网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
Companycom is planning to do server consolidation on POWER5. The customer has a test environment, a QA environment and a production environment for two applications. Both the test and QA environments are very small and are only utilized when new releases are being developed and tested. They require less than 1 CPU each. Both production applications require 2 CPUs for day-to-day operation and can require up to an additional 2 CPUs each during abrupt peak requirements. What is the best design for the LPARs?()
A
Use micropartitioning for test and QA environments, and DLPAR for the production applications
B
Use micropartitioning for test and QA environment, and CPU pooling for the production applications
C
Create standard LPARs for all test, QA, and production applications to keep all partitions separate and isolated.
D
Create DLPAR partitions for all test, QA, and production applications to keep test from disturbing production environment.
参考答案
参考解析
解析:
暂无解析
更多 “单选题Companycom is planning to do server consolidation on POWER5. The customer has a test environment, a QA environment and a production environment for two applications. Both the test and QA environments are very small and are only utilized when new releases are being developed and tested. They require less than 1 CPU each. Both production applications require 2 CPUs for day-to-day operation and can require up to an additional 2 CPUs each during abrupt peak requirements. What is the best design for the LPARs?()A Use micropartitioning for test and QA environments, and DLPAR for the production applications B Use micropartitioning for test and QA environment, and CPU pooling for the production applications C Create standard LPARs for all test, QA, and production applications to keep all partitions separate and isolated. D Create DLPAR partitions for all test, QA, and production applications to keep test from disturbing production environment. ” 相关考题
考题
A customer has a Fibre Channel switch residing in a configuration where both production and test data coexist. Which of the following is the simplest method for ensuring that the two types of data do not flow through the same port?()A.VLANB.zoningC.trunkingD.LUN masking
考题
A customer has a Fibre Channel switch residing in a configuration where both production and test data coexist. Which of the following is the simplest method for ensuring that the two types of data do not flow through the same port?()A、VLANB、zoningC、trunkingD、LUN masking
考题
A customer has 4 EXP5000 expansion enclosures attached to an IBM System Storage DS5100 intheir production environment, and the same configuration in their disaster recovery environment.The customer removes the drives from the production environment and ships them to the disasterrecovery facility. What IBM technology feature gives the customer the ability to migrate drives fromone DS5000 to another DS5000 with data intact?()A、SnapCopyB、DACstoreC、FlexCloneD、RAID Protect
考题
Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()A、Use AIX 5.3 which supports micro-partitioning for both the test and training LPARSB、Use DLPAR to move resources from the test LPAR to training when training is activeC、Install Partition Load Manager to share resources between the test and training environmentsD、Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs
考题
An administrator is planning an upgrade of a major software package on an application server.The software has been identified, the project approved and the upgrade purchased. Which of the following steps should the administrator take NEXT?()A、Create a test environment for the new version.B、Determine system requirements for the upgrade.C、Request bids from other competing vendors in the product space.D、Document the upgrade.
考题
An administrator is planning an upgrade of a major software package on an application server.The software has been tested successfully in a test environment and it is ready to go into production. Which of the following steps should the administrator take next?()A、Identify necessary operating system updatesB、Implement the changeC、Document the changeD、Schedule system down time
考题
A staging server is critical for an administrator to test updates without introducing risk into a production environment. Which of the following steps should an administrator take to test on a staging server?()A、Create and Configure a WebSphere Commerce Instance on the staging serverB、Run the Stage Copy Utility to copy production server data into the staging server.C、Run the Stage Propagate Utility to propagate the staging server with production server data D、Create and configure a Staging database
考题
Companycom is planning to do server consolidation on POWER5. The customer has a test environment, a QA environment and a production environment for two applications. Both the test and QA environments are very small and are only utilized when new releases are being developed and tested. They require less than 1 CPU each. Both production applications require 2 CPUs for day-to-day operation and can require up to an additional 2 CPUs each during abrupt peak requirements. What is the best design for the LPARs?()A、Use micropartitioning for test and QA environments, and DLPAR for the production applications B、Use micropartitioning for test and QA environment, and CPU pooling for the production applications C、Create standard LPARs for all test, QA, and production applications to keep all partitions separate and isolated. D、Create DLPAR partitions for all test, QA, and production applications to keep test from disturbing production environment.
考题
When a staging server is used as an environment for testing new data in a default WebSphere Commerce installation, which of the following are true about the staging server?()A、The database has a subset of the tables in the production server database.B、The database has a copy of selected data from the production databaseC、The database logs changes for later propagation.D、The database is accessed as read-only to prevent data corruption.E、The database includes all user and order data for offline processing.
考题
Companycom wants to deploy WebSphere in an HACMP environment, running on two servers in LPARs. These servers will also host the test and dev LPARs. The customer would like to use the test and dev resources to support an HACMP failover. What is the best way to accomplish this task?()A、Run the test and dev LPARs in an uncapped modeB、Activate COD resources if a failover should occurC、Use DLPAR to move resources between the test and dev and the HACMP LPARD、Stop the test and dev environments, bring up new profile for HACMP failover
考题
A customer has a mission-critical application with redundant fabrics. The customer plans to replace older EMC Symmetrix 8830 systems with an IBM System Storage DS8700 and an IBM SAN Volume Controller (SVC). Which statement best describes the way to minimize the impact of data migration on the production environment()A、the production environment does not require an outageB、the production environment requires an outage to install the SVCC、the production environment requires an outage to install the DS8700D、the production environment requires an outage to remove the EMC systems
考题
Your virtual environment includes Windows Server 2008 R2 Hyper-V servers. You manage the environment by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. You are planning to install an application upgrade. Testing the production application requires access to the following three virtual machines (VMs): a domain controller, a server that runs Microsoft SQL Server, and an IIS Web server. You need to test the application upgrade in a virtual environment that is isolated from the production network. Which two sets of actions should your plan include?()A、Import the checkpoint into the test environment, and apply the application update for testingB、Create a checkpoint of the three VMs, and export the checkpoint to the test environmentC、Create three VMs in the test environment, attach the existing .vhd files, and apply the application update for testingD、Pause the three VMs, and copy the .vhd files to the test environment
考题
You are building a test environment to evaluate DNS Security Extensions (DNSSEC). You have a domain controller named Server1 that runs Windows Server 2008 R2 in your test environment. Server1 has the DNS Server server role installed. You need to configure Server1 to support the DNSSEC evaluation. Which two actions should you perform?()A、Create a new Quad-A (AAAA) DNS record.B、Create a new Signature (SIG) DNS record.C、Create a new Public key (KEY) DNS record.D、Create a new Well-known service (WKS) DNS record.
考题
Your company has a Microsoft Hyper-V Server 2008 R2 environment. You manage the virtual environment by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. You are creating a virtual test environment by installing two child partitions. The test environment must be completely isolated from all production servers. You need to ensure that the child partitions can communicate with each other. Which connection type should you configure?()A、PrivateB、InternalC、ExternalD、Dedicated host
考题
You work as the enterprise exchange administrator at TestKing.com. You are responsible for managingthe Exchange Server 2010 environment. You are in the process of devising a plan to install a monitoringsolution for the Exchange Server 2010 environment. You receive notification to propose a solution tomanagement for tracking of the usage of ActiveSync clients as well as analyzing the usage trends. What should you do?()A、Test best option is to include the Exchange Server Performance Troubleshooter in the solution.B、Test best option is to include the Internet Information Server log files in the solution.C、Test best option is to include the Microsoft System Control Configuration Manager in the solution.D、Test best option is to include the Exchange Server Mail Flow Troubleshooter in the solution.
考题
Your virtual environment includes Windows Server 2008 R2 Hyper-V servers. You manage the environment by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. You are planning to install an application upgrade. Testing the production application requires access to the following three virtual machines (VMs): a domain controller, a server that runs Microsoft SQL Server, and an IIS Web server. You need to test the application upgrade in a virtual environment that is isolated from the production network. Which two sets of actions should your plan include?()A、Pause the three VMs, and copy the .vhd files to the test environmentB、Create a checkpoint of the three VMs, and export the checkpoint to the test environmentC、Import the checkpoint into the test environment, and apply the application update for testingD、Create three VMs in the test environment, attach the existing .vhd files, and apply the application update for testing
考题
单选题An existing IBM customer has some iSeries servers in their environment. The customer is adding an x366 server with an RSA-II installed for their Microsoft Client/Server applications. The customer wants to consolidate the storage and centralize the backup of the iSeries and xSeries platforms. Which of the following will accomplish this?()A
Share the data over the Ethernet LAN.B
Install the IXA Adapter in the iSeries server.C
Install the IXA Adapter in the xSeries server.D
Attach both servers to an IXS switch.
考题
单选题A customer has 4 EXP5000 expansion enclosures attached to an IBM System Storage DS5100 intheir production environment, and the same configuration in their disaster recovery environment.The customer removes the drives from the production environment and ships them to the disasterrecovery facility. What IBM technology feature gives the customer the ability to migrate drives fromone DS5000 to another DS5000 with data intact?()A
SnapCopyB
DACstoreC
FlexCloneD
RAID Protect
考题
单选题An administrator is planning an upgrade of a major software package on an application server.The software has been tested successfully in a test environment and it is ready to go into production. Which of the following steps should the administrator take next?()A
Identify necessary operating system updatesB
Implement the changeC
Document the changeD
Schedule system down time
考题
多选题When a staging server is used as an environment for testing new data in a default WebSphere Commerce installation, which of the following are true about the staging server?()AThe database has a subset of the tables in the production server database.BThe database has a copy of selected data from the production databaseCThe database logs changes for later propagation.DThe database is accessed as read-only to prevent data corruption.EThe database includes all user and order data for offline processing.
考题
单选题An administrator is planning an upgrade of a major software package on an application server. The software has been tested successfully in a test environment and it is ready to go into production. Which of the following steps should the administrator take next?()A
Identify necessary operating system updatesB
Implement the changeC
Document the changeD
Schedule system down time
考题
单选题An administrator is planning an upgrade of a major software package on an application server.The software has been identified, the project approved and the upgrade purchased. Which of the following steps should the administrator take NEXT?()A
Create a test environment for the new version.B
Determine system requirements for the upgrade.C
Request bids from other competing vendors in the product space.D
Document the upgrade.
考题
单选题Your company has a Microsoft Hyper-V Server 2008 R2 environment. You manage the virtual environment by using Microsoft System Center Virtual Machine Manager (VMM) 2008 R2. You are creating a virtual test environment by installing two child partitions. The test environment must be completely isolated from all production servers. You need to ensure that the child partitions can communicate with each other. Which connection type should you configure?()A
PrivateB
InternalC
ExternalD
Dedicated host
考题
单选题A customer has a mission-critical application with redundant fabrics. The customer plans to replace older EMC Symmetrix 8830 systems with an IBM System Storage DS8700 and an IBM SAN Volume Controller (SVC). Which statement best describes the way to minimize the impact of data migration on the production environment()A
the production environment does not require an outageB
the production environment requires an outage to install the SVCC
the production environment requires an outage to install the DS8700D
the production environment requires an outage to remove the EMC systems
考题
单选题Companycom wants to deploy WebSphere in an HACMP environment, running on two servers in LPARs. These servers will also host the test and dev LPARs. The customer would like to use the test and dev resources to support an HACMP failover. What is the best way to accomplish this task?()A
Run the test and dev LPARs in an uncapped modeB
Activate COD resources if a failover should occurC
Use DLPAR to move resources between the test and dev and the HACMP LPARD
Stop the test and dev environments, bring up new profile for HACMP failover
考题
单选题A customer has a Fibre Channel switch residing in a configuration where both production and test data coexist. Which of the following is the simplest method for ensuring that the two types of data do not flow through the same port?()A
VLANB
zoningC
trunkingD
LUN masking
考题
单选题Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()A
Use AIX 5.3 which supports micro-partitioning for both the test and training LPARSB
Use DLPAR to move resources from the test LPAR to training when training is activeC
Install Partition Load Manager to share resources between the test and training environmentsD
Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs
热门标签
最新试卷