单选题
Which phase includes testing operational processes and procedures in accordance with the Cisco Unified Communications operations plan()
A
Operate
B
Design
C
Deploy
D
Implement
参考答案
参考解析
解析:
暂无解析
更多 “单选题Which phase includes testing operational processes and procedures in accordance with the Cisco Unified Communications operations plan()A OperateB DesignC DeployD Implement” 相关考题
考题
Which phase of the software development requires the most development time?A.the design phaseB.the testing phaseC.the maintenance phaseD.the development phase
考题
Black-box and white-box testing method ale often used in software testing phase, in which, the white-box is mainly used to test software's(73).A.external function of a programB.reasonableness of structureC.internal logic of a programD.correctness of a program
考题
Which of the following statements is correct?A.The definition phase results in the Software Requirements Specification.B.Testing is optional in software life cycle.C.CASE tools can only aid in the design phase of a software life cycle.D.A change during a later phase does not require the documentation of all earlier phases to be updated.
考题
●In general,atypical (71) model is composed of several phases, such as requirements analysis phase, generaUdetailed design phase, implementation phase, system acceptance testing phase.(71)A. waterfallB.incrementalC.spiralD.prototyping
考题
At sea,all required GMDSS equipment(other than survival craft equipment)must be proven operational by ______.A.daily testingB.either A or CC.operational use of the equipmentD.testing at least every 48 hours
考题
Many of the activities performed during the preliminary investigation are still being conducted in( ), but in much greater depth than before. During this phase, the analyst must become fully aware of the ( )and must develop enough knowledge about the (3) and the existing systems to enable an effective solution to be proposed and implemented. Besides the ( )for process and data of current system, the deliverable from this phase also includes the ( )for the proposed system.
(3)应选( )。
A. harD.ware environment
B. testing environment
C. software environment
D.. business environment
考题
The purpose of the systems analysis phase is to build a logical model of the new system.The first step is(71),where you investigate business processes and document what the new system must do to satisfy users. This step continues the investigation that began during the(72). You use the fact-finding results to build business models,data and process models,and object models. The deliverable for the systems analysis phase is the(73),which describes management and user requirements,costs and benefits,and outlines alternative development strategies.The purpose of the systems design phase is to create a physical model that will satisfy all documented requirements for the system. During the systems design phase,you need to determine the(74),which programmers will use to transform the logical design into program modules and code. The deliverable for this phase is the(75),which is presented to management and users for review and approval.A.system charter
B.system scope definition
C.system blueprint
D.system requirements document
考题
The purpose of the systems analysis phase is to build a logical model of the new system.The first step is(71),where you investigate business processes and document what the new system must do to satisfy users. This step continues the investigation that began during the(72). You use the fact-finding results to build business models,data and process models,and object models. The deliverable for the systems analysis phase is the(73),which describes management and user requirements,costs and benefits,and outlines alternative development strategies.The purpose of the systems design phase is to create a physical model that will satisfy all documented requirements for the system. During the systems design phase,you need to determine the(74),which programmers will use to transform the logical design into program modules and code. The deliverable for this phase is the(75),which is presented to management and users for review and approval.A.systems planning phase
B.systems modeling phase
C.systems analysis phase
D.systems design phase
考题
During the implement phase, systems acceptance testing does which of the following for the customer? Select exactly 1 answer(s) from the following:()。A、installation, configuration, and testing, as well as the commissioning of tools and processes in accordance with the operations implementation planB、provision of information regarding customer-specified design requirements and configurationC、the migration of network services from an existing state to a future state in accordance with the migration planD、the provision of an objective means of measuring system operability and functionality
考题
Which of these is a benefit of ESM?()A、supports multiple MIBsB、includesNetFlow, NBAR, and IP SLA software subsystemsC、includesNetFlow, syslog, and IP SLA software subsystemsD、includes a predefined framework for filtering and correlating messagesE、supports two logging processes so output can be sent in standard and ESM format
考题
In the plan phase, network readiness assessment addresses which customer need? Select exactly 1 answer(s) from the following:()。A、an assessment of the preparedness of the customers existing system infrastructure to support a propose solutionB、a comprehensive design that has been customized based on the operations processes, network management processes, and tools of its systemC、an in-depth assessment of the operational environment required to support the operation of both the current and planned solutionsD、the optimal technologies for supporting its business requirements and objectives
考题
Which of these is a benefit of ESM?()A、 supports multiple MIBsB、 includes NetFlow, NBAR, and IP SLA software subsystemsC、 includes NetFlow, syslog, and IP SLA software subsystemsD、 includes a predefined framework for filtering and correlating messagesE、 supports two logging processes so output can be sent in standard and ESM format
考题
During the implement phase, systems acceptance testing provides which two of the following services for the customer()A、It installs, configures, and verifies monitoring tools and processes in accordance with the operations implementation.B、It verifies that the Cisco Unified Communications solutions is ready for production.C、It verifies that the Cisco Unified Communications solution meets their business and technical requirements.D、It executes and verifies the migration plan by migrating network services from an existing state to a future state.E、It provides automated tools for measuring system performance under load.
考题
Which design phase service component includes the development and documentation of the test case or cases used to verify that a deployed infrastructure meets operational, functional, and interface requirements? Select exactly 1 answer(s) from the following:()。A、Implementation PlanB、Business PlanC、Staging PlanD、Detailed Design DevelopmentE、Systems Acceptance Test Plan Development
考题
Which implement phase service component describes the activities to install and test your Cisco Unified Communications solution in a nonproduction lab environment()A、Proof of ConceptB、Acceptance TestingC、StagingD、Lab Testing
考题
Which of the following is the MOST important step in any disaster recovery plan?()A、 Appropriate use of backup media and offsite storageB、 The disaster recovery testing process过程C、 Classifying systems according to operational impactD、 Use appropriate fire suppressant systems
考题
单选题During the implement phase, systems acceptance testing does which of the following for the customer? Select exactly 1 answer(s) from the following:()。A
installation, configuration, and testing, as well as the commissioning of tools and processes in accordance with the operations implementation planB
provision of information regarding customer-specified design requirements and configurationC
the migration of network services from an existing state to a future state in accordance with the migration planD
the provision of an objective means of measuring system operability and functionality
考题
单选题Which phase includes testing operational processes and procedures in accordance with the Cisco Unified Communications operations plan()A
OperateB
DesignC
DeployD
Implement
考题
单选题Which phase includes the activity of assisting the customer to monitor their Cisco Unified Communications system performance and to respond to trouble reports()A
MaintainB
DeployC
OperateD
Optimize
考题
单选题Which of the following is the MOST important step in any disaster recovery plan?()A
Appropriate use of backup media and offsite storageB
The disaster recovery testing process过程C
Classifying systems according to operational impactD
Use appropriate fire suppressant systems
考题
单选题Which phase includes conducting Cisco Unified Communications network traffic analysis and capacity planning in order to ensure high availability()A
DesignB
PrepareC
MaintainD
Optimize
考题
单选题Which prepare phase service component involves testing high-level in a controlled environment to ensure that it meets business and technology requirements? Select exactly 1 answer(s) from the following:()。A
Technology Strategy DevelopmentB
High-Level Design DevelopmentC
Business Case DevelopmentD
Proof of Concept
考题
单选题Which implement phase service component consists of explaining the benefits and limitations of purchased support options to a customer and ensuring that the customer understands operational processes and responsibilities? Select exactly 1 answer(s) from the following:()。A
Staging and System MigrationB
Post Implementation Support Handoff MeetingC
Detailed Design DevelopmentD
Staff Training
考题
单选题In the plan phase, network readiness assessment addresses which customer need? Select exactly 1 answer(s) from the following:()。A
an assessment of the preparedness of the customers existing system infrastructure to support a propose solutionB
a comprehensive design that has been customized based on the operations processes, network management processes, and tools of its systemC
an in-depth assessment of the operational environment required to support the operation of both the current and planned solutionsD
the optimal technologies for supporting its business requirements and objectives
考题
多选题You are designing a Windows Azure application. The application includes processes that communicate by using Windows Communications Foundation (WCF) services. The WCF services must support streaming. You need to recommend a host for the processes and a WCF binding. Which two actions should you recommend?()AHost the processes in web roles.BHost the processes in worker roles.CUse NetTcpBinding for the WCF services.DUse WSHttpBinding for the WCF services.
考题
单选题Which operational mode command displays all active IPsec phase 2 security associations?()A
show ike security-associationsB
show ipsec security-associationsC
show security ike security-associationsD
show security ipsec security-associations
考题
单选题Which of these is a benefit of ESM?()A
supports multiple MIBsB
includes NetFlow, NBAR, and IP SLA software subsystemsC
includes NetFlow, syslog, and IP SLA software subsystemsD
includes a predefined framework for filtering and correlating messagesE
supports two logging processes so output can be sent in standard and ESM format
考题
多选题During the implement phase, systems acceptance testing provides which two of the following services for the customer()AIt installs, configures, and verifies monitoring tools and processes in accordance with the operations implementation.BIt verifies that the Cisco Unified Communications solutions is ready for production.CIt verifies that the Cisco Unified Communications solution meets their business and technical requirements.DIt executes and verifies the migration plan by migrating network services from an existing state to a future state.EIt provides automated tools for measuring system performance under load.