网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A jack-up drilling rig being towed must().
A

turn off all lights that interfere with the navigation lights

B

turn on all available working lights on deck

C

ring the bell rapidly for five seconds once a minute

D

display two black diamonds in a vertical line during the day


参考答案

参考解析
解析: 暂无解析
更多 “单选题A jack-up drilling rig being towed must().A turn off all lights that interfere with the navigation lightsB turn on all available working lights on deckC ring the bell rapidly for five seconds once a minuteD display two black diamonds in a vertical line during the day” 相关考题
考题 A mobile offshore drilling unit under tow is approaching a fog bank. When should fog signals be started?A.When the towing vessel enters the fogB.When the drilling rig enters the fogC.When the towing vessel can no longer be seen from the rigD.Immediately

考题 A mobile offshore drilling unit will show the day-shape in DIAGRAM 10 to indicate that it is ______.A.at anchorB.being towedC.agroundD.drilling

考题 A pilot vessel may continue to sound an identity signal if she is ______.A.agroundB.at anchorC.not under commandD.being towed

考题 A jack-up drilling rig being towed must ______.A.turn off all lights that interfere with the navigation lightsB.turn on all available working lights on deckC.ring the bell rapidly for five seconds once a minuteD.display two black diamonds in a vertical line during the day

考题 A jack-up drilling unit elevated on the Outer Continental Shelf must have a fog horn that will sound ______.A.a 2-second blast every 20 secondsB.a 4-second blast every 20 secondsC.an 8-second blast every 30 secondsD.a 10-second blast every 30 seconds

考题 When a marine surveyor is employed to assist in the move of a mobile offshore drilling unit,he ______.A.becomes responsible for the safe movement of the rigB.relieves the Offshore Installation Manager at the moment the rig is free from the bottomC.must be designated as the person in charge of the rigD.is a specialist who is hired to provide advice and guidance on aspects of the move

考题 Where will you find the requirements for the signals that must be sounded by a mobile offshore drilling unit that is being towed through an area of restricted visibility?A.COLREGSB.MMS RulesC.SOLAS ConventionD.Coast Pilot

考题 A vessel or object being towed astern shall display a(n) ______.A.forward masthead lightB.after masthead lightC.stern lightD.All of the above

考题 你想把引航员梯装在哪一舷?()A、On which side must I rig the pilot ladder?B、On which side do you want the ladder rigged?C、On what side must I rig the pilot ladder?D、On which side do you want the gangway rigged?

考题 单选题On a ship,watertight doors should be operated().A during abandon drillB during fire drillC weeklyD when the rig is being moved

考题 单选题A mobile offshore drilling unit under tow is approaching a fog bank. When should fog signals be started? ()A When the towing vessel enters the fogB When the drilling rig enters the fogC When the towing vessel can no longer be seen from the rigD Immediately

考题 单选题If your vessel is underway in fog and you hear one prolonged and three short blasts,this is a ().A vessel not under commandB sailing vesselC vessel being towed (manned)D vessel being towed (unmanned)

考题 单选题MV SUDAN/MEAN AT 0200UTC IN POSITION 40.44N 141.52E PASSED A DERELICT ABOUT 40 TONS HALF SUBMERGED AND IS DRIFTING. This cable says that she met with possibly().A a floating wreckB a survivor at seaC a man who had fallen overboardD a drilling rig

考题 单选题On offshore drilling units,each EPIRB or SART must be tested once every().A dayB weekC monthD year

考题 单选题Guide tolerances during elevation of the jack-up rig will().A reduce spud can bearing pressureB keep the unit level and reduce overloadingC reduce stresses on the hullD minimize the potential for punch-through

考题 单选题When a marine surveyor is employed to assist in the move of a mobile offshore drilling unit,he().A becomes responsible for the safe movement of the rigB relieves the Offshore Installation Manager at the moment the rig is free from the bottomC must be designated as the person in charge of the rigD is a specialist who is hired to provide advice and guidance on aspects of the move

考题 单选题A vessel being towed will show().A a forward masthead lightB sidelights and a sternlightC a towing lightD All of the above

考题 单选题An offshore drilling unit must be equipped with a first aid kit approved by the().A Coast GuardB American Bureau of ShippingC Minerals Management ServiceD Mine Safety and Health Administration

考题 单选题你想把引航员梯装在哪一舷?()A On which side must I rig the pilot ladder?B On which side do you want the ladder rigged?C On what side must I rig the pilot ladder?D On which side do you want the gangway rigged?

考题 单选题The International Regulations for Preventing Collisions at Sea contain the requirements for ().A lights that must be displayed on anchor buoysB the display of load line markingsC minimum horsepower for tugs involved in rig movesD lighting of mobile offshore drilling units being towed

考题 单选题Fittings used for towing must be().A Coast Guard approvedB stamped with maximum working loadsC securely fastenedD positioned exactly at the bow of the towed vessel

考题 单选题There is a drilling rig established()position 24.1E 25.2N.A atB onC inD above

考题 单选题A vessel or object being towed astern shall display a(n)().A forward masthead lightB after masthead lightC stern lightD All of the above

考题 单选题Portable fire extinguishers must be provided for the cargo tank area of an unmanned tank barge().A only when fully loadedB if one or more tanks are fullC when transferring cargoD only when the barge is being towed

考题 单选题On offshore drilling units,emergency lighting and each emergency power system must be tested at least once a().A dayB weekC monthD year

考题 单选题You must rig pilot ladder()port side.A onB inC atD for

考题 单选题Where will you find the requirements for the signals that must be sounded by a mobile offshore drilling unit that is being towed through an area of restricted visibility? ()A COLREGSB MMS RulesC SOLAS ConventionD Coast Pilot