A System p distribution customer is very concerned about Reliability, Availability and Serviceability (RAS). They are planning to install several p6 servers in their facilities and want to be able to move an LPAR from one System p to another. Which of the following would accomplish this()
A
System p servers using similar SAN storage
B
System p servers must share an HMC
C
System p servers must have the same level HMC
D
System p servers with VIOS
参考答案
参考解析
解析:
暂无解析
更多 “单选题A System p distribution customer is very concerned about Reliability, Availability and Serviceability (RAS). They are planning to install several p6 servers in their facilities and want to be able to move an LPAR from one System p to another. Which of the following would accomplish this()A System p servers using similar SAN storageB System p servers must share an HMCC System p servers must have the same level HMCD System p servers with VIOS” 相关考题
考题
A customer wants to consolidate storage from four IBM System p servers and one large IBM System i server. The customer does not have a SAN installed. The customer will require approximately 4 TB for System p and 3 TB for System i. The customer states that performance and isolation of the System i system is most important. Capacity, multi-path access, and replication functions are important for the System p servers. Which solution best satisfies the customer requirements()A、IBM System Storage DS8100 with 300 GB drives for the System p, 73 GB/15k drives for System i, and advanced functions for System p capacityB、IBM System Storage DS8300 with LPAR, 73 GB/15k drives for System i, and 300 GB drives and advanced functions for System p capacityC、IBM System Storage DS6800 with direct attach, 73 GB/15k drives for System i performance, and 300 GB drives and advanced functions for System pD、IBM System Storage DS6800 with LPAR, 146 GB/15k drives for System i, 500 GB FATA drives for System p
考题
A customer wants to consolidate storage from four IBM System p servers and one large IBM System i server on a high end disk subsystem. The customer does not have a SAN installed. The customer will require approximately 24 TB of capacity for System p and 20 TB of capacity for System i. The customer states that performance of the System i system is most important. Capacity, multi-path access, and replication functions are important for the System p servers. Which solution best satisfies the customer requirements()A、IBM DS8700 with 600 GB drives for the System p, 300 GB/15k drives for Systemi; and advanced functions for System p capacityB、IBM DS8700 with LPAR, 300 GB/15k drives and RAID 10 for Systemi; and 600GB drives with RAID 5 and advanced functions for System p capacityC、IBM DS8700 with advanced functions, 300 GB/15k drives and RAID 10 for Systemi performance; and 600 GB drives and RAID 5 for System p capacityD、IBM DS5100 with Enhanced Remote Mirror, 600GB/15k drives and RAID 5 for System p; and 300GB/15k drives and RAID 10 for Systemi
考题
Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()A、Use AIX 5.3 which supports micro-partitioning for both the test and training LPARSB、Use DLPAR to move resources from the test LPAR to training when training is activeC、Install Partition Load Manager to share resources between the test and training environmentsD、Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs
考题
A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()A、 Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.B、 Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.C、 Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.D、 Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.
考题
A customer requests a solution that will enhance the availability of their servers and ensure that the time needed to recover from an Operating System fault is at a minimum. What solution do you recommend? ()A、Use RAID protection and add more memoryB、Install Operating System in RAID 0 (Parity) Disk ConfigurationC、Install Operating System in RAID 5 Disk ConfigurationD、Use RAID protection and ensure systems are backed-up daily
考题
A System p customer is planning to implement virtualization and is concerned about how to respond to an increased workload and what limitations there are for very small workloads. Which of the following describes the minimum size for an LPAR and the minimum amount that can be transferred from on LPAR to another()A、Smallest partition 10% of all available processors, as small as 1% of all available processors may be transferred.B、Smallest partition 10% of a processor, as small 1% of a processor may be transferred.C、Smallest partition one processor, as small 1% of a processor may be transferred.D、Smallest partition one core, as small 10% of a processor may be transferred.
考题
A customer is planning to migrate a financial application to a 12-way p5-570 system with 96GB of memory. The application data is stored on an ESS Model 800 attached to a p670 server with AIX 5.2. They will have a short outage window to perform the data migration. What is the quickest way to move all the data stored on the attached ESS from the p670 to the new p5-570?()A、Use rsync to synchronize the data across servers.B、Use exportvg and importvg to move the data to the target system.C、Use NFS to copy the data from the source system to the target system.D、Backup the data from the source system and restore to the target system.
考题
When doing the Solution Assurance for a p5 570 with several LPARs, it is discovered that the customer plans to back the system up using mksysb. The customer would like to do unattended automated system backups and incorporate them into their off-site data recovery system. Which mksysb solution should be implemented?()A、A local DVD-ROM driveB、A NFS mount on a NIM MasterC、A SSA disk array and mirror the dataD、A local tape drive and use DLPAR to move the tape to each LPAR
考题
A system contains multiple hot-swap stand-alone disks with a large number of JFS2 file systems. Which feature of JFS2 can be used to improve reliability, availability and serviceability (RAS) if a disk failure occurs?()A、Inline loggingB、Dynamic inode allocationC、Linear directory organizationD、Online filesystem defragmentation
考题
Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()A、POWER5 runs in an SMP mode as defaultB、POWER5 can run in a full system mode the same as the p690C、POWER5 can run in full system mode with the purchase of PLMD、POWER5 can run in a full system mode, but it is in LPAR mode
考题
A System p distribution customer is very concerned about Reliability, Availability and Serviceability (RAS). They are planning to install several p6 servers in their facilities and want to be able to move an LPAR from one System p to another. Which of the following would accomplish this()A、System p servers using similar SAN storageB、System p servers must share an HMCC、System p servers must have the same level HMCD、System p servers with VIOS
考题
A customer is running a number of non-IBM servers purchased two years ago and has settled on one of the new IBM xSeries servers as a migration path. From the following options, which is the preferred migration path?()A、Copy the image of the non-IBM servers and copy that image to the IBM servers, then reboot the IBM servers.B、Copy the image from the non-IBM servers with RDM and install them with IBM Director to the new IBM servers. Reboot the IBM servers.C、Install a fresh operating system using ServerGuide, and then install the applications and copy the data from the old servers.D、Install a fresh operating system on the IBM servers and then run ServerGuide on the IBM servers to migrate the applications and data to the IBM servers.
考题
A customer has several small AIX applications that are expected to grow over the next several years. The biggest challenge facing the customer is determining the growth rate of the applications and the I/T requirements needed to support the growth. They are also concerned about the under-utilization of their IT resources. What should the pSeries technical specialist recommend to address this challenge?()A、Install a p615 per application.B、Install a p650 with AIX 5.2 and dynamic LPAR and CUoD.C、Install the appropriate solution once the requirements are understood.D、Install a POWER5 system with AIX 5.3, Advanced POWER Virtualization, and CoD.
考题
A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble. Which resource should be consulted while developing the solution options?()A、Disk MagicB、TPC for DataC、CLARiiON Procedure GeneratorD、System Storage Interoperability Center
考题
Which of the following situations would suggest to a System x Sales Specialist that the customer could benefit from an iSCSI solution?()A、The customer is looking for a fibre SAN solution to increase reliability and performance.B、The customer wants to implement an energy-efficient solution to comply with their Go Green initiative.C、The customer is cost-conscious and is looking for a centralized storage solution.D、The customer is a large telecommunications firm and is looking to centralize storage for all their System x,System p,and mainframe servers.
考题
单选题When doing the Solution Assurance for a p5 570 with several LPARs, it is discovered that the customer plans to back the system up using mksysb. The customer would like to do unattended automated system backups and incorporate them into their off-site data recovery system. Which mksysb solution should be implemented?()A
A local DVD-ROM driveB
A NFS mount on a NIM MasterC
A SSA disk array and mirror the dataD
A local tape drive and use DLPAR to move the tape to each LPAR
考题
单选题A System p distribution customer is very concerned about Reliability, Availability and Serviceability (RAS). They are planning to install several p6 servers in their facilities and want to be able to move an LPAR from one System p to another. Which of the following would accomplish this()A
System p servers using similar SAN storageB
System p servers must share an HMCC
System p servers must have the same level HMCD
System p servers with VIOS
考题
单选题A System p administrator in a manufacturing customer plans to migrate an AIX 5.2 system to a new LPAR on an existing System p using VIOS. Which of the following must be completed prior to this migration ()A
Upgrade system firmware to latest levelB
Upgrade to AIX 5.3C
Upgrade HMC to version 6.1D
Convert rootvg filesystems to JFS2
考题
单选题Which of the following situations would suggest to a System x Sales Specialist that the customer could benefit from an iSCSI solution?()A
The customer is looking for a fibre SAN solution to increase reliability and performance.B
The customer wants to implement an energy-efficient solution to comply with their Go Green initiative.C
The customer is cost-conscious and is looking for a centralized storage solution.D
The customer is a large telecommunications firm and is looking to centralize storage for all their System x,System p,and mainframe servers.
考题
单选题A customer is planning to migrate a financial application to a 12-way p5-570 system with 96GB of memory. The application data is stored on an ESS Model 800 attached to a p670 server with AIX 5.2. They will have a short outage window to perform the data migration. What is the quickest way to move all the data stored on the attached ESS from the p670 to the new p5-570?()A
Use rsync to synchronize the data across servers.B
Use exportvg and importvg to move the data to the target system.C
Use NFS to copy the data from the source system to the target system.D
Backup the data from the source system and restore to the target system.
考题
单选题Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()A
POWER5 runs in an SMP mode as defaultB
POWER5 can run in a full system mode the same as the p690C
POWER5 can run in full system mode with the purchase of PLMD
POWER5 can run in a full system mode, but it is in LPAR mode
考题
单选题A customer wants to consolidate storage from four IBM System p servers and one large IBM System i server. The customer does not have a SAN installed. The customer will require approximately 4 TB for System p and 3 TB for System i. The customer states that performance and isolation of the System i system is most important. Capacity, multi-path access, and replication functions are important for the System p servers. Which solution best satisfies the customer requirements()A
IBM System Storage DS8100 with 300 GB drives for the System p, 73 GB/15k drives for System i, and advanced functions for System p capacityB
IBM System Storage DS8300 with LPAR, 73 GB/15k drives for System i, and 300 GB drives and advanced functions for System p capacityC
IBM System Storage DS6800 with direct attach, 73 GB/15k drives for System i performance, and 300 GB drives and advanced functions for System pD
IBM System Storage DS6800 with LPAR, 146 GB/15k drives for System i, 500 GB FATA drives for System p
考题
单选题A customer has an entry level Power System that is currently partitioned and managed by a Hardware Management Console (HMC). For operational reasons, it must be disconnected from the HMC and configured as a new development system. How should the customer proceed to implement PowerVM Express and Integrated Virtualization Manager (IVM) on this Power System? ()A
Install a VIO server as an additional partition and DLPAR the resources from the existing partition to the VIO server.B
Create a service partition and install a VIO server. This will automatically move resources to the VIO server on reboot of the managed system.C
Delete all the existing LPARs, create a new LPAR and assign all the system resources to this LPAR and then install the VIO server on this LPAR.D
Reset the machine to Manufacturing Default Configuration and install the VIO server on the resulting partition created, which will own all system resources.
考题
单选题A customer wants to consolidate storage from four IBM System p servers and one large IBM System i server on a high end disk subsystem. The customer does not have a SAN installed. The customer will require approximately 24 TB of capacity for System p and 20 TB of capacity for System i. The customer states that performance of the System i system is most important. Capacity, multi-path access, and replication functions are important for the System p servers. Which solution best satisfies the customer requirements()A
IBM DS8700 with 600 GB drives for the System p, 300 GB/15k drives for Systemi; and advanced functions for System p capacityB
IBM DS8700 with LPAR, 300 GB/15k drives and RAID 10 for Systemi; and 600GB drives with RAID 5 and advanced functions for System p capacityC
IBM DS8700 with advanced functions, 300 GB/15k drives and RAID 10 for Systemi performance; and 600 GB drives and RAID 5 for System p capacityD
IBM DS5100 with Enhanced Remote Mirror, 600GB/15k drives and RAID 5 for System p; and 300GB/15k drives and RAID 10 for Systemi
考题
单选题A System p customer is planning to implement virtualization and is concerned about how to respond to an increased workload and what limitations there are for very small workloads. Which of the following describes the minimum size for an LPAR and the minimum amount that can be transferred from on LPAR to another()A
Smallest partition 10% of all available processors, as small as 1% of all available processors may be transferred.B
Smallest partition 10% of a processor, as small 1% of a processor may be transferred.C
Smallest partition one processor, as small 1% of a processor may be transferred.D
Smallest partition one core, as small 10% of a processor may be transferred.
考题
单选题A customer is running a number of non-IBM servers purchased two years ago and has settled on one of the new IBM xSeries servers as a migration path. From the following options, which is the preferred migration path?()A
Copy the image of the non-IBM servers and copy that image to the IBM servers, then reboot the IBM servers.B
Copy the image from the non-IBM servers with RDM and install them with IBM Director to the new IBM servers. Reboot the IBM servers.C
Install a fresh operating system using ServerGuide, and then install the applications and copy the data from the old servers.D
Install a fresh operating system on the IBM servers and then run ServerGuide on the IBM servers to migrate the applications and data to the IBM servers.
考题
单选题A system contains multiple hot-swap stand-alone disks with a large number of JFS2 file systems. Which feature of JFS2 can be used to improve reliability, availability and serviceability (RAS) if a disk failure occurs?()A
Inline loggingB
Dynamic inode allocationC
Linear directory organizationD
Online filesystem defragmentation
考题
单选题Company.com with limited AIX skills has purchased a p5-520 2-way which will run Micro-Partitions. To reduce the initial cost of purchase, the customer will be sharing the system resources using a VIO server. The customer is concerned about managing the installation of the operating system. Which of the following should the customer perform?()A
Use alt_disk_install to install AIX on all logical partitions.B
Configure the DVD as a desired resource on all partitions.C
Configure all resources as shared resources between all partitions.D
Create a separate NIM server to manage the installation of all partitions.