There is a drilling rig established()position 24.1E 25.2N.
A
at
B
on
C
in
D
above
参考答案
参考解析
解析:
暂无解析
更多 “单选题There is a drilling rig established()position 24.1E 25.2N.A atB onC inD above” 相关考题
考题
grammar practice is usually divided into two categories, _______________.
A. meaningful drilling and communicative drillingB. mechanical drilling and meaningful drillingC. mechanical practice and meaningful practiceD. meaningful practice and communicative practice
考题
grammar pratice is usually dividied into two categories:_________________.
A、mechanical drilling and meaningful drillingB、mechanical practice and meaningful practiceC、meaningful drilling and communcative drillingD、meaningful practice and communicative practice
考题
How is a Martini Layer 2 MPLS VPN established?()
A. established using LDPB. established using BGPC. established using RSVPD. established using IP
考题
A mobile offshore drilling unit under tow is approaching a fog bank. When should fog signals be started?A.When the towing vessel enters the fogB.When the drilling rig enters the fogC.When the towing vessel can no longer be seen from the rigD.Immediately
考题
A mobile offshore drilling unit will show the day-shape in DIAGRAM 10 to indicate that it is ______.A.at anchorB.being towedC.agroundD.drilling
考题
A jack-up drilling rig being towed must ______.A.turn off all lights that interfere with the navigation lightsB.turn on all available working lights on deckC.ring the bell rapidly for five seconds once a minuteD.display two black diamonds in a vertical line during the day
考题
When a marine surveyor is employed to assist in the move of a mobile offshore drilling unit,he ______.A.becomes responsible for the safe movement of the rigB.relieves the Offshore Installation Manager at the moment the rig is free from the bottomC.must be designated as the person in charge of the rigD.is a specialist who is hired to provide advice and guidance on aspects of the move
考题
It is the responsibility of the person in charge to ______.A.revise the operating manual when rig personnel changeB.be fully aware of the provisions in the operating manualC.maintain the rig's construction portfolioD.All of the above
考题
A heavy steel device that is set on the sea floor and used as a drilling template in offshore drilling operations is called a ______.A.temporary guide baseB.permanent guide baseC.guide frameD.foundation template
考题
In weather report, POSITION GOOD means that ______.A.the position is suitableB.the position is reliableC.the position is changeableD.the position is fixable
考题
把引航员梯装在下风舷。()A、Fit the rope ladder in the lee side.B、Rig the rope ladder in the lee side.C、Rig the pilot ladder on the lee side.
考题
How is a Martini Layer 2 MPLS VPN established?()A、established using LDPB、established using BGPC、established using RSVPD、established using IP
考题
单选题A mobile offshore drilling unit under tow is approaching a fog bank. When should fog signals be started? ()A
When the towing vessel enters the fogB
When the drilling rig enters the fogC
When the towing vessel can no longer be seen from the rigD
Immediately
考题
单选题MV SUDAN/MEAN AT 0200UTC IN POSITION 40.44N 141.52E PASSED A DERELICT ABOUT 40 TONS HALF SUBMERGED AND IS DRIFTING. This cable says that she met with possibly().A
a floating wreckB
a survivor at seaC
a man who had fallen overboardD
a drilling rig
考题
单选题A heavy steel device that is set on the sea floor and used as a drilling template in offshore drilling operations is called a().A
temporary guide baseB
permanent guide baseC
guide frameD
foundation template
考题
单选题When a marine surveyor is employed to assist in the move of a mobile offshore drilling unit,he().A
becomes responsible for the safe movement of the rigB
relieves the Offshore Installation Manager at the moment the rig is free from the bottomC
must be designated as the person in charge of the rigD
is a specialist who is hired to provide advice and guidance on aspects of the move
考题
单选题Under the regulations implementing MARPOL, a mobile offshore drilling unit is required to have an International Oil Pollution Prevention (IOPP) certificate when the unit ().A
is drilling on the Outer Continental ShelfB
moves to a new drilling location in U-SwatersC
engages in a voyage to a port of another country which is a party of MARPOLD
All of the above
考题
单选题Fighting a rig fire in the ballast pumproom with hoses would adversely affect the stability of the rig most by().A
increasing the permeability of the pumproomB
reduction of drill water from the storage tanksC
a list caused by water filling the compartmentD
a reduced KG caused by water filling the compartment
考题
单选题Fighting a rig fire in a watertight compartment with hoses could reduce the stability of the rig by().A
progressive downfloodingB
reducing the level of drill water from the storage tanksC
causing a list due to the water in the compartmentD
reducing the KG to minimum allowable
考题
单选题Midships refers to rudder to be held().A
in position to starboardB
in position to portC
in position to anywhereD
in position fore and aft
考题
单选题It is the responsibility of the person in charge to().A
revise the operating manual when rig personnel changeB
be fully aware of the provisions in the operating manualC
maintain the rig's construction portfolioD
All of the above
考题
单选题A jack-up drilling rig being towed must().A
turn off all lights that interfere with the navigation lightsB
turn on all available working lights on deckC
ring the bell rapidly for five seconds once a minuteD
display two black diamonds in a vertical line during the day
考题
单选题Where would you find the call sign or call letters of the radio station on your ship?()A
In the rig safety manualB
On the Certificate of InspectionC
On the Ship Station LicenseD
On the rig Watch Bill
考题
单选题Where would you find the “call sign” or “call letters”of the radio station on your rig?()A
In the rig safety manualB
On the Certificate of InspectionC
On the Ship Station LicenseD
On the rig Watch Bill
考题
单选题The International Regulations for Preventing Collisions at Sea contain the requirements for ().A
lights that must be displayed on anchor buoysB
the display of load line markingsC
minimum horsepower for tugs involved in rig movesD
lighting of mobile offshore drilling units being towed
考题
单选题There is a drilling rig established()position 24.1E 25.2N.A
atB
onC
inD
above