to print servers.C
Using Resource Manager, create a threshold to monitor the print spooler queue.Create an Event Action Plan with a print spooler filter and set a task to restart the print spooler when the queue gets above 10 jobs.Apply this plan to print servers.D
Using Process Management, create a threshold to monitor to set an error condition when the print spooler has stopped.Create an Event Action Plan using this filter and create a task to restart the print spooler when stopped. Apply plan to print servers.
考题
单选题The chief engineer suggests that the second engineer () a dead line for handing in the work plan.A
will setB
shall setC
setD
sets
考题
单选题You have just created a new VLAN on your network for inter-VLAN routing. What is one step that you should include in your VLAN-based implementation and verification plan?()A
Verify that different native VLANs exist between two switches for security purposes.B
Verify that the switch is configured to allow for trunking on the switch ports.C
Verify that each switch port has the proper IP address space assigned to it for the new VLAN. D
Verify that the VLAN virtual interface has been correctly created and enabled.
考题
单选题The notice has been told everyone _____ a party will be held in the open air tomorrow.A
whetherB
whenC
whereD
that
热门标签
最新试卷