单选题
为了降低用户的总体成本,在POWER Systems中低端产品中()可以代替高级虚拟化技术中的HMC硬件控制台?
A
IVM
B
HACMP
C
SMT
D
PLM
参考答案
参考解析
解析:
暂无解析
更多 “单选题为了降低用户的总体成本,在POWER Systems中低端产品中()可以代替高级虚拟化技术中的HMC硬件控制台?A IVMB HACMPC SMTD PLM” 相关考题
考题
在实际的生产环境中,虚拟化技术主要用来解决高性能的物理硬件产能过剩和旧的硬件产能过低的重组重用,透明化底层物理硬件,从而最大化的利用物理硬件。以下不属于虚拟化技术的是()。
A、服务器虚拟化B、设备虚拟化C、存储虚拟化D、网络虚拟化
考题
论虚拟化技术对网络应用系统建设的影响随着硬件性能的不断提高和软件技术的发展,虚拟化技术逐渐进入了PC服务器领域。虚拟计算能够把服务器的计算能力进行虚拟化管理,提高服务器的可用性和管理效率。硬件厂商也纷纷推出了支持虚拟化技术的产品,如处理器虚拟化、I/O虚拟化和设备虚拟化。商用软件厂商和开源领域也推出了支持虚拟化技术的系统软件。企业用户从成本、安全性、可靠性和易于管理的角度也在考虑虚拟化技术。请围绕“虚拟化技术对网络应用系统建设的影响”论题,依次从以下3个方面进行论述。1.概要叙述你参与建设的网络工程项目及你在应用虚拟化技术的工程项目中所担任的主要工作。2.详细论述虚拟计算中的关键技术,以及你熟悉的硬件环境和软件系统对虚拟化技术的支持。3.论述在你参与建设的虚拟计算项目中所采取的相关技术,并分析应用这些技术之后对项目产生了哪些效果(或影响)?
考题
A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()A、All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or laterB、The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMCC、They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based systems connected to the existing oneD、The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM
考题
由于TPC组织不对中低端机器进行测试,那么POWER Systems中低端产品的tpc-c 是如何计算的?()A、根据CPU个数估计B、IBM自己测试结果C、根据POWER 570测试值和相关rperf推算D、以上都不对
考题
A customer currently has five partitioned POWER4 systems and is adding new systems. When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()A、Order a new HMC to support the p5 system.B、Attach the new p5 system to the existing HMC.C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.D、Do nothing. This system does not require an HMC.
考题
What is an advantage of using an HMC rather than IVM for system management?()A、Support for a single VIO Server environmentB、Adapters can be dedicated or virtual for each LPAR environmentC、Interfaces with Systems Director to manage the Power Systems serversD、Supports multiple Power Systems servers from a single point of control
考题
A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems. They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems. What is a key requirement that they need to plan for with the new HMC?()A、A desk, as it not rack mountableB、Ethernet connections to the POWER5 systemsC、Serial connections to the POWER5 systemsD、USB connections for the keyboard and mouse
考题
单选题A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()A
Purchase a second HMC and use this to manage the new servers.B
Connect all of the new servers to the existing private HMC network.C
Configure a second private network on their existing HMC for the new servers.D
Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.
考题
单选题A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()A
All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or laterB
The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMCC
They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based systems connected to the existing oneD
The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM
考题
单选题What is an advantage of using an HMC rather than IVM for system management?()A
Support for a single VIO Server environmentB
Adapters can be dedicated or virtual for each LPAR environmentC
Interfaces with Systems Director to manage the Power Systems serversD
Supports multiple Power Systems servers from a single point of control
考题
单选题A customer currently has five partitioned POWER4 systems and is adding new systems. When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()A
Order a new HMC to support the p5 system.B
Attach the new p5 system to the existing HMC.C
Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.D
Do nothing. This system does not require an HMC.
考题
单选题由于TPC组织不对中低端机器进行测试,那么POWER Systems中低端产品的tpc-c 是如何计算的?()A
根据CPU个数估计B
IBM自己测试结果C
根据POWER 570测试值和相关rperf推算D
以上都不对
考题
单选题A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems. They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems. What is a key requirement that they need to plan for with the new HMC?()A
A desk, as it not rack mountableB
Ethernet connections to the POWER5 systemsC
Serial connections to the POWER5 systemsD
USB connections for the keyboard and mouse