网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
The purpose of the systems analysis phase is to build a logical model of the new system.The first step is(71),where you investigate business processes and document what the new system must do to satisfy users. This step continues the investigation that began during the(72). You use the fact-finding results to build business models,data and process models,and object models. The deliverable for the systems analysis phase is the(73),which describes management and user requirements,costs and benefits,and outlines alternative development strategies.The purpose of the systems design phase is to create a physical model that will satisfy all documented requirements for the system. During the systems design phase,you need to determine the(74),which programmers will use to transform the logical design into program modules and code. The deliverable for this phase is the(75),which is presented to management and users for review and approval.
A.system charter
B.system scope definition
C.system blueprint
D.system requirements document
B.system scope definition
C.system blueprint
D.system requirements document
参考答案
参考解析
解析:翻译:系统分析阶段的目的是建立新系统的逻辑模型,第一步就是进行(71),调查业务流程并记录新系统必须做哪些以满足用户需求。这一步是(72)的延续,可以使用调查结果构建业务模型,数据和流程模型以及对象模型。系统分析阶段的可交付成果是(73),它描述了管理和用户要求,成本和收益,还有可替代的方案。系统设计阶段的目的是创建一个能够满足系统所有需求文件要求的物理模型。 在系统设计阶段,需要确定(74),程序员通过系统过程模型把逻辑设计转换为程序模块和代码。该阶段的可交付成果是(75),提交给管理层和用户审查和批准。(73) A.系统章程B.系统范围定义C.系统蓝图 D.系统需求文件
参考答案:(73)B
参考答案:(73)B
更多 “The purpose of the systems analysis phase is to build a logical model of the new system.The first step is(71),where you investigate business processes and document what the new system must do to satisfy users. This step continues the investigation that began during the(72). You use the fact-finding results to build business models,data and process models,and object models. The deliverable for the systems analysis phase is the(73),which describes management and user requirements,costs and benefits,and outlines alternative development strategies.The purpose of the systems design phase is to create a physical model that will satisfy all documented requirements for the system. During the systems design phase,you need to determine the(74),which programmers will use to transform the logical design into program modules and code. The deliverable for this phase is the(75),which is presented to management and users for review and approval.A.system charter B.system scope definition C.system blueprint D.system requirements document ” 相关考题
考题
● Many of the activities performed during the preliminary investigation are still being conducted in (71) , but in much greater depth than before. During this phase, the analyst must become fully aware of the (72) and must develop enough knowledge about the (73) and the existing systems to enable an effective solution to be proposed and implemented. Besides the (74) for process and data of current system, the deliverable from this phase also includes the (75) for the proposed system.(71)A. analysis phaseB. design phaseC. implementation phaseD. maintenance phase(72)A. main symptomB. root problemC. final blueprintD. data specification(73)A. hardware environmentB. testing environmentC. software environmentD. business environment(74)A. logical modelsB. physical modelsC. design modelsD. implementation models(75)A. hardware and software specificationB. system performance specificationC. formal requirements definitionD. general problem statement
考题
The analysis phase answers the questions of who will use the system, what the system will do, and where and when it will be used. During this phase, the project team investigates ny current system,identifies (71) , and develops a concept for the new system. This phase as three steps: first, (72) is developed to guide the project teams efforts. It usually ncludes an analysis of the current system and its problems, and the ways to design a new ystem. The next step is (73) The analysis ofthis information - in conjunction withinput rom the project sponsor and many other people - leads to the development of a concept for a ew system. The system concept is then used as a basis to develop a set ofbusiness analysis odels that describes how the business will operate if the new system were developed. The set of models typically includes models that represent the (74) necessary to support the nderlying business process. Last, the analyses, system concepts, and models are combined nto a document called the (75), which is presented to the project sponsor and other key ecision makers that decide whether the project should continue to move forwardA.improvementopportunitiesB.logicalmodelC.systemrequirementsD.systemarchitecture@@@SXB@@@A.a user manualB.an analysis strategyC. an analysis use caseD.a design user case@@@SXB@@@A.project scope definitionB.prob,lems analysisC.decisionanalysisD.requirementsgathering@@@SXB@@@A.dataandprocessesB.systeminfrastructuresC.externalagentsD.systemsoftware@@@SXB@@@A.requirementsstatementB.designspecificationC.systemproposalD.project charter
考题
●The traditional model for systems development was that an IT department used (71)which is a process-centered technique, and consulted users only when their input or approval was needed. Compared with traditional methods, many companies find that JAD allows key users to participate effectivelyin the (72). When properly used, JAD can result in a more accurate statement of system requirements, a better understanding of common goals and a stronger commitment to the success of the new system. RAD is a team-based technique that speeds up information systems development and produces a functiog.information system. Whilethe end productof jAD is a(an)(73),theendproduct of RAD is the (74) .The RAD model consists offour phases. During the(75),users interact with systems analysts and develop models and prototypes that represent all system processes, outputs, and inputs.(71) A. structured analysisB. object-oriented analysisC. prototype analysisD. process analysis(72) A. initial scope definitionB. requirements modeling processC. object modeling processD. architecture design process(73) A. data flow diagramB. entity relationstip modelC. requirements modelD. object model(74) A. system proposalB. system design modelC. new system architectureD. new information system(75) A. requirements planning phaseB. user design phaseC. construction phaseD. cutover phase
考题
There is nothing in this world constant but inconstancy.--SWIFTProject after project designs a set of algorithms and then plunges into construction of customer-deliverable software on a schedule that demands delivery of the first thing built.In most projects,the first system built is (71) usable,It may be too slow,too big,awkward to use,or all three.There is no (72) but to start again,smarting but smarter,and build a redesigned version in which these problems are solved.The discard and (73) may be done in one lump,or it may be done piece-by-piece.But all large-system experience shows that it will be done.Where a new system concept or new technology is used,one has to build a system to throw away,for even the best planning is not so omniscient(全知的)as to get it right the first time.The management question,therefore ,is not whether to build a pilot system and throw it away.You will do that.The only question is whether to plan in advance to build a (74),or to promise to deliver the throwaway to customers.Seen this way,the answer is much clearer.Delivering that throwaway to customers buys time,but it does so only at the (75) of agony(极大痛苦)for the user,distraction for the builders while they do the redesign,and a bad reputation for the product that best redesign will find hard to live down.Hence plan to throw one away;you will,anyhow.71.()A.almostB.oftenC.usuallyD.barely
考题
The purpose of systems analysis phase is to build a logical model of the new system. The first step is( ), where you investigate business processes and document what the new system must do to satisfy users. This step continues the investigation that began during the( ). You use the fact-finding results to build business models, data and process models, and object models. The deliverable for the systems analysis phase is the( ), which describes management and user requirements, costs and benefits, and outlines alternative development strategies. The purpose of the systems design phase is to create a physical model that will satisfy all documented requirements for the system. During the systems design phase, you need to determine the( ), which programmers will use to transform the logical design into program modules and code. The deliverable for this phase is the( ), which is presented to management and users for review and approval.A.System logical modelingB.use case modelingC.requirements modelingD.application modeling A.systems planning phaseB.systems modeling phaseC.systems analysis phaseD.systems design phase A.system charterB.system scope definitionC.system blueprintD.system requirement document A.application architectureB.system data modelC.system process modelD.implement environment A.system architecture descriptionB.system design specificationC.system technique architectureD.physical deployment architecture
考题
When saving a new document, you must decide on a name for the document and the ( )where it will be saved to.
A addressB locationC programD application
考题
Accelerated analysis approaches emphasize the construction of (71) to more rapidly identify business and user requirements for a new system. As an accelerated analysis technology,(72) reads the program code and automatically generates the equivalent system model, and the code can be obtained from (73) All system analysis approaches require some form. of (74) which includes those techniques to be used to identify or extract system problems and solution requirements from user community.(75) is a classical set of techniques used to collect information about system problems, opportunities, solution requirements, and priorities.A.object modelsB.prototypesC.use casesD.components
考题
试题(71)~(75)The analysis phase answers the questions of who will use the system, what the system will do, and where and when it will be used. During this phase, the project team investigates ny current system,identifies (71) , and develops a concept for the new system. This phase as three steps: first, (72) is developed to guide the project team's efforts. It usually ncludes an analysis of the current system and its problems, and the ways to design a new ystem. The next step is (73) The analysis ofthis information - in conjunction withinput rom the project sponsor and many other people - leads to the development of a concept for a ew system. The system concept is then used as a basis to develop a set ofbusiness analysis odels that describes how the business will operate if the new system were developed. The set of models typically includes models that represent the (74) necessary to support the nderlying business process. Last, the analyses, system concepts, and models are combined nto a document called the (75), which is presented to the project sponsor and other key ecision makers that decide whether the project should continue to move forward.(71) A. improvementopportunitiesB. logicalmodelC. systemrequirementsD. systemarchitecture(72) A. a user manualB. an analysis strategyC. an analysis use caseD. a design user case(73) A. project scope definitionB. prob,lems analysisC. decisionanalysisD. requirementsgathering(74) A. dataandprocessesB. systeminfrastructuresC. externalagentsD. systemsoftware(75) A. requirementsstatementB. designspecificationC. systemproposalD. project charter
考题
●In general,atypical (71) model is composed of several phases, such as requirements analysis phase, generaUdetailed design phase, implementation phase, system acceptance testing phase.(71)A. waterfallB.incrementalC.spiralD.prototyping
考题
27、【单项选择题】
☆
收藏本题
A requirement is simply a statement of what the system must do or what characteristics it needs to have. Requirements written from the perspective of user and focus on user needs are called __(71)__. Requirements written from the developer's perspective and describe how the system will be implemented are called __(72)__. Requirements evolve from detailed statemens of business capabilities that a system should have to detailed statements of the technical way in whick the capabilities will be implemented in the new system. Requirements can be either functional or nofunctional in nature. For example, during the analysis phase of travel vehicles sales system, the system that must have the ability to search for available inventory is __(73)__. The requirement that the system should be able to work on any Web browser belongs to __(74)__. That customer personal information is protected in compliance with the Data Protection Act is a requirement of __(75)__.
(73)应选?A.A.functional requirements
B.A.technical requirements
C.an operational requirements
D.A.service requirements
考题
A requirement is simply a statement of what the system must do or what characteristics it needs to have. Requirements written from the perspective of user and focus on user needs are called __(71)__. Requirements written from the developer's perspective and describe how the system will be implemented are called __(72)__. Requirements evolve from detailed statemens of business capabilities that a system should have to detailed statements of the technical way in whick the capabilities will be implemented in the new system. Requirements can be either functional or nofunctional in nature. For example, during the analysis phase of travel vehicles sales system, the system that must have the ability to search for available inventory is __(73)__. The requirement that the system should be able to work on any Web browser belongs to __(74)__. That customer personal information is protected in compliance with the Data Protection Act is a requirement of __(75)__.
(72)应选?A.operational requirements
B.business requirements
C.technical requirements
D.system requirements
考题
A requirement is simply a statement of what the system must do or what characteristics it needs to have. Requirements evolve from broad statements of overall ( 71)from the system to detailed statements of the business capabilities that a system should support to detailed technical statements of the way in which the capabilities will be implemented in the new system. (72)focus on describing how to create the software product that will be produced from the project Nonfunctional requirements are primarily used in the design phase when decisions are made about the user interface, the hardware and software, and the system's underlying architecture. The system's physical and technical environments would be considered (73). The speed, capacity, and reliability of the system belong to (74).(75)describes that who has authorized access to the system under what circumstances.
(72)处应选?A.User requirements
B.Business requirements
C.Function requirements
D.System requirements
考题
The purpose of the systems analysis phase is to build a logical model of the new system.The first step is(71),where you investigate business processes and document what the new system must do to satisfy users. This step continues the investigation that began during the(72). You use the fact-finding results to build business models,data and process models,and object models. The deliverable for the systems analysis phase is the(73),which describes management and user requirements,costs and benefits,and outlines alternative development strategies.The purpose of the systems design phase is to create a physical model that will satisfy all documented requirements for the system. During the systems design phase,you need to determine the(74),which programmers will use to transform the logical design into program modules and code. The deliverable for this phase is the(75),which is presented to management and users for review and approval.A.systems planning phase
B.systems modeling phase
C.systems analysis phase
D.systems design phase
考题
The purpose of the systems analysis phase is to build a logical model of the new system.The first step is(71),where you investigate business processes and document what the new system must do to satisfy users. This step continues the investigation that began during the(72). You use the fact-finding results to build business models,data and process models,and object models. The deliverable for the systems analysis phase is the(73),which describes management and user requirements,costs and benefits,and outlines alternative development strategies.The purpose of the systems design phase is to create a physical model that will satisfy all documented requirements for the system. During the systems design phase,you need to determine the(74),which programmers will use to transform the logical design into program modules and code. The deliverable for this phase is the(75),which is presented to management and users for review and approval.A.system architecture description
B.system design specification
C.system technique architecture
D.physical deployment architecture
考题
The purpose of the systems analysis phase is to build a logical model of the new system.The first step is(71),where you investigate business processes and document what the new system must do to satisfy users. This step continues the investigation that began during the(72). You use the fact-finding results to build business models,data and process models,and object models. The deliverable for the systems analysis phase is the(73),which describes management and user requirements,costs and benefits,and outlines alternative development strategies.The purpose of the systems design phase is to create a physical model that will satisfy all documented requirements for the system. During the systems design phase,you need to determine the(74),which programmers will use to transform the logical design into program modules and code. The deliverable for this phase is the(75),which is presented to management and users for review and approval.A.system logical modeling
B.use case modeling
C.requirements modeling
D.application modeling
考题
A requirement is simply a statement of what the system must do or what characteristics it needs to have. Requirements evolve from broad statements of overall (71)from the system to detailed statements of the business capabilities that a system should support to detailed technical statements of the way in which the capabilities will be implemented in the new system. ( )focus on describing how to create the software product that will be produced from the project Nonfunctional requirements are primarily used in the design phase when decisions are made about the user interface, the hardware and software, and the system's underlying architecture. The system's physical and technical environments would be considered ( ). The speed, capacity, and reliability of the system belong to ( ).( )describes that who has authorized access to the system under what circumstances.
(71)应选?A.business needs
B.operation processes
C.technical specification
D.function components
考题
The purpose of the systems analysis phase is to build a logical model of the new system.The first step is(71),where you investigate business processes and document what the new system must do to satisfy users. This step continues the investigation that began during the(72). You use the fact-finding results to build business models,data and process models,and object models. The deliverable for the systems analysis phase is the(73),which describes management and user requirements,costs and benefits,and outlines alternative development strategies.The purpose of the systems design phase is to create a physical model that will satisfy all documented requirements for the system. During the systems design phase,you need to determine the(74),which programmers will use to transform the logical design into program modules and code. The deliverable for this phase is the(75),which is presented to management and users for review and approval.A.application architecture
B.system datA.model
C.system process model
D.implement environment
考题
A requirement is simply a statement of what the system must do or what characteristics it needs to have. Requirements evolve from broad statements of overall (71)from the system to detailed statements of the business capabilities that a system should support to detailed technical statements of the way in which the capabilities will be implemented in the new system. (72)focus on describing how to create the software product that will be produced from the project Nonfunctional requirements are primarily used in the design phase when decisions are made about the user interface, the hardware and software, and the system's underlying architecture. The system's physical and technical environments would be considered (73). The speed, capacity, and reliability of the system belong to (74).(75)describes that who has authorized access to the system under what circumstances.
(75)应选?A.System constraint
B.Cultural requirement
C.Control requirement
D.Security requirement
考题
During the systems analysis phase, greater user involvement usually results in better communication, faster development times, and more satisfied users.There are three common team-based approaches that encourage system users to participate actively in various development tasks.1) () is a popular fact-finding technique that brings users into the development process as active participants. The end product of the approach is a requirements model.2) () is a team-based technique that speeds up information systems development and produces a functioning information system. The approach consists of several phases. The (请作答此空) combines elements of the systems planning and systems analysis phases of tbe SDLC.Users, managers, and IT staff members discuss and agree on business needs, project scope, constraints, and system requirements. During (), users interact with systems analysts and develop models and prototypes that represent all system processes, outputs, and inputs.3) () attempt to develop a system incrementally by building a series of prototypes and constantly adjusting them to user requirements.A.requirements planning phase
需求计划阶段
B.business process modeling
业务流程建模
C.business process improvement
业务流程优化
D.scope definition phase
范围定义阶段
考题
A requirement is simply a statement of what the system must do or what characteristics it needs to have. Requirements written from the perspective of user and focus on user needs are called __(71)__. Requirements written from the developer's perspective and describe how the system will be implemented are called __(72)__. Requirements evolve from detailed statemens of business capabilities that a system should have to detailed statements of the technical way in whick the capabilities will be implemented in the new system. Requirements can be either functional or nofunctional in nature. For example, during the analysis phase of travel vehicles sales system, the system that must have the ability to search for available inventory is __(73)__. The requirement that the system should be able to work on any Web browser belongs to __(74)__. That customer personal information is protected in compliance with the Data Protection Act is a requirement of __(75)__.
(75)应选?A..information requirements
B.system performance
C.secrity anD.control
D.cultural anD.political
考题
A requirement is simply a statement of what the system must do or what characteristics it needs to have. Requirements written from the perspective of user and focus on user needs are called __(71)__. Requirements written from the developer's perspective and describe how the system will be implemented are called __(72)__. Requirements evolve from detailed statemens of business capabilities that a system should have to detailed statements of the technical way in whick the capabilities will be implemented in the new system. Requirements can be either functional or nofunctional in nature. For example, during the analysis phase of travel vehicles sales system, the system that must have the ability to search for available inventory is __(73)__. The requirement that the system should be able to work on any Web browser belongs to __(74)__. That customer personal information is protected in compliance with the Data Protection Act is a requirement of __(75)__.
(71)应选?A.operational requirements
B.business requirements
C.technical requirements
D.system requirements
考题
A requirement is simply a statement of what the system must do or what characteristics it needs to have. Requirements written from the perspective of user and focus on user needs are called __(71)__. Requirements written from the developer's perspective and describe how the system will be implemented are called __(72)__. Requirements evolve from detailed statemens of business capabilities that a system should have to detailed statements of the technical way in whick the capabilities will be implemented in the new system. Requirements can be either functional or nofunctional in nature. For example, during the analysis phase of travel vehicles sales system, the system that must have the ability to search for available inventory is __(73)__. The requirement that the system should be able to work on any Web browser belongs to __(74)__. That customer personal information is protected in compliance with the Data Protection Act is a requirement of __(75)__.
(74)应选?A.functional requirements
B.technical requirements
C.operational requirements
D.information requirements
考题
In Hammer’s five-step model, the purpose of “elicitation” is to provide the teacher with feed back as to what to do next.()
考题
In the event of a catastrophic disaster, after which you need to replace the entire UCS blade system (that is, new fabric interconnects, new IOMs, new chassis, and new blades), what type of backup would provide the most complete set of information?()A、 logical configurationB、 all configurationC、 full stateD、 system configuration
考题
You need to design a domain model that meets the company business and security requirements for controlling access to the new Web-based ordering application. What should you do?()A、Create a child OU within the existing domainB、Create a child domain of the existing domainC、Create a new domain in a new forest. Configure the new domain to trust the existing domainD、Create a new tree in the existing forest. Configure the new domain to trust the existing domain
考题
单选题In the event of a catastrophic disaster, after which you need to replace the entire UCS blade system (that is, new fabric interconnects, new IOMs, new chassis, and new blades), what type of backup would provide the most complete set of information?()A
logical configurationB
all configurationC
full stateD
system configuration
考题
单选题241-Conversation 1 What is the main purpose of the research? A
To make preparations for a new publication.B
To learn how couples spend their weekends.C
To investigate what people do at the weekends.
热门标签
最新试卷