网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
On offshore drilling units,emergency lighting and each emergency power system must be tested at least once a().
A
day
B
week
C
month
D
year
参考答案
参考解析
解析:
暂无解析
更多 “单选题On offshore drilling units,emergency lighting and each emergency power system must be tested at least once a().A dayB weekC monthD year” 相关考题
考题
A mobile offshore drilling unit under tow is approaching a fog bank. When should fog signals be started?A.When the towing vessel enters the fogB.When the drilling rig enters the fogC.When the towing vessel can no longer be seen from the rigD.Immediately
考题
A mobile offshore drilling unit will show the day-shape in DIAGRAM 10 to indicate that it is ______.A.at anchorB.being towedC.agroundD.drilling
考题
Temporary Certificates of Inspection for offshore drilling units are effective until the ______.A.Operations Manual is approvedB.Minerals Management Service approval is issuedC.classification society approval is issuedD.permanent Certificate of Inspection is issued
考题
An offshore drilling unit is required to carry on board an operations manual approved by the ______.A.Coast GuardB.National Cargo BureauC.Minerals Management ServiceD.builder
考题
According to the regulations for mobile offshore drilling units,"industrial personnel" are considered to be all persons carried on the ship for the sole purpose of carrying out the industrial business of the unit,except for ______.A.the operator's representativeB.the crew required by the Certificate of InspectionC.the galley personnelD.the designated person in charge
考题
A heavy steel device that is set on the sea floor and used as a drilling template in offshore drilling operations is called a ______.A.temporary guide baseB.permanent guide baseC.guide frameD.foundation template
考题
To determine what navigation lights and day-shapes must be displayed on mobile offshore drilling units under tow,you should check the ______.A.American Bureau of Shipping classification rulesB.International Regulations for Preventing Collisions at SeaC.Safety of Life at Sea ConventionD.Minerals Management Service rules
考题
The emergency source of power for Mobile Offshore Drilling Units should be capable, having regard to starting currents and the transitory nature of certain loads, of supplying simultaneously at least the services specified in 5.3.6 of the 1989 MODU Code. Which one of the following service is not required to be supplied from the emergency power for a period of 18 hours?()A、Emergency lighting at every embarkation station on deck and over sidesB、Emergency lighting at the storage positions for firemen’s outfitsC、Fire and gas detection and their alarm systemD、Power to operate the watertight doors and their indicators
考题
单选题A mobile offshore drilling unit under tow is approaching a fog bank. When should fog signals be started? ()A
When the towing vessel enters the fogB
When the drilling rig enters the fogC
When the towing vessel can no longer be seen from the rigD
Immediately
考题
单选题Each emergency generator on a mobile offshore drilling unit,when tested,must be run under a full load for at least().A
one hourB
two hoursC
ten hoursD
four hours
考题
单选题On offshore drilling units,each EPIRB or SART must be tested once every().A
dayB
weekC
monthD
year
考题
单选题Temporary Certificates of Inspection for offshore drilling units are effective until the ().A
Operations Manual is approvedB
Minerals Management Service approval is issuedC
classification society approval is issuedD
permanent Certificate of Inspection is issued
考题
单选题An offshore drilling unit is required to carry on board an operations manual approved by the ().A
Coast GuardB
National Cargo BureauC
Minerals Management ServiceD
builder
考题
单选题A mobile offshore drilling unit will show the day-shape in DIAGRAM 10 to indicate that it is ().A
at anchorB
being towedC
agroundD
drilling
考题
单选题A heavy steel device that is set on the sea floor and used as a drilling template in offshore drilling operations is called a().A
temporary guide baseB
permanent guide baseC
guide frameD
foundation template
考题
单选题Under the regulations implementing MARPOL, a mobile offshore drilling unit is required to have an International Oil Pollution Prevention (IOPP) certificate when the unit ().A
is drilling on the Outer Continental ShelfB
moves to a new drilling location in U-SwatersC
engages in a voyage to a port of another country which is a party of MARPOLD
All of the above
考题
单选题Where must the master or person in charge of a ship record the date of each test of emergency lighting and power systems and the condition and performance of the equipment().A
On the Certificate of InspectionB
On the station billC
In the Operations ManualD
In either the official or unofficial log
考题
单选题To determine the number of Able Seamen required on a mobile offshore drilling unit,you should check the().A
load line certificateB
Operations ManualC
Safety of Life at Sea CertificateD
Certificate of Inspection
考题
单选题In the voyage, when carrying out abandon ship drill () should be test every time.A
the emergency lighting system for muster and abandon shipB
air oil emergency shut-downC
ME emergency operationD
main auxiliary steering gear changing
考题
单选题Which()need NOT be entered in the Official Logbook?A
The testing of the internal combustion engine driven emergency generators at least once each month the vessel is navigatedB
The testing of storage batteries for emergency lighting and power systems once each 6 months the vessel is navigatedC
The actual draft when the vessel arrives in salt water after departing a portD
The testing of the line-throwing appliance once every 3 months
考题
单选题()of the following need not be entered in the official logbook?A
The testing of the internal combustion engine driven emergency generator at least once each month the vessel is navigatedB
The testing of storage betteries for emergency lighting and systems once each 6 months the vessels is navigatedC
The actual draft when the vessel arrives in salt water after department a portD
The testing of the line-throwing appliance once every 3 months
考题
单选题An offshore drilling unit must be equipped with a first aid kit approved by the().A
Coast GuardB
American Bureau of ShippingC
Minerals Management ServiceD
Mine Safety and Health Administration
考题
单选题The emergency source of power for Mobile Offshore Drilling Units should be capable, having regard to starting currents and the transitory nature of certain loads, of supplying simultaneously at least the services specified in 5.3.6 of the 1989 MODU Code. Which one of the following service is not required to be supplied from the emergency power for a period of 18 hours?()A
Emergency lighting at every embarkation station on deck and over sidesB
Emergency lighting at the storage positions for firemen’s outfitsC
Fire and gas detection and their alarm systemD
Power to operate the watertight doors and their indicators
考题
单选题To determine what navigation lights and day-shapes must be displayed on mobile offshore drilling units under tow,you should check the().A
American Bureau of Shipping classification rulesB
International Regulations for Preventing Collisions at SeaC
Safety of Life at Sea ConventionD
Minerals Management Service rules
考题
单选题Cargo vessels being navigated,and fitted with emergency lighting and power systems,shall have their emergency systems tested at least once().A
a monthB
in each weekC
in every 6 monthsD
in every 12 months
考题
单选题The International Regulations for Preventing Collisions at Sea contain the requirements for ().A
lights that must be displayed on anchor buoysB
the display of load line markingsC
minimum horsepower for tugs involved in rig movesD
lighting of mobile offshore drilling units being towed
考题
单选题Where must the 0mster or person in charge of a ship record the date of each test of emergency lighting and power systems and the condition and performance of the equipment?()A
On the Certificate of InspectionB
On the Muster List (Station Bill)C
In the Operations ManualD
In either the official or unofficial log
热门标签
最新试卷