单选题
The division of the kilowatt load between two AC generators operating in parallel is controlled by the settings and characteristics of the ().
A
voltage regulators
B
field rheostats
C
reverse power relays
D
prime mover governors
参考答案
参考解析
解析:
暂无解析
更多 “单选题The division of the kilowatt load between two AC generators operating in parallel is controlled by the settings and characteristics of the ().A voltage regulatorsB field rheostatsC reverse power relaysD prime mover governors” 相关考题
考题
( ) can provide an asynchronous link between two ac electric power system with different nominal frequencies.
A.The HVDC (high voltage DC) transmissionB.The EHV (extra-high voltage) AC transmissionC.The AC distributionD.Generators
考题
When the prime movers of two paralleled generators are equipped with mechanical-hydraulic governors, and are operating within their designed range, the unit with the least amount of speed droop will .A.pick up more of any increase in loadB.pick up less of any increase in loadC.share an equal amount of any increase in loadD.drop an equal amount of any decrease in load
考题
The division of kilowatt load between two paralleled alternators is determined by theA.amount of field excitation of the leading machineB.load-speed characteristics of the governorsC.amount of field excitation to the lagging machineD.type of alternator
考题
While paralleling two AC generators using synchronizing lamps only, both lamps will go dark when the generators are______.A.running at the same speedB.groundedC.of the same polarityD.in phase
考题
The load sharing characteristics of two diesel generators operating in parallel are mostly dependent on their governor ______.A.load limit settingsB.idle speed settingsC.speed limit settingsD.speed droop settings
考题
Which three statements about anycast RP are true? ()A、MSDP is running between anycast RPsB、Anycast RP provides redundancy and load-sharing capabilitiesC、Multicast BGP is running between anycast RPsD、In anycast RP,two or more RPs are configured with the same multicast IP address on loopback interfacesE、In anycast RP,two or more RPs are configured with the same unicast IP address on loopback interfaces
考题
When load balancing traffic between two web servers, which of the following technologies provides the LOWEST cost solution?()A、 Active/passive clusterB、 Active/active clusterC、 Log shippingD、 DNS round robin
考题
Which of the following technologies can provide geographically based load balancing with high availability between two web servers with static content?()A、MulticastB、Active/passive clusterC、Active/active clusterD、DNS round robin
考题
单选题The division of the kilowatt load between two AC generators operating in parallel is controlled by the settings and characteristics of the ().A
voltage regulatorsB
field rheostatsC
reverse power relaysD
prime mover governors
考题
单选题Which is a function of the voltage regulators used with AC generators?()A
To cut out generators when they are no longer requiredB
To cut in additional generators automatically as requiredC
To divide the KW load equally between generators operating in parallelD
To divide reactive current between generators operating in parallel
考题
单选题Generators should have an excitation/voltage regulation system which will enable them to share the steady state reactive load () no machine exceeds its proportional share of reactive load by more than 10% of the rated reactive load of the largest generator.A
whenB
so asC
such thatD
though
考题
单选题What letter is two to the right of the letter immediately to the left of the letter that comes mid-way between the letter immediately to the left of the letter H and the letter two to the right of the letter A?A
C.B
D.C
E.D
F.
考题
单选题While paralleling two AC generators using synchronizing lamps only, both lamps will go dark when the generators are ().A
running at the same speedB
groundedC
of the same polarityD
in phase
考题
单选题When the prime movers of two paralleled generators are equipped with mechanical- hydraulic governors, and are operating within their designed range, the unit with the least amount of speed droop will ().A
pick up more of any increase in loadB
pick up less of any increase in loadC
share an equal amount of any increase in loadD
drop an equal amount of any decrease in load
考题
单选题Why is it desirable to operate paralleled AC generators at the same power factor?()A
Circulating currents are kept to a minimumB
Field excitation losses are kept to a minimumC
Generator rotors will have a lesser tendency to huntD
Because a power factor increase will decrease kilowatt output
考题
单选题Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()A
SensitivityB
PowerC
Speed droopD
Compensation
考题
单选题When load balancing traffic between two web servers, which of the following technologies provides the LOWEST cost solution?()A
Active/passive clusterB
Active/active clusterC
Log shippingD
DNS round robin
考题
多选题What are two functions that the parameter max-session performs? ()(Choose two.)ADefines the session limit for the domain.BDefines the session limit for the tunnel instance.CUsed to control load balancing between multiple domains.DUsed to control load balancing between multiple tunnels for a domain.
考题
单选题If two AC generators are to be operated in parallel, the load is distributed evenly by()A
means of rheostat the governor settingsB
a balance coil excitationC
adjusting the governor settingsD
changing excitation
考题
单选题You are attempting to parallel two AC generators, and the syncope pointer is revolving in the fast directionThis indicates that the frequency of the incoming machine is ().A
higher than the bus frequencyB
lower than the bus frequencyC
the same as the bus frequency but out of phase with itD
the same as the bus frequency and the circuit breaker may be closed at any pointer position
考题
单选题If two AC generators are operated in parallel, the load is distributed evenly by()A
a rheostatB
a balancing coilC
changing field excitationD
adjusting the governor settings
考题
单选题You have two EBGP peers connected via two parallel serial lines. What should you do to be able to load-balance between two EBGP speakers over the parallel serial lines in both directions? ()A
nothing,BGP automatically load-balances the traffic between different autonomous systems on all available linksB
peer between the eBGP speaker’s loopbacks, configuring eBGP multihop as required, and use an IGP to load-share between the two equal-cost paths between the loopback addressesC
configure a loopback as update source for both EBGP peers and have on each AS an IGP to introduce two equal-cost paths to reach the EBGP peer loopback address;it is also necessary to use the next-hop-self commandD
use the ebgp-load-balance command on the neighbor statement on both sidesE
configure a loopback as update source for both EBGP peers and have on each AS an IGP to introduce two equal-cost paths to reach the peer loopback address;it is also necessary to use the ebgp-multihop and next-hop-self commands
考题
单选题AC and DC generators are similar in that they ()A
both generate alternating voltagesB
both rectify the voltage before deliveryC
are constructed at the same physical size for the same kilowatt ratingD
both supply three-phase power
考题
单选题Which of the following technologies can provide geographically based load balancing with high availability between two web servers with static content?()A
MulticastB
Active/passive clusterC
Active/active clusterD
DNS round robin
考题
单选题If two A.C.generators are to be operated in parallel, the load is distributed evenly by()A
means of rheostat the governor settingsB
a balance coil excitationC
adjusting the governor settingsD
changing excitation
考题
单选题Prior to closing the breaker when paralleling two AC generators, the recommended practice is to have the frequency of the incoming machine ()A
slightly less than the line frequencyB
the same as the line frequencyC
slightly greater than the line frequencyD
All of the above
考题
单选题When paralleling two AC generators, the frequency of the machine coming on-line, immediately prior to closing its breaker, should be ()A
slightly less than the oncoming generator frequencyB
the same as the bus frequencyC
slightly greater than the bus frequencyD
the same as the bus voltage
考题
单选题The division of kilowatt load between two paralleled alternators is determined by the ()A
amount of field excitation of the leading machineB
load-speed characteristics of the governorsC
amount of field excitation to the lagging machineD
type of alternator